12/17/1999 | ICN #0005 Letter stating that construction for the captioned project was completed on December 2, 1999, filed on behalf of applicant by G. Cunningham. (1 pg.) | 1 |
09/02/1999 | ICN #0004 Letter stating that construction for this project is scheduled to start on August 30, 1999, filed on behalf of applicant by G. Cunningham. (1 pg.) | 1 |
08/04/1999 | ICN #0001 Response letter to Thomas C. Burgess, filed by K. Wissman, PUCO staff. (1 pg.) | 1 |
07/30/1999 | ICN #0002 Investigation report approving the Letter of Notification, filed by J. O'Dell, PUCO staff. (1 pg.) | 1 |
06/16/1999 | ICN #0001 In the matter of the Letter of Notification of FirstEnergy Corporation on behalf of Ohio Edison Company to construct a 0.6 mile transmission line tap from the existing Galion-Roberts South 138 kV line into the pro- posed Dual Rail Indistrial park while providing load capacity relief on the local 12.47 kV distribution system and the area 34.5 kV transmission system. (26 pgs.) | 26 |