Case Title: TOLEDO EDISON/MIDWAY SUBSTATION
Status: AR-Archived
Industry Code: EL-ELECTRIC
Purpose Code: BSB-Application for a certificate/ substation
Date Opened: 10/28/1997
Date Closed: 10/5/2001
Printable Docket Card Service List
View All
1 - 15 of 31 documents 1 /  3 
Date FiledSummaryPages
10/05/2001Memo closing this case of record.2
10/16/2000ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates.13
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates 7
10/16/2000ICN #0029 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.)6
12/14/1998Letter stating construction of the 345-138 kV substation expansion portion was completed 11/2/98; 345kV transmission construction portion was completed 11/25/98; the Midway 345- 138 kV Substation Expansion was energized on 11/25/98 filed by G. Cunningham. (1 pg)1
09/30/1998ICN #0027 Letter to Mr. Gavin L. Cunningham stating that they may proceed with construction of the portion of the project as depicted on the drawings submitted on September 10, 1998, filed by K. Wissman, PUCO staff. (1 pg.)1
09/10/1998ICN #0026 Engineering drawings for the 345 kV transmission line portion of this project, filed on behalf of applicant by G. Cunningham. (5 pgs.)5
05/07/1998ICN #0025 Letter stating that construction for this project is scheduled to start on May 4, 1998, filed on behalf of applicant by G. Cunningham. (1 pg.)1
04/30/1998ICN #0024 Response letter to Mr. Gavin L. Cunningham regarding the engineering drawings, filed by K. Wissman. PUCO staff. (1 pg.)1
04/29/1998ICN #0023 Engineering drawings, Midway Site Improvements & Fence Plan, Drawing #5B649-202, Midway Property Drainage Improvements, Drawing #5B649-203, Midway Site Management & work Limits, Drawing #5B649-206, filed on behalf of appli- cant by G. Cunningham. (3 pgs.)3
04/29/1998ICN #0022 Engineering drawings, Overall Yard Electrical Assembly Plan, Drawing #5E649-172, Overall Yard Electrical Assembly Plan, Drawing #5E649-173, filed on behalf of applicant by G. Cunningham. (3 pgs.)3
04/29/1998ICN #0020 Transcript filed for hearing held 4/15/98, (SD), 9 pgs., Submitted. (PUCO-Columbus, OH)9
04/27/1998Opinion and Order ordering that the recommendations of the staff report of investigation, to which applicant has agreed by stipulation, be approved; ordered that the certificate be issued and contain the conditions set forth in section 4 of this order. (16 pgs)16
04/23/1998ICN #0018 Proof of Publication filed on behalf of appli- cant by C. Schraff and M. Beiting. (4 pgs.) (Hancock County)4
04/13/1998ICN #0004 Proof of Publication filed on behalf of appli- cant by C. Schraff and M. Beiting. (4 pgs.) (Henry County)4
 