Case Record For:

95-0233-RR-FED

File a Public Comment
Case Title: BLOOM TOWNSHIP/CONRAIL
Status: AR-Archived
Industry Code: RR-RAILROAD
Purpose Code: FED-Federally funded warning projects
Date Opened: 2/28/1995
Date Closed: 3/13/1997
Printable Docket Card Service List
View All
1 - 6 of 6 documents 1 /  1 
Date FiledSummaryPages
03/13/1997Entry closing this case of record. (1 pg.)1
02/21/1997Memo from J. Reinhardt, PUCO staff, requesting that this case be closed due to the fact that Conrail has completed this corridor project. (1 pg.)1
01/04/1996Entry ordered that Conrail proceed with the installation of light signals and roadway gates at the crossing set forth herein and that pursuant to the terms of the stipulation the installation be completed as quickly as possible, but in any event not later than January 4, 1997. (2 pgs.)2
12/14/1995Memo from ODOT authorizing Conrail to proceed with the con- struction of the Wood County grade crossing project, filed by J. Reinhardt, PUCO staff. (4 pgs.)4
03/23/1995Entry adopting the stipulation; that the Commission pay its share of the project costs as set forth herein; that Conrail submit for Commission approval site plans and cost estimates for the installation of the corridor project within 90 days. (3 pgs.)0
02/28/1995In the matter of the corridor project in Wood County, Ohio, Bloom Township, for the installation of two automatic flashing light signals and roadway gates, reconstruction of two crossing surfaces and closure of two other crossings, Consolidated Rail Corp. (8 pgs.)0
 
1 /  1 
      
      
Attorney General:
Attorney Examiner:
Veri,Joan