Date Filed | Summary | Pages |
07/02/1993 | Report filed on behalf of applicant by E. Buzzelli. | 0 |
04/30/1992 | Letter to John Tucker, PUCO staff, stating that they are submitting their second annual report on their unit career planning program and the results of engineering studies for the twelve fossil reheat units, filed on behalf of applicant by E. Buzzelli. | 0 |
04/09/1992 | Entry granting the applicant's motion for extension of time to file the results of their engineering studies to April 30. | 0 |
03/05/1992 | Motion for an extension of time and designation of time certain to submit the results of engineering studies for production plant life extension and environmental projects, filed on behalf of applicant by C. Smith. | 0 |
03/13/1991 | Letter stating that CEI and Toledo Edison Company will be submitting a report on their unit career planning program and the results of their engineering studies for the twelve fossil reheat units which will be updated annually, filed on behalf of applicant by E. Buzzelli. (FILED 3/12/91) | 0 |
01/10/1991 | Entry granting application. | 0 |
12/21/1990 | Petition to intervene and memorandum in support filed on behalf of OCC by J. Pepper. | 0 |
12/03/1990 | Petition for leave to intervene in opposition to requested revision of applicants' depreciation accrual rates filed on behalf of IEC by L. Bell. | 0 |
10/26/1990 | In the matter of the application of the Cleveland Electric Illuminating Company for authority to modify current accounting procedures to revise its current book depreciation accrual rates for electric property and plant (other than nuclear and hydroelectric). | 0 |