DIS - Case Record for 89-1887-EL-BTX Skip to main content

Case Record For:

89-1887-EL-BTX

File a Public Comment
Case Title: CLEVELAND ELECTRIC ILLUMINATING
Status: AR-Archived
Industry Code: EL-ELECTRIC
Purpose Code: BTX-Application for a Certificate/ Gas or Electric
Date Opened: 12/14/1989
Date Closed: 4/30/1990
Printable Docket Card Service List
View All
1 - 15 of 37 documents 1 /  3 
Date FiledSummaryPages
10/16/2000ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates.13
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates 7
10/16/2000ICN #0035 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.)6
09/30/1991ICN #0034 Letter notifying Commission that the Nottingham 138kV Substation was energized and placed in service on September 5, 1991, filed on behalf of applicant by S. Louie.0
09/09/1991ICN #0033 Letter notifying Commission that construction at the Nottingham 138kV Substation was completed on August 13, 1991, and construction began on August 22, 1990, filed on behalf of applicant by S. Louie.0
08/10/1990ICN #0032 Letter stating that the City of Cleveland's contractor who will prepare the substation site will begin site activities on August l3, l990, filed on behalf of applicant by S. Louie.0
06/25/1990ICN #0031 Entry Nunc Pro Tunc ordering that the Board's Opinion, Order, and Certificate issued on April 30, l990, in this case be modified, Nunc Pro Tunc, as indicated in Finding (5); all other respects the board's Opinion, Order, and Certificate issued on April 30, l990, remain in full force and effect. (OPSB)0
05/10/1990ICN #0030 Letter confirming their understanding that the Staff of the OPSB and CEI recognize that the plan referred to in Section IV (4), page 9, of the Opinion, Order and Certificate of the OPSB in this proceeding, issued April 30, l990, is the plan fully described in Section III, therein, to address erosion, sedimentation, changes in surface runoff patterns, and other impacts to nearby surface waters, filed on behalf of CEI by C. Smith.0
04/30/1990ICN #0029 Opinion, Order, and Certificate approving the joint stipulation of findings and recommendations submitted in this proceeding; Certificate of Environmental Compatibility and Public Need for the Nottingham l38kV Substation Project is hereby issued to allow the construction, operation, and maintenance of such facility; certificate shall contain the conditioins set forth in Section IV of the Opinion. ((OPSB)0
04/26/1990ICN #0028 Transcript filed for hearing held 4/16/90, (KPW), 9 pgs., Submitted.0
04/16/1990ICN #0027 Joint stipulation filed on behalf of applicant by C. Smith and OPSB by L Angell.0
04/13/1990ICN #0026 Transcript filed for hearing held 4/5/90, (KP), 5 pgs., Con't.0
04/12/1990ICN #0025 Entry granting joint motion for a continuance of the adjudicatory hearing. (OPSB)0
04/12/1990ICN #0024 Second request for a continuance filed on behalf of applicant by C. Smith, and Staff by M. Malone.0
04/03/1990ICN #0023 Entry granting the joint motion for a continuance of the adjudicatory hearing in this matter. (OPSB)0
 
1 /  3 
      
      
Attorney General:
Attorney Examiner:
Willi,Kaye