Case Record For:

20-0004-EL-BTX

File a Public Comment
Case Title: Beaver-Wellington 138kV Transmission Line Project
Status: OPEN-OPEN
Industry Code: EL-ELECTRIC
Purpose Code: BTX-Application for a Certificate/ Gas or Electric
Date Opened: 1/2/2020
Date Closed:
Printable Docket Card Service List
View All
1 - 15 of 54 documents 1 /  4 
Date FiledSummaryPages
10/06/2023Notice of Compliance with Certificate Condition No. 3, Submission of As-Built Specifications electronically filed by Mr. Lawrence B. Hughes on behalf of American Transmission Systems, Inc.2
09/21/2023Notice of Withdrawal of Counsel Robert Eubanks (0073386) electronically filed by Mrs. Kimberly M. Naeder on behalf of PUCO.5
09/11/2023Notice of Substitution of Counsel electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.4
07/14/2023Notice of Construction Completion and Start of Facility Operations for the beaver- Wellington 138 kV Transmission Line Project electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.15
02/14/2023Correspondence Regarding Compliance Inquiry Report electronically filed by Mr. Christopher Douglass on behalf of OPSB Staff.5
10/21/2022Notice of Compliance with Certificate Condition (6), Submittal of Access Permits to Findley State Park and Wellington Wildlife Area electronically filed by Mr. Christopher K. Riedel on behalf of American Transmission Systems Incorporated.5
09/21/2022Agenda For Third Preconstruction Conference (Findley Park Segment) electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.3
07/25/2022Combined Notice of Modified Start-of-Construction Date and of Compliance with Certificate Conditions (2), (8), (9), (10), and (11) electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.149
06/29/2022Notice and Compliance with Start-of-Construction Conditions electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.12
05/25/2022Notice of Certificate of Condition (2) Submittal: Agenda For First Preconstruction Conference (Wellington Substation Expansion) electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.2
05/23/2022Clarification Regarding Notice of Compliance filed May 20, 2022 electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.2
05/20/2022Notice of Compliance with Condition 9 for Wellington Substation Expansion electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.61
01/20/2022Service Notice2
01/20/2022Opinion & Order approving the stipulation and recommendation filed by the parties and issuing a certificate of environmental compatibility and public need to American Transmission Systems, Incorporated for the construction, operation, and maintenance of the Beaver-Wellington Transmission Line Project along the preferred route, subject to the conditions set forth in this Opinion, Order, and Certificate. electronically filed by Ms. Mary E. Fischer on behalf of Ohio Power Siting Board.32
10/25/2021Transcript of hearing held 10:03 a.m. on 10/18/21 at the office of the Public Utilities Commission of Ohio, 180 East Broad Street, hearing room 11-B, Columbus, Ohio 43215 before Michael L. Williams, Attorney Examiner, at the Ohio Power Siting Board, in the matter of the application of American Transmission Systems, Incorporated, for a Certificate of Environmental Compatibility and Public Need for the Construction of the Beaver-Wellington 138-kV Transmission Line Project electronically filed by Mr. Ken Spencer on behalf of Armstrong & Okey, Inc. and Gibson, Karen Sue Mrs.10
 
1 /  4 
      
      
Attorney General:
Eubanks, Robert
Lindgren, Thomas
Attorney Examiner:
Williams, Michael