Date Filed | Summary | Pages |
12/11/2018 | Notice of Start of Construction and In-Service Date electronically filed by Ms. Christen M. Blend on behalf of AEP Ohio Transmission Power Company, Inc. | 2 |
05/23/2018 | Service Notice. | 2 |
05/23/2018 | Correspondence (Acceptance of Staff’s Condition) electronically filed by Ms. Christen M. Blend on behalf of AEP Ohio Transmission Power Company, Inc. | 2 |
05/23/2018 | Staff Report of Investigation electronically filed by Mr. Matt Butler on behalf of Staff of OPSB. | 5 |
05/07/2018 | Notice of Adjustment to Structure 151B electronically filed by Ms. Christen M. Blend on behalf of AEP Ohio Transmission Power Company, Inc. | 3 |
03/09/2018 | Proof of Compliance with the service and public distribution requirements set forth in Rule 4906-6-07) electronically filed by Ms. Christen M. Blend on behalf of AEP Ohio Transmission Power Company, Inc. | 12 |
02/28/2018 | Construction Notice electronically filed by Ms. Christen M. Blend on behalf of AEP Ohio Transmission Power Company, Inc. | 49 |
02/21/2018 | In the matter of the Pre-Application Notification Letter of AEP Ohio Transmission Company for a certificate of Environmental Compatibility and Public Need for the Poston-Lick 138kV Transmission Line Extension Project electronically filed by Ms. Christen M. Blend on behalf of AEP Ohio Transmission Power Company, Inc. | 2 |