DIS - Case Record for 13-1800-EL-BLN Skip to main content

Case Record For:

13-1800-EL-BLN

File a Public Comment
Case Title: ALLEN JUNCTION LEMOYNE #2
Status: OPEN-OPEN
Industry Code: EL-ELECTRIC
Purpose Code: BLN-letter of notification
Date Opened: 9/26/2013
Date Closed:
Printable Docket Card Service List
View All
1 - 11 of 11 documents 1 /  1 
Date FiledSummaryPages
04/08/2016Notice that construction on the Allen Junction-Lemoyne No.2 345 kV Transmission Line Project, which was approved by the Board on December 26, 2013, commenced on October 3, 2014 and was complete on October 30,2015. FIled by Nataliya Bryksenkova on behalf of FirstEnergy Service Company. 1
03/06/2015Supplemental information regarding an access road change. electronically filed by Ms. Jessica L. Thacker on behalf of FirstEnergy Service Company.2
03/04/2015Supplemental Information concerning an access road change. electronically filed by Ms. Jessica L Thacker on behalf of FirstEnergy Service Company.2
02/17/2015Notice of Engineering Change electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.4
03/04/2014Letter of Notification on the above referenced project filed on September 26, 2013 and approved December 26, 2013. In accordance with Ohio Administrative Code § 4906-5-02(A)(5), please be advised that an initial phase of construction on this project, the vegetative removal of three trees adjacent to the existing Midway Substation as shown in the attachment, is expected to begin on approximately March 10, 2014 filed by Scott Humphrys on behalf of FirstEnergy Service Company.2
12/23/2013Notice of Acceptance of Staff's Proposed Conditions and Supplement to Application electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.3
12/18/2013Report of investigation electronically filed by Mr. Adam S Bargar on behalf of Staff of OPSB6
10/16/2013Updated notification on the Allen Junction-Lemoyne #2 345 kV Transmission Line Construction Project filed by S. Humphrys on behalf of FirstEnergy Service Company.1
10/15/2013Letter of notification - Allen Junction-Lemoyne #2 345 kV Transmission Line Construction Project filed on behalf of FirstEnergy Service Company by S. Humphrys.1
09/26/2013Letter of Notification, Allen Junction-Lemoyne #2 345 kV Transmission Line Construction Project.93
09/26/2013In the matter of the letter of notification, Allen Junction-Lemoyne #2 345 kV Transmission Line Construction Project.86
 