Date Filed | Summary | Pages |
06/11/2013 | Expansion of 2.82 kW on 4/24/2013 electronically filed by Mr. Brad Bowery on behalf of Mr. Stan Oaks. | 2 |
03/22/2011 | Certificate 11-SPV-WV-GATS-0526 issued. | 3 |
02/10/2011 | Response electronically filed by Mr. Brad Bowery on behalf of Oaks, Stan Mr. | 2 |
01/18/2011 | In the matter of the application of the Stanley Oaks residence for certification as an eligible Ohio renewable energy resource generating facility electronically filed by Mr. Brad Bowery on behalf of Mr. Stan Oaks. | 13 |