CASE NUMBER: 95-0248-EL-BTX
CASE DESCRIPTION: MONONGAHELA POWER/BELMONT-RIVERVIEW
DOCUMENT SIGNED ON: 5/1/2024
DATE OF SERVICE: ________________________________________
01/18/1996 ICN #0018 Letter stating that the expansion of the River- view Substation was completed on January 5, 1996, and interim rehabilitation will be completed by the end of January, 1996, and permanent rehabilitation of the dis- trubed areas, such as reseeding, will be completed in the Spring of 1996, filed on behalf of applicant by G. Jack. (1 pg.)
09/18/1995 ICN #0017 Copy of permit from the State of Ohio, Department of Transportation concerning highway crossing for the Belmont-Riverview 138 kV line, filed on behalf of applicant by G. Jack. (5 pgs.)
08/31/1995 Letter stating drawings have been approved for the project and construction may begin filed on behalf of PUCO staff by K. Wissman. (1 pg.)
08/30/1995 ICN #0014 Complete set of engineering drawings filed on behalf of applicant by G. Jack. (1 pg.)
08/28/1995 Opinion, Order, and Certificate ordering that the stipulat- ion of findings, conclusions, and recommendation is approved and that a certificate of environmental compatibility and public need is hereby issued for the expansion. (14 pgs.)
08/04/1995 Transcript for hearing held 8/2/95, (SD), 7 pgs., summitted.
08/04/1995 Transcript for hearing held 8/1/95, (Zanesville, Ohio), (SD) 5 pgs., cont.
08/02/1995 ICN #0010 Joint stipulation of findings, conclusions and recommendations filed on behalf of applicant by G. Jack and the OPSB staff by G. Rocco. (7 pgs.)
07/19/1995 ICN #0009 Staff report filed. (24 pgs.) (FILED 7/17/95)
07/14/1995 Letter stating that applicant believes it has satisfied any requirements of the Ohio Historical Society filed by G. Jack. (3 pgs.) (ICN #0008)
06/21/1995 ICN #0007 Proof of publication filed by G. Jack. (4 pgs.)
05/26/1995 Entry scheduling a local public hearing at 7:00 p.m. on 8/1/95 in Marietta, Ohio; scheduling the adjudicatory hearing at 1:30 p.m. on 8/2/95 at the Commission offices. (AE) (3 pgs.) (ICN #0006)
05/02/1995 ICN #0005 Proof of service filed on behalf of applicant by G. Jack. (3 pgs.)
04/18/1995 ICN #0004 Letter to Mr. Gary A. Jack stating that this project has been certified as being complete, filed by the OPSB staff. (2 pgs.)
03/17/1995 ICN #0003 Entry ordering that Mon Power's motion for waiver of the time requirements and for alternate site information is granted. (OPSB) (2 pgs.)
03/02/1995 ICN #0002 Request for waiver from certain items in short- form application filed on behalf of applicant by G. Jack. (2 pgs.)
03/02/1995 ICN#0001 Short-form application for expansion of the River- view 138kV substation and relocation of Belmont-Riverview No.608 138kV transmission line proposed by Monongahela Power Company in Warren Township, Washington County, Ohio. (89pgs)