DIS - Case Record for 92-1475-EL-BGN Skip to main content

Case Record For:

92-1475-EL-BGN

File a Public Comment
Case Title: DP&L/LIGHT PEAKING FACILITY
Status: OPEN-OPEN
Industry Code: EL-ELECTRIC
Purpose Code: BGN-Application for a certificate/ generating station
Date Opened: 8/18/1992
Date Closed:
Printable Docket Card Service List
View per page
Date FiledSummaryPages
02/26/2018Return Mail, attempted not known, unable to forward. 1
02/15/2018Service Notice3
02/15/2018Entry ordered That the application to transfer the certificates from AES Generation to Tait Generating be granted in accordance with Paragraph 12.4
12/22/2017Request of AES Ohio Generation, LLC to transfer and of Tait Electric Generation Station, LLC to receive and assume certificates issued by the OPSB electronically filed by Mr. Randall V Griffin on behalf of AES Ohio Generation, LLC and Tait Electric Generating Station, LLC.12
12/22/2017Request of AES Ohio Generation, LLC to transfer and of Tait Electric Generating Station, LLC to receive and assume Certificates issued by the OPSB electronically filed by Mr. Randall V Griffin on behalf of AES Ohio Generation, LLC and Tait Electric Generating Stations, LLC.12
02/10/2016Notification of AES Ohio Generation, LLC of name change. Prior company name was DPL Energy, LLC electronically filed by Mr. Randall V Griffin on behalf of AES Ohio Generation, LLC2
02/07/2002Additional information filed on behalf of applicant by D. Specht.2
08/27/2001PUCO notification for construction 2nd report filed on behalf of applicant by D. Specht.2
02/07/2000Service Notice.4
02/07/2000ICN #0090 Entry ordering that the certificate of environmental compatibility and public need previously granted to DP&L for the construction and operation of three turbine units at the Tait Generating Station in Case No. 92-1475-EL-BGN shall be transferred to DPLE; that the certificate granted to DP&L for the construction and operation of two natural gas pipelines in Case No. 93-1049-GA-BTX shall also be transferred to DPLE; that, as a result of these transfers, DPLE shall be bound by and comply with all terms and conditions of these two certificates.3
12/29/1999ICN #089 Request for approval the transfer of a power siting certificate filed by E. Rizer on behalf of Dayton Power and Light Company.4
12/23/1999ICN #088 Request for approval the transfer of a power siting certificate filed by E. Rizer on behalf of Dayton Power and Light Company. (Fax)4
12/31/1998ICN #087 Letter stating that commercial operation for Tait Unit #3 began on December 31, 1998, filed on behalf of Dayton Power & Light by S. Miller.1
11/25/1998ICN #086 Letter stating that construction for Tait Unit #3 ended on November 19, 1998, filed on behalf of Dayton Power & Light by S. Miller1
09/17/1997ICN #085 Letter stating that construction for Tait Unit #3 began on September 9, 1997, filed on behalf of Dayton Power & Light by A. Farrell. 1
09/05/1997Oversized document: Map of site arrangement plans filed with application on 08/20/97.17
08/20/1997ICN #0084 Letter to Mr. A. A. Farrell stating that the engineering drawings submitted for this project have been reviewed, and applicant may proceed with construction of the portion of the project depicted by the drawing, filed by K. Wissman, PUCO staff. 1
08/20/1997ICN #0083 Engineering drawings filed on behalf of Dayton Power & Light by A. Farrell.2
08/20/1997ICN #0084 Letter to Mr. A. A. Farrell stating that the engineering drawings submitted for this project have been reviewed, and applicant may proceed with construction of the portion of the project depicted by the drawing, filed by K. Wissman, PUCO staff. (1 pg.)1
01/13/1997ICN #0082 Letter notifying the Commission that the commer- cial operation date for Unit #2 is December 23, 1996, filed on behalf of applicant by S. Miller. (1 pg.)1
12/11/1996Letter stating that construction ended on the second Tait combustion turbine-generator unit #2 on December 2, 1996, filed by S. Miller on behalf of Dayton Power and Light Company.1
04/15/1996ICN #0080 Letter stating that construction on the second Tait combustion turbine - generator began for Unit #2 on Apirl 2, 1996, filed on behalf of applicant by S. Miller. (1 pg.)1
03/05/1996ICN # 079 Letter to Mr. Scott A. Miller, DP&L, stating that the engineering drawings have been reviewed by the staff, and applicant may proceed with construction of the project depicted by the drawings, filed by K. Wissman, PUCO staff. 2
03/05/1996ICN #0078 Letter stating that DP&L would only be providing the site arrangement plan drawing locating major plant equipment rather than engineering drawings, filed by S. Miller on behalf of The Dayton Power and Light Company.1
06/12/1995ICN #0075 Letter stating that on June 1, 1995 the Dayton Power & Light Co. Tait Combustion Turbine Unit #1 was turned over to Operations for commercial operation and all equipment was installed per the agreement with the Ohio Power Siting Board, filed by S. Miller. (1 pg.)0
05/17/1995ICN #0074 Letter stating that on May 1, 1995, Tait CT #1 was considered mechanically and electrically complete, filed on behalf of applicant by S. Miller. (1 pg.)0
09/02/1994ICN #0073 Letter stating that the Tait site construction commencement date is August 16, 1994, filed on behalf of applicant by S. Miller. (1 pg.)0
08/10/1994ICN #0072 Correspondence letter to Kirk N. Guy, filed by K. Wissman, OPSB staff.0
07/22/1994ICN #0071 Letter stating that applicant has this day submitted one complete set of engineering drawings of the Tait Peaking Facility to the Commission staff, filed by K. Guy.0
06/13/1994ICN #0070 Correspondence letter opposing the application, filed by C. Federle.0
03/07/1994ICN #0069 Opinion, Order, and Certificate approving the joint stipulation of findings and recommendations in its entirety; that a certificate of environmental compatibility and public need is hereby issued for the construction, operation, and maintenance of three, gas-fired, combustion turbines at the preferred site. (OPSB)0
02/16/1994ICN #0068 Transcript filed for hearing held 2/2/94, (GP), 8 pgs., Submitted.0
02/15/1994ICN #0067 Response letter to Miami Township Board of Trustees, filed by Chairman C. Glazer, OPSB staff.0
02/15/1994ICN #0066 Response letter to Michael L. Schierloh, filed by Chairman C. Glazer, OPSB staff.0
02/15/1994ICN #0065 Response letter to Paul R. Beardsley, filed by Chairman C. Glazer, OPSB staff.0
02/15/1994ICN #0064 Correspondence letter supporting application, filed on behalf of the City of Dayton by M. Schierloh.0
02/02/1994ICN #0063 Management summary: Phase II Archaeological investigation of the alternate peaking facility site Montgomery County, Ohio for DP&L, submitted by Gray & Pape.0
02/01/1994ICN #0062 Joint stipulation and recommendation filed on behalf of applicant by K. Guy and the OPSB staff by M. Malone.0
01/28/1994ICN #0061 Transcript filed for hearing held 1/24/94, (GLP), 15 pgs., Submitted.0
01/26/1994INC#0060 Non-confidential answers 68-70 of the third set of interrogatories filed on behalf of the applicant by K. Guy.0
01/26/1994ICN#0059 Responses #68-70 from the third set of interrogatories filed on behalf of the applicant by K. Guy. (FILED UNDER SEAL)0
01/26/1994Letter to Mr. Glazer in support to build seven turbine generating units on the old Tait station power plant site in Moraine filed on behalf of the City of Moraine by P. Beardsley.0
01/26/1994Letter to Chairman in support of proposing to construct seven small peaking units in the Dayton area filed on behalf of the City of Dayton by M. Schierloh.0
01/25/1994ICN#0058 Staff report filed Volume II. (FILED 1-24-94)0
01/24/1994ICN#0057 Transcript filed for hearing held 1/6/94, (GP), 12 pgs, con't.0
01/24/1994ICN #0056 Reply to staff report filed on behalf of applicant. (page 26. 3rd paragraph)0
01/24/1994ICN #0055 Reply to staff report filed on behalf of applicant. (Reference No. 15)0
01/24/1994ICN #0054 Reply to staff report filed on behalf of applicant. (Reference No. 9 et al)0
01/24/1994ICN #0053 Response to interrogatories filed on behalf of applicant.0
01/21/1994ICN #0052 Entry ordering that DP&L's supplemental motion for a protective order is granted in part and denied in part; that any party wishing to review the base map and overlays should make arrangement with DP&L; that the response to the interrogatories should be redacted in accordance with Finding 7 and promptly filed with the Board; that DP&L's motion to maintain certain portions of the staff report confidential should be granted; that the staff substitute the redacted pages identified in Finding 8 for those originally contained in Volume II of the staff report and promptly refile that volume ofthe staff report in the public record. (OPSB)0
01/18/1994ICN #0051 Transcript filed for hearing held 1/7/94, (GP), 5 pgs., Con't.0
01/07/1994ICN #0050 Memorandum in response to motion of DP&L to maintain certain portions of the staff report confidential, filed on behalf of the OPSB staff by M. Malone.0
01/07/1994ICN #0049 Correspondence letter filed by C. Federle.0
01/07/1994ICN #0048 Proof of publication filed on behalf of applicant by E. Rizer.0
01/05/1994ICN #0046 Joint motion to continue hearing and request for expedited ruling and memorandum in support filed on behalf of applicant by K. Guy and the OPSB staff by D. Luckey.0
01/05/1994ICN#0047 Reply memorandum to staff's memorandum contra supplemental motion of the Dayton Power and Light Company for protective order filed by K. Guy.0
12/30/1993ICN #0045 Motion to maintain certain portions of the Staff Report of Investigation confidential, filed on behalf of applicant by K. Guy.0
12/30/1993ICN #0044 Motion to withdraw discovery filed on behalf of applicant by K. Guy.0
12/29/1993ICN #0043 Notice of withdrawal as party filed on behalf of Summit Energy Storage, Inc. by O. Collier. III.0
12/28/1993ICN #0042 Correspondence letter supporting the application, filed by Shirley E. Omietanski, Berman E. Layer, and Douglas J. Zink, Miami Township Board of Trustees.0
12/23/1993ICN #0040 Memorandum contra supplemental motion of The Dayton Power & Light Co. for protective order, filed on behalf of the OPSB staff by D. Luckey and M. Malone. (FILED UNDER SEAL)0
12/23/1993ICN #0041 Memorandum contra supplemental motion of DP&L for protective order, filed on behalf of the PUCO staff by D. Luckey and M. Malone.0
12/22/1993ICN #0039 Staff Report filed. (Volume II - FILED UNDER SEAL)0
12/22/1993ICN #0038 Staff Report filed. (Volume I)0
12/22/1993ICN #0037 Request for production of documents and inter- rogatories, First Set, filed on behalf of applicant by E. Rizer.0
12/20/1993ICN #0036 Entry granting Summit's petition for leave to intervene in Case No. 92-1475-EL-BGN; that the staff's motion for clarification of the entry issued on 11/17/93 in Case No. 92-1475-EL-BGN is granted and the entry is clarified as noted in Finding 8; that the staff file under seal, on an interim basis, those portions of its staff report in Case No. 92-1475-EL-BGN which contain information provided by DP&L under seal; that DP&L may file a request with the Board by 12/30/93 to keep con- fidential any and all information which has been filed under seal in the staff report in Case No. 92-1475-El-BGN; all replies to DP&L's request should be filed with the Board by 1/7/94. (OPSB)0
12/10/1993ICN #0035 Reply memorandum in support of petition to intervene, filed on behalf of Summite Energy Storage by O. Collier, III.0
12/10/1993ICN #0034 Supplemental motion for protective order filed on behalf of applicant by K. Guy.0
12/10/1993ICN #0033 Motion for clarifying entry filed on behalf of the OPSB staff by D. Luckey.0
12/08/1993ICN #0032 Responses to questions 87-90 and 97 filed on behalf of respondent, DP&L, by K. Guy. (FILED UNDER SEAL)0
12/07/1993ICN #0031 Memorandum contra the petition for leave to interene of Summit Energy Storage, Inc., filed on behalf of applicant by K. Guy.0
12/02/1993ICN #0030 Combined requests for production of documents and interrogatories, fourth set, filed on behalf of the PUCO staff by J. Van Niel.0
12/02/1993ICN #0029 Combined requests for production of documents and interrogatories, second set, filed on behalf of the PUCO staff by D. Luckey.0
12/02/1993ICN #0028 Copy of letter to Kirk N. Guy, DP&L, concerning Ohio Power Siting Board's combined request for production of documents, filed by D.Luckey. PUCO staff.0
11/30/1993ICN #0027 Response to staff's latest requests filed on behalf of applicant by K. Guy. (FILED UNDER SEAL)0
11/29/1993ICN#0026 Response to third set of interrogatories except No. 68-70 because of their confidentiality filed by K. Guy.0
11/23/1993ICN #0025 Petition for leave to intervene and memorandum in support filed on behalf of Summit Energy Storage, Inc. by O. Collier III.0
11/17/1993ICN #0024 Entry ordering that the discovery responses of DP&L, which it has identified as confidential, shall be filed under seal; that the Docketing Division shall remove the indentified two documents which were filed on October 15, 1993, from the public record, place them under seal, and insert the two proposed replacement paces. (OPSB)0
11/09/1993ICN #0022 Memorandum contra motion of The Dayton Power & Light Company for protective order and supplemental motion for protective order filed on behalf of the OPSB staff by D. Luckey.0
11/09/1993ICN #0023 Combined requests for production of documents and interrogatories, third set, filed on behalf of the OPSB staff by D. Luckey and M. Malone.0
11/02/1993ICN #0021 Proof of publication filed on behalf of applicant by E. Rizer.0
10/27/1993ICN#0020 Supplemental motion for protective order filed on behalf of the applicant by K. Guy.0
10/26/1993ICN#0019 Motion of DP&L for a protective order filed by K. Guy.0
10/20/1993ICN #0018 Responses to request for production of documents and interrogatories, filed on behalf of applicant by E. Rizer.0
10/15/1993ICN #0017 Entry granting DP&L's motion; scheduling a local hearing at 7:00 p.m. on 1/6/94 at the Dayton Municipal Building, Dayton, Ohio; scheduling the evidentiary hearing at 10:00 a.m. on 1/11/94 at the Commission offices. (OPSB)0
10/15/1993ICN #0016 Responses to the Ohio Power Siting Board staff's requests for production of documents and interrogatories, filed on behalf of applicant by E. Rizer.0
10/05/1993ICN #0014 Copy of check for the fee for filing the application, filed on behalf of applicant.0
10/05/1993ICN #0015 Letter regarding the typographical error in question 20 of the discovery requests served on 9/30/93, filed on behalf of the PUCO staff by D. Luckey.0
10/01/1993ICN #0013 Certificate of service filed on behalf of applicant by E. Rizer.0
09/30/1993ICN #0011 Notice of appearance filed on behalf of the OPSB staff by D. Luckey and M. Malone.0
09/30/1993ICN #0012 Combined requests for production of documents and interrogatories filed on behalf of the OPSB staff by D. Luckey and M. Malone.0
09/27/1993ICN #0010 Letter to Scott A. Miller, DP&L, stating that has been certified as being complete in accordance with Ohio Administrative Code Rule 4906-1-14 (A)(1), submitted by C. Glazer, OPSB staff.0
09/09/1993ICN #0009 Entry granting DP&L's motion for an extension and the Board's staff shall complete its review of DP&L's application by 9/24/93. (OPSB)0
09/03/1993ICN #0008 Letter requesting that this application be modified to include only simple cycle orperation, filed on behalf of applicant by T. Jenkins.0
08/23/1993ICN #0007 Motion to extend time of completeness review and memorandum in support filed on behalf of DP&L by E. Rizer.0
07/14/1993ICN #0006 Entry granting OCC's motion for waiver of the time requirements. (OPSB)0
06/24/1993ICN #0005 Application filed on behalf of applicant by T. Jenkins.0
06/24/1993ICN #0004 Motion for waiver of time requirement and memorandum in support filed on behalf of DP&L by E. Rizer.0
08/31/1992ICN #0003 Entry granting DP&L's request to waive certain preconstruction water quality data requirements. (OPSB)0
08/19/1992ICN #0002 Request for waivers of certain requirements in Ohio Administrative Code Rule 4906-13-04 filed on behalf of applicant by E. Rizer.0
08/18/1992ICN #0001 In the matter of the application of The Dayton Power & Light Company for a certificate to construct the Dayton Power & Light Peaking Facility in Montgomery County, Ohio.0