Summary: |
ICN #0090 Entry ordering that the certificate of environmental compatibility and public need previously granted to DP&L for the construction and operation of three turbine units at the Tait Generating Station in Case No. 92-1475-EL-BGN shall be transferred to DPLE; that the certificate granted to DP&L for the construction and operation of two natural gas pipelines in Case No. 93-1049-GA-BTX shall also be transferred to DPLE; that, as a result of these transfers, DPLE shall be bound by and comply with all terms and conditions of these two certificates. |
|