Summary: |
Entry ordering that GTE's proposed EAS plan is approved as modified by this entry; that GTE institute one-way, non- optional, measured-rate EAS and two-way, optional, flat-rate EAS from the North Eaton exchange to the stipulated Ameri- tech exchanges by September 3, 1997; that Ameritech insti- tute one-way, nonoptional, measured-rate EAS from the North Royalton, Strongsville and Victory exchanges to the North Eaton exchange by September 3, 1997; that this case be closed of record. (8 pgs.) |
|