Summary: |
Letter stating that the in-service date for the institution of two-way, flat rate EAS between Verizon's New Burlington exchange and Ameritech's Dayton exchange will be June 24, 2003 at 12:01 a.m., filed on behalf of Verizon North by C. Cole. |
|