Date Filed: |
7/6/1987 9:37:05 AM |
|
Document Type: |
TX-Text |
|
Link to Document: |
|
Number of pages: |
000000 |
Case Numbers: |
|
Summary: |
Letter stating that construction shall begin the second of third week in July and an electric distribution drawing 1W-T to show changes in the 138kV loop filed by T. Chaney. |
|
Source File(s): |
|
|