Date Filed: |
3/20/1992 3:04:47 PM |
|
Document Type: |
TX-Text |
|
Link to Document: |
|
Number of pages: |
000000 |
Case Numbers: |
|
Summary: |
Memo stating that all railroads have submitted the required preliminary engineering plans and construction costs with- in the 90 days of the date of the entry, filed on behalf of the PUCO staff by J. Reinhardt. |
|
Source File(s): |
|
|