Summary: |
Opinion and Order, ordered that the stipulation is approved and adopted, that a certificate be issued to CG&E for the construction, operation, and maintenance of the project as proposed along the preferred route, that the certificate contain the 32 conditions set forth in Section V of this Opinion, Order and Certificate. (OPSB) |
|