Case Number | Case Title | Open Date | Closed Date |
23-0004-EL-GAG | Center Township- Carroll County | 01/03/2023 | |
23-0006-EL-GAG | Center Township- Carroll County | 01/03/2023 | |
23-0011-EL-BNR | Beatty-Canal Street 138 kV Transmission Line Re-Termination (White Road) Project | 01/31/2023 | |
23-0012-EL-BNR | Flatlick 765 kV Station Expansion Project | 01/18/2023 | |
23-0016-EL-BNR | Duke Energy Ohio, Inc. | 01/13/2023 | |
23-0017-EL-BNR | Broadview-Tangy 138 KV Transmission Line Loop to Finley Substation | 03/15/2023 | |
23-0020-EL-AIS | In the Matter of the Application of American Transmission Systems, Incorporated for Authority to Issue, Sell, or Enter into Debt Transactions | 01/10/2023 | |
23-0023-EL-SSO | In the Matter of the Application of Ohio Power Company for Authority to Establish a Standard Service Offer | 01/06/2023 | |
23-0024-EL-AAM | In the Matter of the Application of Ohio Power Company for Approval of Certain Accounting Authority | 01/06/2023 | |
23-0025-EL-CSS | DARYL L. LOGAN SR. VS AES OHIO | 01/10/2023 | 05/08/2023 |
23-0026-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., to Adjust and Set Rider ESRR | 01/31/2023 | |
23-0027-EL-PEB | Duke Energy Ohio, Inc. | 08/21/2023 | 03/12/2024 |
23-0028-EL-BLN | Green Chapel Station Project | 01/10/2023 | |
23-0030-EL-BNR | Westfall – South Central Power 138kV Tie Line Project | 01/12/2023 | |
23-0033-EL-GAG | City of Delaware | 02/02/2023 | |
23-0035-EL-AGG | ABLE POWER MANAGEMENT, LLC | 01/11/2023 | |
23-0040-EL-BLN | Shannon-Astor 138 kV Transmission Line Project | 01/17/2023 | |
23-0042-EL-BNR | Ohio Power Company - Adkins Station Expansion Project | 03/09/2023 | |
23-0043-EL-PEB | 38077 US Hwy 36 Warsaw, Petition for Reallocation of Electric Certified Territory | 01/12/2023 | 06/07/2023 |
23-0044-EL-PEB | 37541 US Hwy 36 Warsaw, Petition for Reallocation of Electric Certified Territory | 01/12/2023 | 06/07/2023 |
23-0045-EL-BGN | Clear Mountain Energy Center, LLC | 01/12/2023 | |
23-0047-EL-BGA | Fourth Amendment Application of Guernsey Power Station LLC | 01/18/2023 | |
23-0048-EL-AGG | Energy Zebra LLC | 01/13/2023 | |
23-0049-EL-ATA | Duke Energy Ohio, Inc. | 01/13/2023 | |
23-0051-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 01/13/2023 | |
23-0054-EL-ATA | Duke Energy Ohio, Inc. | 01/31/2023 | |
23-0055-EL-GAG | Lanier Township- Preble County | 01/17/2023 | |
23-0057-EL-RDR | Application of Ohio Power Company to Update Its Basic Transmission Cost Rider. | 01/17/2023 | |
23-0059-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., for the Annual Audit of Rider SCR, Rider RE, Rider RC, and Rider ECF. | 01/31/2023 | |
23-0064-EL-BNR | Harding-Jennings 138 kV Transmission Line Structure Replacement | 01/27/2023 | |
23-0066-EL-BLN | Madison to Fayette 345kV Transmission Line Project (AES Ohio) | 02/07/2023 | |
23-0067-EL-BLN | Fayette Substation and 138kV Extension Project (AES Ohio) | 06/08/2023 | |
23-0068-EL-GAG | Miami County Commissioners | 01/19/2023 | |
23-0072-EL-AGG | Renodis ER LLC | 01/19/2023 | |
23-0073-EL-BLN | Duke Energy Ohio, Inc. | 03/09/2023 | |
23-0076-EL-BNR | Conesville - Slate 138 kV Transmission Line Project | 01/24/2023 | |
23-0081-EL-GAG | Waynesville Village-Warren County | 01/24/2023 | |
23-0084-EL-ATA | In the Matter of the Application of Ohio Power Company for Authority to New or Amended Rate Schedules and Tariffs | 01/26/2023 | |
23-0086-EL-BLN | Notice of Self-Certification of Exempt Wholesale Generator Status | 01/27/2023 | 08/15/2023 |
23-0089-EL-RDR | Duke Energy
Ohio, Inc. | 01/27/2023 | |
23-0090-EL-ACP | Market Monitoring Report | 01/26/2023 | |
23-0092-EL-RDR | In the Matter of the Application of Ohio Power Company to Update Its Smart City Rider. | 01/27/2023 | |
23-0094-EL-BNR | Duke Energy Ohio, Inc. | 02/10/2023 | |
23-0095-EL-GAG | Harveysburg Village- Warren County | 01/30/2023 | |
23-0098-EL-GAG | Massie Township- Warren County | 01/30/2023 | |
23-0099-EL-BNR | Marysville-Cadence Solar 345 kV Transmission Line | 11/06/2023 | |
23-0101-EL-RDR | In the Matter of the Application of Ohio Power Company to Adjust The Economic Development Cost Recovery Rider Rate. | 01/31/2023 | |
23-0103-EL-ACP | Renewable Portfolio Standard Report to the General Assembly for the 2021 Compliance Year | 02/01/2023 | |
23-0104-EL-BLN | In the Matter of the Letter of Notification Application for the Blossom Solar 138 kV Gen-Tie Transmission Line Project | 04/06/2023 | |
23-0105-EL-AEC | In the Matter of the Joint Application of Amazon Data Services, Inc. and Ohio Power Company for Approval of an Economic Development Arrangement for Oh | 02/02/2023 | |
23-0106-EL-RDR | IN THE MATTER OF THE REVIEW OF THE DISTRIBUTION INVESTMENT RIDER CONTAINED IN THE TARIFF OF OHIO POWER COMPANY | 03/08/2023 | |
23-0112-EL-CSS | RAYMOND ACOSTA VS IDT ENERGY | 02/07/2023 | 02/08/2024 |
23-0113-EL-UNC | Duke Energy Ohio, Inc. Significantly Excessive Earnings Test 2023 | 05/11/2023 | |
23-0115-EL-CSS | Tyler Slack vs NRG | 02/07/2023 | 08/15/2023 |
23-0117-EL-GAG | Village of Hamler | 02/08/2023 | |
23-0118-EL-ABN | American Electric Power (Ohio Power Company) | 02/10/2023 | |
23-0122-EL-BNR | Fiddlestix Switch & Poston Ross 138-kV Cut-In Project | 02/13/2023 | |
23-0123-EL-BLN | Fiddlestix Switch-Ilesboro South Central Power 138-kV Transmission Line Project | 02/13/2023 | |
23-0125-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., for Approval to Adjust Rider DDR | 02/27/2023 | |
23-0126-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., to Adjust and Set Rider DSR | 03/29/2023 | |
23-0127-EL-GAG | Lorain, Ohio | 02/13/2023 | |
23-0128-EL-ACP | RESCOM ENERGY LLC | 04/14/2023 | |
23-0130-EL-RDR | AES Ohio - Annual True-up Filing for its Transmission Cost Recovery Rider - Nonbypassable | 03/15/2023 | |
23-0134-EL-GAG | Logan County | 02/15/2023 | |
23-0136-EL-ACP | Messer Energy Services Inc. | 03/09/2023 | |
23-0140-EL-UNC | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company, and The Toledo Edison Company for Approval of a | 02/16/2023 | |
23-0141-EL-BLN | Holloway-Knox 138 kV Transmission Line Rebuild Project - Holloway Sub to Nottingham Sub Segment | 02/17/2023 | |
23-0145-EL-BGN | In the Matter of the Application of Prairie Flyer Energy Storage LLC for a Certificate of Environmental Compatibility and Public Need for an Energy St | 02/21/2023 | |
23-0146-EL-BGN | Scioto Ridge Solar LLC | 02/28/2023 | |
23-0147-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., for Authority to Adjust its Power Future Initiatives Rider | 05/17/2023 | |
23-0150-EL-CSS | Daniel Joyingo vs Energy Harbor, LLC | 02/21/2023 | 02/08/2024 |
23-0151-EL-AIS | In the Matter of the Application of The Dayton Power and Light Company d/b/a AES Ohio for Authority to Issue Certain Long-Term Debt | 02/22/2023 | |
23-0153-EL-BNR | Kileville-Shire 138 kV Tie Lines Project | 03/03/2023 | |
23-0159-EL-GAG | Village of Adena-Jefferson County | 02/23/2023 | |
23-0164-EL-ACP | MC Squared Energy Services, LLC RPS Report for 2022 | 02/28/2023 | |
23-0167-EL-BNR | North Intertie Station Expansion Project | 03/06/2023 | |
23-0169-EL-RDR | In the Matter of the Application of Ohio Power Company to Update Its Enhanced Service Reliability Rider. | 03/01/2023 | |
23-0170-EL-RDR | In the Matter of the Application of Ohio Power Company to Update Its Pilot Throughout Balancing Adjustment Rider. | 03/01/2023 | |
23-0178-EL-CSS | ANSLEY WAY LTD VS OHIO EDISON COMPANY | 03/06/2023 | 02/08/2024 |
23-0180-EL-PEB | Duke Energy Ohio, Inc. | 08/01/2023 | 03/12/2024 |
23-0181-EL-ACP | Duke Energy Ohio, Inc. 2022 RPS Compliance | 04/12/2023 | |
23-0182-EL-RDR | Dayton Power and Light Company dba AES Ohio - Authority to Recover Certain Storm-Related Service Restoration Costs | 04/03/2023 | |
23-0188-EL-BNR | Duke Energy Ohio, Inc. | 04/27/2023 | |
23-0191-EL-GAG | City of Lorain, Ohio | 03/09/2023 | |
23-0197-EL-ACP | SHIPLEY CHOICE LLC | 03/13/2023 | |
23-0203-EL-BNR | Longview-Ontario 138 kV Transmission Line Switch Replacement Project | 03/17/2023 | |
23-0229-EL-ACP | RPS Filing for Interstate Gas Supply LLC. | 03/16/2023 | |
23-0232-EL-ACP | Choice Energy, LLC - 2022 RPS Compliance Filing | 03/16/2023 | |
23-0235-EL-ACP | Titan Gas, LLC dba CleanSky Energy - RPS Compliance Report for 2022 Compliance Year | 03/21/2023 | |
23-0238-EL-ACP | Tomorrow Energy Corp RPS Compliance Filing Report | 04/07/2023 | |
23-0239-EL-CSS | Hugh Lee Dalton vs Titan Gas and Power d/b/a Clean Sky Energy | 03/17/2023 | 02/08/2024 |
23-0241-EL-BTA | Amendment to the Ross-Ginger 138 kV Transmission Line | 04/14/2023 | |
23-0247-EL-CSS | CHAY NORMENT VS OHIO EDISON / FIRST ENERGY | 03/20/2023 | 02/08/2024 |
23-0250-EL-ACP | Realgy, LLC | 03/21/2023 | |
23-0251-EL-RDR | In the Matter of the Review of Ohio Power Company's Alternative Energy Rider | 03/23/2023 | |
23-0252-EL-ACP | Major Energy Electric Services, LLC RPS compliance filing | 04/03/2023 | |
23-0253-EL-ACP | Verde Energy USA Ohio, LLC RPS compliance filing | 04/03/2023 | |
23-0256-EL-BLN | Columbus Solar Park LLC Model Landfill Solar 138 kV Gen-Tie Transmission Line Project | 03/21/2023 | |
23-0260-EL-BLN | Kiser Substation Interconnection Project- AES Ohio | 05/25/2023 | |
23-0261-EL-AIS | Ohio Power Company Application for Authority to Issue Long Term Debt | 03/22/2023 | |
23-0262-EL-AIS | Ohio Power Company Application to Issue Short-Term Debt | 03/22/2023 | |
23-0263-EL-CSS | DGK Hospitality, LLC VS AEP Energy | 03/22/2023 | 02/08/2024 |
23-0264-EL-ACP | Texas Retail Energy 2022 Renewable Portfolio Standard Status Report | 03/22/2023 | |
23-0266-EL-ACP | SmartestEnergy US, LLC 2022 OH RPS Compliance | 03/28/2023 | |
23-0269-EL-ACP | Vista Energy Marketing L.P. RPS 2022 | 03/24/2023 | |
23-0270-EL-CSS | Alan Ladd vs Dynegy Energy Services East dba Brighten Energy | 03/24/2023 | |
23-0271-EL-ACP | SFE Energy Ohio, Inc.’s Renewable Portfolio Standard (RPS) filing for 2022 | 03/27/2023 | |
23-0272-EL-ACP | StateWise Energy Ohio LLC’s Renewable Portfolio Standard (RPS) filing for 2022 | 03/27/2023 | |
23-0274-EL-AGG | EZ ENERGY SERVICES LLC | 03/27/2023 | |
23-0276-EL-ACP | Freepoint Energy Solutions LLC - Annual RPS Compliance | 04/04/2023 | |
23-0278-EL-GAG | City of Hilliard | 04/11/2023 | |
23-0279-EL-RDR | The Dayton Power and Light Company d/b/a AES Ohio | 04/17/2023 | |
23-0280-EL-ACP | The Dayton Power and Light Company d/b/a AES Ohio | 04/14/2023 | |
23-0281-EL-ATA | Duke Energy Ohio, Inc. | 03/29/2023 | |
23-0282-EL-RDR | The Dayton Power and Light Company d/b/a AES Ohio | 04/14/2023 | |
23-0284-EL-ACP | In the Matter of the 2022 RPS Compliance filing report for Josco Energy USA LLC | 03/29/2023 | |
23-0285-EL-ACP | In the Matter of the 2022 RPS Compliance filing report for Median Energy Corp | 03/29/2023 | |
23-0287-EL-ACP | Star Energy Partners RPS 2022 Filing | 03/29/2023 | |
23-0289-EL-ACP | Mpower Energy NJ LLC RPS Report for 2022 | 03/30/2023 | |
23-0290-EL-BLN | Badger Station Project | 06/14/2023 | |
23-0291-EL-ACP | American Power & Gas of Ohio, LLC RPS Annual Compliance Filing | 03/31/2023 | |
23-0292-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Direct Energy Business, LLC | 04/11/2023 | |
23-0293-EL-ATA | In the Matter of the Application of Duke Energy Ohio, Inc. for Approval of Tariff Amendments | 03/31/2023 | |
23-0294-EL-ACP | Utility Gas and Power | 03/31/2023 | |
23-0295-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Direct Energy Services, LLC | 04/11/2023 | |
23-0296-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from XOOM Energy Ohio, LLC | 04/11/2023 | |
23-0297-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Stream Ohio Gas & Electric, LLC | 04/10/2023 | |
23-0298-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Reliant Energy Northeast LLC | 04/10/2023 | |
23-0299-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Energy Plus Holdings LLC | 04/10/2023 | |
23-0300-EL-ACP | Diamond Energy East, LLC Annual RPS Compliance Filing Report | 04/05/2023 | |
23-0301-EL-SSO | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company for Authority to Pr | 04/05/2023 | |
23-0302-EL-ACP | Think Energy, LLC 2022 RPS Compliance Filing Report | 04/12/2023 | |
23-0304-EL-ACP | Renaissance Power & Gas 2022 RPS Report | 04/07/2023 | |
23-0305-EL-ACP | CleanChoice Energy 2022 RPS Report | 04/13/2023 | |
23-0306-EL-BNR | OPSB Dimmick Substation | 08/15/2023 | |
23-0308-EL-BNR | OPSB Columbia and Davis Road Roundabout Relocation | 06/30/2023 | |
23-0322-EL-CSS | Sharon Daly v. CleanSky Energy | 04/04/2023 | |
23-0323-EL-ACP | Alpha Gas and Electric, LLC 2022 OH RPS Compliance
| 04/12/2023 | |
23-0324-EL-ACP | EcoPlus Power, LLC 2022 OH RPS Compliance
| 04/12/2023 | |
23-0325-EL-ACP | Provision Power and Gas, LLC 2022 OH RPS Compliance
| 04/12/2023 | |
23-0326-EL-ACP | GreenLight, Inc. 2022 OH RPS Compliance
| 04/12/2023 | |
23-0327-EL-ACP | Grid Power Direct, LLC 2022 OH RPS Compliance
| 04/12/2023 | |
23-0328-EL-ACP | Inspire Energy Holdings, LLC 2022 OH RPS Compliance
| 04/12/2023 | |
23-0329-EL-ACP | Mega Energy of Ohio, LLC 2022 OH RPS Compliance
| 04/04/2023 | |
23-0330-EL-ACP | Park Power, LLC 2022 OH RPS Compliance
| 04/12/2023 | |
23-0331-EL-ACP | RPA Energy, Inc. 2022 OH RPS Compliance
| 04/12/2023 | |
23-0332-EL-ACP | Atlantic Energy MD LLC 2022 RPS Compliance Report | 04/06/2023 | |
23-0333-EL-ACP | Rushmore Energy, LLC 2022 OH RPS Compliance
| 04/14/2023 | |
23-0334-EL-ACP | South Bay Energy Corp. 2022 OH RPS Compliance
| 04/12/2023 | |
23-0335-EL-ACP | National Gas & Electric RPS Report for2022 | 04/04/2023 | |
23-0336-EL-ACP | RPS Compliance Report of IDT Energy, Inc. | 04/04/2023 | |
23-0337-EL-ACP | National Gas & Electric RPS Report for 2022 | 04/04/2023 | |
23-0338-EL-ACP | RPS Compliance Report of Residents Energy, LLC | 04/04/2023 | |
23-0339-EL-ACP | RPS Compliance Report of Town Square Energy East, LLC | 04/04/2023 | |
23-0341-EL-ACP | RPS Compliance Filing Report for nTherm, LLC | 04/14/2023 | |
23-0342-EL-ACP | RPS Compliance Filing for Tenaska Power Management LLC | 04/13/2023 | |
23-0343-EL-BNR | Anguin 138 kV Extension No. 1 Transmission Line Project | 04/12/2023 | |
23-0345-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 04/13/2023 | |
23-0346-EL-BTX | Lincoln Park-Riverbend 138 kV Transmission Line Project II | 04/28/2023 | |
23-0347-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Green Mountain Energy Company | 04/10/2023 | |
23-0348-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Independence Energy Group LLC | 04/11/2023 | |
23-0349-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Hudson Energy Services LLC | 04/13/2023 | |
23-0350-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Just Energy Solutions Inc. | 04/13/2023 | |
23-0352-EL-ACP | ENGIE RESOURCES LLC | 04/11/2023 | |
23-0353-EL-ACP | RPS Compliance Filing Report for All American Power and Gas OH, LLC, Calendar Year 2022. | 04/12/2023 | |
23-0354-EL-ACP | RPS Compliance Filing Report for Pure Energy USA OH, LLC, Calendar Year 2022. | 04/13/2023 | |
23-0355-EL-BLN | Innovation-Green Chapel 138 kV Transmission Line Project | 04/06/2023 | |
23-0356-EL-AGG | Miami Valley Communications Council | 04/07/2023 | |
23-0357-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Frontier Utilities Northeast LLC | 04/14/2023 | |
23-0358-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from NextEra Energy Services Ohio LLC | 04/14/2023 | |
23-0360-EL-ACP | RPS Compliance Report for Energy Harbor LLC | 04/14/2023 | |
23-0361-EL-AGG | Insuragy, LLC | 04/10/2023 | |
23-0363-EL-ACP | Land O' Lakes RPS Report 2022 | 04/10/2023 | |
23-0364-EL-ACP | Archer Energy 2022 RPS Report | 04/10/2023 | |
23-0369-EL-ACP | Aggressive Energy 2022 RPS Report | 04/11/2023 | |
23-0371-EL-ACP | Nordic Energy Services LLC: CY 2022 RPS Filing | 04/11/2023 | |
23-0372-EL-ACP | New Wave Energy 2022 RPS Report | 04/11/2023 | |
23-0373-EL-BTX | In the Matter of the Application of South Branch Solar, LLC for a Certificate of Environmental Compatibility and Public Need for Generation Transmissi | 04/12/2023 | |
23-0375-EL-ACP | 23-0400 | 04/12/2023 | |
23-0376-EL-ACP | 23-0342 | 04/12/2023 | |
23-0377-EL-ACP | Eligo Energy Annual RPS Compliance Filing Report for the 2022 Compliance Year | 04/14/2023 | |
23-0378-EL-FOR | In the Matter of the Long-Term Forecast Report of AMP Transmission, LLC and Related Matters | 04/12/2023 | |
23-0379-EL-ACP | Great American Power RPS Compliance Filing Report | 04/14/2023 | |
23-0380-EL-ACP | WGL Energy RPS Report for 2022 | 04/17/2023 | |
23-0382-EL-ACP | WGL Energy Annual RPS Compliance Filing Report for the 2022 Compliance Year | 04/12/2023 | |
23-0383-EL-CSS | CHAMPION CAMPING CLUB VS DUKE ENERGY OHIO, INC. | 04/12/2023 | 02/08/2024 |
23-0384-EL-ACP | Holcim (US) Inc. RPS Report 2022 | 04/12/2023 | |
23-0385-EL-ACP | Astral Energy Annual RPS Compliance Filing Report for the 2022 Compliance Year | 04/12/2023 | |
23-0387-EL-ACP | 2022 RPS Compliance for Calpine Energy Solutions, LLC | 04/12/2023 | |
23-0388-EL-ACP | RPS Report for ENGIE Power & Gas LLC | 04/14/2023 | |
23-0389-EL-ACP | 2022 RPS Filing for Champion Energy Services, LLC | 04/12/2023 | |
23-0390-EL-ACP | 2022 RPS Report for North American Power and Gas, LLC | 04/12/2023 | |
23-0391-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from MidAmerican Energy Services, LLC | 04/12/2023 | |
23-0392-EL-ACP | AP Gas & Electric (OH), LLC RPS Report for 2022 | 04/13/2023 | |
23-0393-EL-ACP | Calendar Year 2022 RPS Compliance Filing Report for SunSea Energy OH, LLC. | 04/13/2023 | |
23-0394-EL-ACP | In the Matter of the RPS Report for the 2022 Compliance Year of Public Power, LLC | 04/14/2023 | |
23-0395-EL-ACP | In the Matter of the RPS Report for the 2022 Compliance Year of Viridian Energy Ohio LLC | 04/14/2023 | |
23-0396-EL-ACP | In the Matter of the RPS Report for the 2022 Compliance Year of Viridian Energy PA, LLC | 04/14/2023 | |
23-0397-EL-ACP | Kiwi Energy RPS RY2022 | 04/13/2023 | |
23-0399-EL-ACP | Clearview Electric Inc. 2022 RPS Compliance Report | 04/13/2023 | |
23-0401-EL-ACP | Discount Power, Inc 2022 RPS Compliance Filing | 04/13/2023 | |
23-0403-EL-ACP | Talen Energy Marketing, LLC's Annual Compliance Filing | 04/17/2023 | |
23-0404-EL-ACP | CPV Retail Energy LP Renewable Portfolio Standard 2022 Compliance Filing Report
| 04/14/2023 | |
23-0405-EL-ACP | In the Matter of RPS Report for the 2022 Compliance Year of Ambit Northeast, LLC | 04/14/2023 | |
23-0406-EL-ACP | In the Matter of the RPS Report for the 2022 Compliance Year of Dynegy Energy Services (East), LLC | 04/14/2023 | |
23-0408-EL-ACP | In the Matter of the RPS Report for the 2022 Compliance Year of Energy Services Providers, Inc. | 04/14/2023 | |
23-0412-EL-ACP | In the Matter of the Annual Renewable Energy Status
Report of Ohio Edison Company, The Cleveland Electric Illuminating Company, and The Toledo Edison | 04/14/2023 | |
23-0413-EL-ACP | BP Energy Holding Company LLC RPS Annual Filing 2022 | 04/14/2023 | |
23-0415-EL-ACP | SmartEnergy Holdings, LLC OH RPS 2022 Compliance Filing | 04/14/2023 | |
23-0417-EL-ACP | AEP Energy Inc. Annual RPS Compliance Filing 2022 Compliance Year | 04/14/2023 | |
23-0422-EL-ACP | EnPowered USA Inc. RPS Compliance Report (2018-2022) | 04/14/2023 | |
23-0423-EL-ACP | Ohio Power Company | 04/14/2023 | |
23-0424-EL-ACP | Ohio Power Company | 04/14/2023 | |
23-0425-EL-ACP | Ohio Power Company | 04/14/2023 | |
23-0426-EL-ACP | In the Matter of the RPS Report for the 2022 Compliance Year of TriEagle Energy, LP | 04/14/2023 | |
23-0427-EL-ACP | In the Matter of the RPS Report for the 2021 Compliance Year of Everyday Energy, LLC | 04/14/2023 | |
23-0428-EL-ACP | In the Matter of the RPS Report for the 2022 Compliance Year of Everyday Energy, LLC | 04/14/2023 | |
23-0429-EL-ACP | Constellation NewEnergy, Inc. Annual RPS Report for Compliance Year 2022 | 04/17/2023 | |
23-0430-EL-ACP | Powervine Energy, LLC Annual RPS Compliance | 04/14/2023 | |
23-0431-EL-ACP | Santanna Natural Gas Corporation and Santanna Energy Services RPS Compliance Filing CY 2022 | 04/14/2023 | |
23-0432-EL-ACP | Application In the Matter of the RPS Compliance Report 2022 Compliance Year for MP2 Energy NE LLC | 04/17/2023 | |
23-0433-EL-RDR | In the Matter of the Application of Ohio Power Company to Update its Storm Damage Recovery Rider Rates | 04/17/2023 | |
23-0434-EL-ACP | American PowerNet Management LP 2022 RPS | 04/17/2023 | |
23-0435-EL-ACP | APN Starfirst LP Annual RPS Compliance Filing Report for 2022 | 04/17/2023 | |
23-0438-EL-AIS | In the Matter of the Application of The Cleveland Electric Illuminating Company for Authority to Issue, Sell, or Enter into Debt Transactions | 05/02/2023 | |
23-0439-EL-AIS | In the Matter of the Application of Ohio Edison Company for Authority to Issue, Sell, or Enter into Debt Transactions | 05/02/2023 | |
23-0451-EL-ACP | First Point Power 2022 Report | 05/03/2023 | |
23-0453-EL-RDR | Duke Energy Ohio, Inc. Rider LGR Update | 05/30/2023 | |
23-0454-EL-USF | Duke Energy Ohio, Inc. Rider USF | 04/20/2023 | |
23-0455-EL-UEX | Duke Energy Ohio, Inc. Rider UE-ED | 06/30/2023 | |
23-0456-EL-UEX | Duke Energy Ohio, Inc. Rider UE-GEN | 06/30/2023 | |
23-0457-EL-RDR | Duke Energy Ohio, Inc. Rider BTR | 07/14/2023 | |
23-0458-EL-UNC | Duke Energy Ohio, Inc. Nonpayment Service Disconnections Annual Report | 04/20/2023 | |
23-0459-EL-BGA | In the Matter of the Application of Grover Hill Wind, LLC to Amend its Certificate Issued in Case No. 20-417-EL-BGN. | 05/03/2023 | |
23-0462-EL-BLN | Leroy Center-Mayfield Q3 and Q4 138kV Transmission Lines Reconductor Project | 06/16/2023 | |
23-0467-EL-AGG | Optics Consulting, LLC | 04/25/2023 | |
23-0468-EL-CSS | Greg Graham against Energy Harbor, LLC aka FirstEnergy Solutions | 04/25/2023 | 02/08/2024 |
23-0473-EL-RDR | Dayton Power and Light dba AES Ohio | 05/26/2023 | |
23-0474-EL-BLN | South Canton - Sunnyside 138 kV Transmission Line Project | 05/11/2023 | |
23-0475-EL-BLN | South Canton - Torrey 138 kV Transmission Line Project | 05/11/2023 | |
23-0477-EL-RDR | The Dayton Power and Light Company d/b/a AES Ohio - Infrastructure Investment Rider | 05/02/2023 | |
23-0478-EL-ATA | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 04/27/2023 | |
23-0482-EL-RDR | In the Matter the Generation Energy and Generation Capacity riders for Ohio Power Company | 04/27/2023 | |
23-0483-EL-BNR | Highland-Magellan No. 1 138 kV Structure Relocation Project | 05/16/2023 | |
23-0484-EL-RDR | In the Matter of the Application of Ohio Power to Update its gridSMART Rider Rates | 04/28/2023 | |
23-0489-EL-CSS | ANTHONY L TOWNES VS OHIO EDISON COMPANY | 05/01/2023 | |
23-0492-EL-BTA | Second Amendment to the Pine Ridge-Heppner 138 kV Transmission Line | 05/17/2023 | |
23-0495-EL-BTX | MC Squared Energy Services, LLC | 05/02/2023 | |
23-0500-EL-FOR | OHIO VALLEY ELECTRIC CORPORATION | 01/03/2023 | |
23-0501-EL-FOR | AEP OHIO (OHIO POWER COMPANY) | 01/03/2023 | |
23-0502-EL-ESS | Ohio Power Company | 05/05/2023 | |
23-0503-EL-FOR | DUKE ENERGY OHIO CORPORATION | 01/03/2023 | |
23-0504-EL-FOR | FIRSTENERGY CORPORATION (OHIO EDISON COMPANY, THE CLEVELAND ELECTRIC ILLUMINATING COMPANY, THE TOLEDO EDISON COMPANY) | 01/03/2023 | |
23-0505-EL-FOR | DAYTON POWER AND LIGHT COMPANY | 01/03/2023 | |
23-0506-EL-ACP | Planet Energy RPS Compliance Report | 05/08/2023 | 12/26/2023 |
23-0516-EL-CSS | Darla Arlene Lynch vs AEP Ohio | 05/05/2023 | |
23-0526-EL-AGG | kWhours LLC | 05/05/2023 | |
23-0527-EL-ACP | Annual Adjustment of the Alternative Compliance Payment for 2023, Pursuant to 4928.64(C)(2)(b), Revised Code | 05/08/2023 | |
23-0528-EL-BLN | Hayden – Roberts 345 kV Transmission Line Cut-ins to Cosgray Station (Adjustments) Project | 05/09/2023 | |
23-0531-EL-BLN | Jerome 138 kV Station Project | 05/11/2023 | |
23-0535-EL-UNC |
In the Matter of the Application of Ohio
Power Company for Administration of the
Significantly Excessive Earnings Test for 2022 | 05/12/2023 | |
23-0536-EL-CRS | In the Matter of the Application of Papillon Productions, LLC | 05/10/2023 | |
23-0538-EL-BNR | Kammer – Dumont 765kV Transmission Line Raise | 05/31/2023 | |
23-0540-EL-CSS | ROBERT BUSEK / DIGITAL ONE VS CLEVELAND ELECTRIC ILLUMINATING COMPANY THE ( AKA THE ILLUMINATING COMPANY ) | 05/11/2023 | |
23-0541-EL-CSS | DORSEY H. THOMPSON VS IGS ENERGY INC. | 05/11/2023 | 02/08/2024 |
23-0543-EL-UNC | The Dayton Power and Light Company d/b/a AES Ohio | 05/15/2023 | |
23-0545-EL-UNC | Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company | 05/15/2023 | |
23-0546-EL-AEC | In the Matter of the Application for Establishment of a Reasonable Arrangement Between Arkon Energy USA, LLC and Ohio Power Company | 05/15/2023 | |
23-0547-EL-CSS | SHANE AND EMILY KRAMER VS IGS ENERGY | 05/15/2023 | |
23-0549-EL-RDR | IN THE MATTER OF THE ANNUAL REVIEW OF DUKE ENERGY OHIO, INC.’S DISTRIBUTION CAPITAL INVESTMENT RIDER | 06/14/2023 | |
23-0556-EL-RDR | Application of Duke Energy Ohio, Inc., for Authority to Adjust its Power Future Initiatives Rider | 05/16/2023 | |
23-0557-EL-BLN | In the Matter of the Letter of Notification Application of Cadence Solar Energy LLC to Construct the Cadence Solar Energy Center Transmission Line. | 05/18/2023 | |
23-0558-EL-BNR | F7481 Phase 2 | 06/15/2023 | |
23-0559-EL-CSS | Miami Athletic Club, Inc. against AEP Energy Inc. | 05/17/2023 | 02/08/2024 |
23-0563-EL-ABN | In the Matter of the Application of Ohio Power for Authority to Abandon Service. | 05/19/2023 | |
23-0564-EL-BNR | Hillsboro-Millbrook Park 138 kV Line Adjustment 2 Project | 05/19/2023 | |
23-0569-EL-BNR | Hedding Road-Morrow Co-op 138 kV Transmission Line Relocation Project | 06/01/2023 | |
23-0570-EL-BLN | Hedding Road Switch and West Mount Vernon-North Waldo 138 kV Relocation Project | 06/01/2023 | |
23-0576-EL-BNR | South Point – Portsmouth 138-kV Transmission Line Tie-in Project | 05/23/2023 | |
23-0579-EL-GAG | City of Lima (Allen County) | 05/23/2023 | |
23-0583-EL-BLN | Spickard Station and Hillsboro-Clinton 138 kV Cut-in Project | 07/18/2023 | |
23-0584-EL-BNR | Spickard-Dodson Creek Solar 138 kV Generation Tie Line Project | 07/20/2023 | |
23-0589-EL-ATA | Ohio Edison - Pole Attachment Tariff Update | 12/21/2023 | |
23-0590-EL-ATA | Cleveland Electric Illuminating Company - Pole Attachment Tariff Update | 12/21/2023 | |
23-0591-EL-ATA | Toledo Edison - Pole Attachment Tariff Update | 12/21/2023 | |
23-0598-EL-CSS | Benjamin Florkey against AES Ohio | 05/26/2023 | |
23-0601-EL-UNC | In the Matter of SmartEnergy Holdings, LLC | 05/30/2023 | |
23-0603-EL-USF | Application of the Ohio Development Services Agency for an Order Approving Adjustments to the Universal Service Fund Riders | 05/31/2023 | |
23-0611-EL-BNR | Sidney-Franklin 138kV Transmission Line Adjustment Project- AES Ohio | 06/09/2023 | |
23-0612-EL-CRS | CRES Application - AES Solutions Management | 05/31/2023 | |
23-0631-EL-BLN | Anguin 138 kV Extension No. 2 and No. 3 Transmission Line Project | 06/08/2023 | |
23-0632-EL-BNR | Anguin - Babbitt 138 kV Transmission Line Adjustment Project | 06/08/2023 | |
23-0643-EL-BTA | Amendment to the Groves Road-Shannon 138 kV Transmission Line Project | 06/12/2023 | |
23-0646-EL-BNR | Buckeye Co-Op Extension Fayette 138kV Pole Installation Adjustment Project | 06/07/2023 | |
23-0648-EL-BTX | Philo Newcomerstown 138 kV Transmission Line Project (East New Concord Switch - Norfield Switch) | 07/18/2023 | |
23-0650-EL-BTA | In the Matter of the Application of Firelands Wind, LLC to Amend/Modify its Certificate Issued in Case No. 19-1073-EL-BTX. | 07/06/2023 | |
23-0651-EL-GAG | City of Middletown | 07/07/2023 | |
23-0653-EL-GAG | City of South Lebanon | 07/07/2023 | |
23-0656-EL-BLN | West Dover 138 kV Transmission Line Relocations Project | 06/14/2023 | |
23-0657-EL-BLN | Beacon Station Project | 06/09/2023 | |
23-0669-EL-GAG | Bridge Energy Services LLC (CRES) Governmental Aggregator Application | 06/23/2023 | |
23-0677-EL-CSS | Mark W Bellamy vs AEP Ohio | 06/15/2023 | |
23-0688-EL-BLN | Green Chapel Extension 138 kV Transmission Line Project | 07/11/2023 | |
23-0691-EL-BLN | BEACON STATION PROJECT | 06/22/2023 | |
23-0694-EL-BNR | Speidel-Barnesville 138 kV Cut-in to Pumpkin Station Project | 06/28/2023 | |
23-0695-EL-AGG | CHAUTAUQUA ENERGY MANAGEMENT INC | 06/23/2023 | |
23-0696-EL-CSS | Etta Hughes / Brenda Jennings vs AES Ohio | 06/26/2023 | |
23-0705-EL-BNR | Hartman Farms 138 kV Extension No. 6 Transmission Line Project (Phase 2) | 06/29/2023 | |
23-0710-EL-AGG | Competitive Retail Electric Service (CRES) Provider Application | 06/28/2023 | |
23-0713-EL-BGN | In the Matter of the Application of Mink Solar LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-Powered Elect | 07/05/2023 | |
23-0714-EL-PEB | Duke Energy Ohio, Inc. | 12/07/2023 | 07/02/2024 |
23-0727-EL-GAG | City of Hillsboro | 07/06/2023 | |
23-0737-EL-CRS | AEP Energy Partners, Inc | 07/07/2023 | |
23-0750-EL-AGG | Liberty Ventures | 07/14/2023 | |
23-0757-EL-BLN | Letter of Notification of Clean Energy Future – Trumbull, LLC for the Trumbull Energy Center Electrical Interconnection | 07/18/2023 | |
23-0759-EL-GAG | Washington County | 07/19/2023 | |
23-0771-EL-CSS | CLIFFORD L. RUCKER VS DUKE ENERGY | 07/24/2023 | |
23-0779-EL-UNC | In the Matter of the Application of the Ohio Department of Development to Adjust Ohio Power Company’s 2023 Universal Service Fund Rider Rate | 07/25/2023 | |
23-0781-EL-UNC | In the Matter of the Proposed Modifications to the Electric Distribution Utilities’ Standard Service Offer Procurement Auctions. | 07/26/2023 | |
23-0785-EL-BNR | Beaver-Black River 138 kV Transmission Line Tap to Serve AMPT Project | 08/22/2023 | |
23-0793-EL-RDR | In the Matter of the Application of Ohio Power Company to Adjust the Economic Development Cost Recovery Rider Rate. | 07/31/2023 | |
23-0795-EL-BNR | Cosgray-Rivendell No. 1 and No. 2 345 kV Tie Lines Project | 08/01/2023 | |
23-0796-EL-BGN | In the Matter of the Application of Frasier Solar, LLC for a Certificate of Environmental Compatibility and Public Need | 08/09/2023 | |
23-0797-EL-BLN | Cyprus 138 / 345 kV Station Expansion Project | 08/03/2023 | |
23-0798-EL-AEC | In the Matter of the Application for Establishment of a Reasonable Arrangement Between the City of Akron and Ohio Edison Company. | 08/17/2023 | |
23-0802-EL-AGG | Power 2 Profit Energy Solutions Inc | 08/08/2023 | |
23-0804-EL-AEC | The Dayton Power and Light Company dba AES Ohio | 08/10/2023 | |
23-0812-EL-BNR | Brookside-Henrietta 138 kV Transmission Line Switch Replacement Project | 08/14/2023 | |
23-0813-EL-CSS | PATRICIA SHAFFER VS A.E.P | 08/14/2023 | |
23-0818-EL-RDR | The Dayton Power and Light Company d/b/a AES Ohio - Distribution Investment Rider | 08/17/2023 | |
23-0819-EL-REN | Kalmbach REK Solar | 08/16/2023 | |
23-0821-EL-BNR | Duke Energy Ohio, Inc. OPSB Aicholtz Pole Relocation | 08/17/2023 | |
23-0823-EL-WVR | In the Matter of the Application of Duke Energy, Ohio, Inc. for Continuation of Waiver | 11/17/2023 | |
23-0826-EL-PEB | Duke Energy Ohio, Inc. | 10/06/2023 | 03/12/2024 |
23-0828-EL-CSS | Simon & Tiffany Demmons vs AES Ohio | 08/21/2023 | |
23-0829-EL-BNR | Broadview – Tangy 138 kV Transmission Line Switch Replacement Project | 09/07/2023 | |
23-0830-EL-EDI | Adoption of Electronic Data Interchange Standards and Uniform Business Practices for the Electric Industry | 08/24/2023 | |
23-0832-EL-CSS | Ms. Saabirah Desai vs AEP | 08/23/2023 | |
23-0836-EL-BLN | Huntley 138 kV Extension Cut-in, Scherers Switch, and Scherers Switch-Alexander 138 kV Transmission
Line Project
| 08/29/2023 | |
23-0839-EL-REN | Independence Wind Farm | 08/25/2023 | |
23-0844-EL-BTA | Amendment to the Wood County 138 kV Reinforcement Project | 09/26/2023 | |
23-0846-EL-ATA | In the Matter of the Application of Duke Energy Ohio, Inc. for Rider LM & TD Update | 09/06/2023 | |
23-0847-EL-AGG | AGR GROUP NEVADA LLC | 09/01/2023 | |
23-0848-EL-RDR | Dayton Power and Light Company - Authority to Recover Certain Storm-Related Service Restoration Costs | 09/06/2023 | |
23-0850-EL-BLN | Poth Extension East and West 138 kV Transmission Line Project | 09/15/2023 | |
23-0851-EL-BNR | E. Broad St. – Bexley 138 kV Transmission Line Cut-In Project | 09/19/2023 | |
23-0852-EL-BNR | Jug Street – Corridor 345 kV Transmission Line Cut-in to Badger Station Project | 09/13/2023 | |
23-0855-EL-BLN | Madison to Fayette 345 kV Transmission Line Adjustment Project (South Section) | 09/11/2023 | |
23-0857-EL-AGG | Arbor Energy Brokerage Services LLC Application for Aggregator and Power Broker Certificate | 09/08/2023 | |
23-0858-EL-AEC | In the Matter of the Joint Application of Amazon Data Services, Inc. and Ohio Power Company for Approval of a Reasonable Arrangement | 11/14/2023 | |
23-0859-EL-ATA | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company, and The Toledo Edison Company for Approval of Ta | 09/11/2023 | |
23-0864-EL-ATA | In the Matter of the Application of Duke Energy Ohio, Inc. for Authority to Adjust its Green Power / Carbon Offset Rider | 10/06/2023 | |
23-0866-EL-AEC | In the Matter of the Application for Establishment of a Reasonable Arrangement Between Crown56, LLC and Ohio Power Company | 09/13/2023 | |
23-0867-EL-UNC | Duke Energy Ohio, Inc. | 09/29/2023 | |
23-0869-EL-AIS | The Dayton Power and Light Company d/b/a AES Ohio | 09/15/2023 | |
23-0872-EL-BNR | ATSI’s Sammis Star 345kV Transmission Line and Sammis Wellsville 345kV Transmission Line Structure Replacement Project | 10/04/2023 | |
23-0881-EL-AGG | National Auditing Services & Consulting LLC d/b/a National Auditing Services | 09/22/2023 | |
23-0883-EL-AIS | AEP Ohio Transmission Company, Inc. Application for Authority to Issue Long-Term Debt | 09/22/2023 | |
23-0884-EL-AIS | AEP Ohio Transmission Company, Inc. Application for Authority to Issue Short-Term Debt | 09/22/2023 | |
23-0886-EL-BNR | Chrysler-Maclean 138 kV Transmission Line Tap to First Solar PGT-4 Substation Project. | 10/23/2023 | |
23-0887-EL-BNR | South Canton – West Canton 138kV Transmission Line Cut-In (Reedurban) Project | 09/25/2023 | |
23-0890-EL-BTX | West Watertown - Watertown 138 kV Transmission Line Project | 10/03/2023 | |
23-0891-EL-AEC | In the Matter of the Application of Ohio Power Company and New Albany Data Center, LLC for Approval of a Reasonable Arrangement Under R.C. 4905.31 and | 09/28/2023 | |
23-0893-EL-RDR | In the Matter of the 2023 Review of the Delivery Capital Recovery Rider of Ohio Edison Company, the Cleveland Electric Illuminating Company, and the T | 10/27/2023 | |
23-0898-EL-UNC | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company, and the Toledo Edison Company for Approval of a | 09/27/2023 | |
23-0900-EL-AGG | BCG Consulting Group LLC Application for Power Broker Certificate | 09/27/2023 | |
23-0902-EL-CSS | Barry Williams vs Ohio Edison (Case No.ID 00829223) | 09/27/2023 | |
23-0903-EL-REN | Prevailing Wind Park | 09/27/2023 | |
23-0904-EL-REN | Crow Lake Wind Farm | 09/27/2023 | |
23-0905-EL-REN | Prairiewinds ND1 | 09/27/2023 | |
23-0906-EL-GAG | Riley Township, Sandusky Co. | 09/28/2023 | |
23-0909-EL-BLN | New Camp Washington Substation and Transmission Line Installation | 12/18/2023 | |
23-0913-EL-RDR | Ohio Edison Company | 10/02/2023 | |
23-0914-EL-RDR | The Cleveland Electric Illuminating Company | 10/02/2023 | |
23-0915-EL-RDR | The Toledo Edison Company | 10/02/2023 | |
23-0918-EL-CSS | Spectrum Mid-America, LLC v. Ohio Power Company | 10/02/2023 | |
23-0919-EL-BNR | Harrison Extension 138 kV Pole Replacement Project | 10/05/2023 | |
23-0920-EL-BNR | Three Creeks 138 kV Switch Bypass Pole Project | 10/02/2023 | |
23-0921-EL-CSS | Brandon Shelt vs First Energy Corp (The Illuminating Company) | 10/03/2023 | |
23-0922-EL-CSS | Debra L. Clark vs The Illuminating Co. / NOPEC/ IGS | 10/03/2023 | |
23-0923-EL-UNC | In the Matter of the Procurement of Standard Service Offer Generation for Customers of The Dayton Power and Light Company d/b/a AES Ohio. | 10/03/2023 | |
23-0925-EL-UNC | In the Matter of the Application of Ohio Power Company for Approval of in Bill Format | 10/03/2023 | |
23-0926-EL-RDR | In the Matter of the Quarterly Reports of Rider DCI Schedules for Duke Energy Ohio, Inc. | 11/03/2023 | |
23-0927-EL-ACE | Lall Solar | 10/03/2023 | |
23-0928-EL-ACP | GreenLight, Inc. 2021 OH RPS Compliance | 10/04/2023 | |
23-0930-EL-BGN | In the Matter of the Application of Richwood Solar, LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-Powered | 10/05/2023 | |
23-0931-EL-BGN | Stark Solar, LLC | 11/14/2023 | |
23-0935-EL-AGG | Stanwich Energy Advisors LLC | 10/06/2023 | |
23-0936-EL-BGA | Oregon Clean Energy Future-Oregon, LLC for a Third Amendment to its Certificate | 10/20/2023 | |
23-0937-EL-BNR | Anguin 138 kV Extension No. 1 (Phase 2) Transmission Line Project | 10/13/2023 | |
23-0938-EL-CSS | Victor and Pamela Bando vs American Electric Power Ohio | 10/10/2023 | |
23-0939-EL-CSS | Victor Bando vs American Electric Power (AEP) | 10/11/2023 | |
23-0940-EL-RDR | Duke Energy Ohio, Inc. | 11/30/2023 | |
23-0948-EL-AEC | In the Matter of the Application for Establishment of a Reasonable Arrangement Between SAI US, Inc. and Ohio Power Company | 10/13/2023 | |
23-0951-EL-BNR | American Transmission Systems, Incorporated London-Tangy 138 kV Transmission Line Tap Project | 11/06/2023 | |
23-0952-EL-BNR | American Transmission Systems, Incorporated London-Tangy 138 kV Transmission Line Tap Project | 12/01/2023 | |
23-0953-EL-BLN | American Transmission Systems, Incorporated, Angola-Eber-Vulcan 138 kV Transmission Line Rebuild and Wentworth Substation Expansion Project | 11/17/2023 | |
23-0956-EL-AIS | In the Matter of the Application of Ohio Edison Company for Authority to Issue, Renew, or Assume Liability on Notes and Other Evidences of Indebtednes | 10/16/2023 | |
23-0957-EL-AIS | In the Matter of the Application of The Cleveland Electric Illuminating Company for Authority to Issue, Renew, or Assume Liability on Notes and Other | 10/23/2023 | |
23-0958-EL-AIS | In the Matter of the Application of The Toledo Edison Company for Authority to Issue, Renew, or Assume Liability on Notes and Other Evidences of Indeb | 10/23/2023 | |
23-0959-EL-AIS | In the Matter of the Application of American Transmission Systems, Incorporated for Authority to Issue, Renew, or Assume Liability on Notes and Other | 10/23/2023 | |
23-0961-EL-BNR | Conesville-Corridor 345 kV Cut-in and Innovation-Mordor 138 kV Tie Lines #1 & #2 Project | 10/20/2023 | |
23-0963-EL-AIS | In the Matter of the Application of Ohio Valley Electric Corporation for Authority to Issue Evidence of Short-Term Indebtedness | 10/24/2023 | |
23-0964-EL-PEB | Duke Energy Ohio, Inc. | 10/17/2023 | |
23-0965-EL-BNR | Lemoyne-Midway 138 kV Tranmission Line Structure Addition Project | 11/02/2023 | |
23-0966-EL-AGG | Stanwich Energy Advisors | 10/17/2023 | |
23-0968-EL-CSS | Imperium Fitness LLC against Duke Energy Ohio | 10/18/2023 | |
23-0969-EL-GAG | Morrow County Commissioners | 10/18/2023 | |
23-0970-EL-BNR | Kileville-Shire No. 3 and No. 4 138 kV Tie Lines Project | 10/20/2023 | |
23-0976-EL-AGG | FRONTIER ENERGY CONSULTANTS LLC | 10/23/2023 | |
23-0983-EL-ACP | RPS Compliance Filing Report for the 2019 Compliance Year ResCom Energy LLC | 10/27/2023 | |
23-0984-EL-ACP | RPS Compliance Filing Report for the 2020 Compliance Year ResCom Energy LLC | 10/27/2023 | |
23-0985-EL-BLN | Elk Extension North 138kV Line Adjustment Project | 12/06/2023 | |
23-0986-EL-BNR | Elk - Vinton 138kV Extension Project | 12/06/2023 | |
23-0988-EL-AGG | LowerEbill LLC Application for Competitive Retail Electric Service (CRES) Provider | 10/26/2023 | |
23-0991-EL-AGG | EIQhome, LLC Application for Competitive Retail Electric Service (CRES) Provider Certificate | 11/06/2023 | |
23-0992-EL-ESS | AEP OHIO (OHIO POWER COMPANY) | 01/03/2023 | |
23-0993-EL-ESS | FIRST ENERGY CORPORATION (OHIO EDISON COMPANY, THE CLEVELAND ELECTRIC ILLUMINATING COMPANY, THE TOLEDO EDISON COMPANY) | 01/03/2023 | |
23-0994-EL-ESS | DUKE ENERGY OHIO INC | 01/03/2023 | |
23-0995-EL-ESS | DAYTON POWER AND LIGHT COMPANY | 01/03/2023 | |
23-0996-EL-ESS | AEP OHIO (OHIO POWER COMPANY) | 01/03/2023 | |
23-0997-EL-ESS | FIRST ENERGY CORPORATION (OHIO EDISON COMPANY, THE CLEVELAND ELECTRIC ILLUMINATING COMPANY, THE TOLEDO EDISON COMPANY) | 01/03/2023 | |
23-0999-EL-ESS | DUKE ENERGY OIHO INC | 01/03/2023 | |
23-1000-EL-ESS | DAYTON POWER AND LIGHT COMPANY | 01/03/2023 | |
23-1001-EL-ESS | OHIO VALLEY ELECTRIC CORPORATION | 01/03/2023 | |
23-1005-EL-AGG | Stanwich Energy Advisors | 10/30/2023 | |
23-1007-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 10/30/2023 | |
23-1009-EL-BLN | Kileville-Jerome 138 kV Transmission Line Project | 11/01/2023 | |
23-1013-EL-BLN | Knox-Nottingham 138 kV Transmission Line Rebuild Project - New Stacy BUC to Nottingham Sub Segment | 10/31/2023 | |
23-1016-EL-ESS | In the Matter of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company's programs for inspection, maintenance | 11/02/2023 | |
23-1017-EL-RDR | In the Matter of the Commission’s Review of the Phase 3 GridSMART Project of Ohio Power Company. | 11/01/2023 | |
23-1021-EL-BNR | West Van Wert – Delphos Center 138kV Line Adjustment Project | 11/15/2023 | |
23-1023-EL-AGG | Choose Energy, Inc. | 11/03/2023 | |
23-1025-EL-CSS | Rehina Savchuk VS Cleveland Electric Illuminating Co | 11/06/2023 | |
23-1027-EL-AGG | WILLIAM C GOULECHE INC | 11/06/2023 | |
23-1031-EL-RDR | In the Matter of Updating the Solar Generation Fund Rider | 11/13/2023 | |
23-1032-EL-CSS | Cincinnati Insurance Company and Dysinger Inc vs AES Ohio LLC | 11/09/2023 | |
23-1034-EL-RDR | Dayton Power and Light Co. dba AES Ohio | 11/27/2023 | |
23-1041-EL-RDR | Duke Energy Ohio, Inc. Rider SGF Annual Filing | 11/15/2023 | |
23-1042-EL-RDR | AES Ohio Solar Generation Fund Rider | 11/13/2023 | |
23-1044-EL-BLN | Waverly – Lick 138 kV Transmission Line Relocation | 11/13/2023 | |
23-1045-EL-BLN | Conesville-Corridor 345 kV Transmission Line Adjustment Project (Bermuda and Curley Stations) | 11/16/2023 | |
23-1046-EL-BNR | Bixby-Marion Road 138 kV Prop Pole Project | 11/17/2023 | |
23-1050-EL-BLN | Hayden-Roberts 345 kV Cut-in (Beacon Station) and Beacon-Darby 345 kV Tie Lines Project | 11/15/2023 | |
23-1052-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 11/15/2023 | |
23-1053-EL-BNR | Mount Perry 138 kV Extension Project | 12/06/2023 | |
23-1054-EL-BNR | Mount Perry 138 kV Switch Project | 12/06/2023 | |
23-1060-EL-ACP | EcoPlus Power, LLC 2021 Ohio Alternative Energy Portfolio Standard Status Report | 11/17/2023 | |
23-1062-EL-GAG | City of Coshocton | 11/22/2023 | |
23-1066-EL-AGG | Stanwich Energy Advisors, LLC - CRES Application | 11/17/2023 | |
23-1067-EL-AGG | Stanwich Energy Advisors CRES Application 2023 | 11/20/2023 | |
23-1070-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 12/01/2023 | |
23-1071-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 12/01/2023 | |
23-1072-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 12/01/2023 | |
23-1073-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 12/01/2023 | |
23-1074-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 12/01/2023 | |
23-1075-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 12/01/2023 | |
23-1076-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 12/01/2023 | |
23-1077-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 12/01/2023 | |
23-1078-EL-CSS | Sherman C. Green vs American Electric Power Ohio | 11/21/2023 | |
23-1079-EL-CSS | Nathan E. Frey vs American Electric Power Ohio | 11/21/2023 | |
23-1088-EL-GAG | Village of Jacksonburg | 12/07/2023 | |
23-1089-EL-GAG | Reily Township, Butler County | 12/11/2023 | |
23-1090-EL-GAG | Oxford Township, Butler County | 12/13/2023 | |
23-1091-EL-GAG | City of Fairfield | 12/13/2023 | |
23-1093-EL-GAG | Village of Seven Mile | 11/27/2023 | |
23-1097-EL-UNC | In the Matter of the Procurement of Standard Service Offer Generation for Customers of Ohio Power Co. | 11/27/2023 | |
23-1098-EL-BLN | Celtic 345 kV Station Project | 12/11/2023 | |
23-1100-EL-RDR | Duke Energy Ohio, Inc. Rider LGR Update | 12/01/2023 | |
23-1102-EL-CSS | Fredrick Vonderhaar Vs Duke Energy Corporation | 11/30/2023 | |
23-1106-EL-RDR | IN THE MATTER OF THE ANNUAL REVIEW OF THE DISTRIBUTION INVESTMENT RIDER CONTAINED IN THE TARIFF OF THE DAYTON POWER AND LIGHT COMPANY d/b/a AES OHIO | 12/01/2023 | |
23-1107-EL-GAG | Village of Fairfax | 12/19/2023 | |
23-1109-EL-GAG | City of Grandview Heights | 12/04/2023 | |
23-1110-EL-GAG | Harrison Township, Montgomery County | 12/27/2023 | |
23-1112-EL-GAG | Village of Lincoln Heights | 12/04/2023 | |
23-1113-EL-GAG | Village of Mariemont | 12/04/2023 | |
23-1117-EL-GAG | Milford Township, Butler County | 12/20/2023 | |
23-1118-EL-GAG | Ross Township, Butler County | 12/27/2023 | |
23-1120-EL-GAG | Wayne Township, Butler County | 12/19/2023 | |
23-1132-EL-RDR | Ohio Power Company’s Distribution Investment Rider Work Plan. | 12/11/2023 | |
23-1133-EL-BNR | Anguin 138 kV Extension No. 5 Transmission Line Project | 12/13/2023 | |
23-1134-EL-REN | White Cloud Wind Project | 12/13/2023 | |
23-1135-EL-BTA | In the Matter of the Application of Grover Hill Wind, LLC to Amend its Certificate Issued in Case No. 22-269-EL-BTX | 12/21/2023 | |
23-1138-EL-ACP | Renewable Portfolio Standard Report to the General Assembly for the 2022 Compliance Year | 12/14/2023 | |
23-1141-EL-CSS | Hubbard Township Board of Trustees vs. Ohio Edison / FirstEnergy | 12/15/2023 | |
23-1142-EL-CSS | Robert Lane vs Duke Energy | 12/15/2023 | |
23-1143-EL-WVR | THE DAYTON POWER AND LIGHT COMPANY D/B/A AES OHIO | 12/15/2023 | |
23-1145-EL-AGG | F & D Partners Inc | 12/20/2023 | |
23-1173-EL-ACP | Diamond Energy East, LLC 2023 RPS Compliance Report | 12/28/2023 | |
23-1175-EL-CSS | Michael Jansing vs Duke Energy | 12/29/2023 | |
23-1176-EL-RDR | The Dayton Power and Light Company d/b/a AES Ohio - DIR Work Plan 2024 | 12/29/2023 | |
23-1501-EL-FOR | AEP OHIO TRANSCO | 01/03/2023 | |
23-7000-EL-FAD | ARCHIVE COMMISSION DOCUMENTS/ELECTRIC | 01/03/2023 | |