2022 Cases with Industry Code "EL" ELECTRIC (334%20cases)

Case NumberCase TitleOpen DateClosed Date
22-0005-EL-CSSRE-USE01/03/2022 
22-0007-EL-BLNLondon-Tangy 138 kV Transmission Line Tap to Mitchell Delivery Point Substation01/14/2022 
22-0009-EL-CSSJENNIFER R. MILLS VS AEP ( REALGY ENERGY )01/03/202202/08/2024
22-0010-EL-BLNHillsboro-Millbrook Park 138 kV Circuit Rebuild Adjustment Project01/18/2022 
22-0011-EL-BNRDuke Energy Ohio, Inc01/10/2022 
22-0012-EL-BNRDuke Energy Ohio, Inc01/10/2022 
22-0015-EL-CSSRich Throckmorton vs AEP Ohio01/05/202202/02/2023
22-0016-EL-CSSALAN JONES vs THE ILLUMINATING COMPANY01/05/2022 
22-0018-EL-RDRIn the Matter of the Application of Duke Energy Ohio, Inc., to Adjust and Set Rider ESRR.01/31/2022 
22-0019-EL-ATAIn the Matter of the Application of Duke Energy Ohio, Inc., for Approval of Tariff Amendments.01/31/2022 
22-0020-EL-RDRIn the Matter of the Application of Duke Energy Ohio, Inc., for the Annual Audit of Rider SCR, Rider RE, Rider RC, and Rider ECF.01/31/2022 
22-0021-EL-RDRIn the Matter of the Application of Duke Energy Ohio, Inc., for Approval to Adjust Rider DDR.03/01/2022 
22-0028-EL-CSSPEGGY DILLOW VS. AEP ENERGY, INC.01/11/202209/02/2022
22-0037-EL-RDRIn the Matter of the Commission's Review of the Ohio Power Company's Distribution Investment Rider Work Plan 202201/14/2022 
22-0039-EL-BNRAngola-Midway 138 kV Transmission Line Relocation at Monclova Road Project02/22/2022 
22-0041-EL-RDRIn the Matter of the Application of Ohio Power Company to Update Its Basic Transmission Cost Rider01/18/2022 
22-0049-EL-CSSINDIA DAVIS AND DENZEL JACOBS VS AES OHIO01/20/202212/19/2022
22-0053-EL-BLNDelta-Wauseon 138 kV Transmission Line Tap to Nova Tube Steel Substation02/02/2022 
22-0054-EL-RDRThe Dayton Power and Light Company Storm Cost Recovery Rider02/16/2022 
22-0055-EL-CSSWilla McNutt VS AEP01/24/202208/15/2023
22-0058-EL-BLNConesville-Corridor 345 kV Transmission Line Adjustment Project02/07/2022 
22-0070-EL-CRSCatalyst Power & Gas LLC01/27/2022 
22-0071-EL-RDRIn the Matter of the Application of Ohio Power Company to Update Its Smart City Rider01/28/2022 
22-0073-EL-CSSRamona Baggott vs Ohio Edison Company01/28/202202/02/2023
22-0075-EL-AGGEnergia Power LLC01/28/2022 
22-0078-EL-CSSBoris Grinberg VS Santanna Energy Services01/31/202204/26/2023
22-0079-EL-CRSOctopus Energy LLC.02/02/2022 
22-0080-EL-ATAThe Dayton Power and Light Company d/b/a AES Ohio 03/09/202212/19/2022
22-0081-EL-RENGuren, Zachary01/31/2022 
22-0088-EL-RDRIn the Matter of the Application of Ohio Power Company to Adjust The Economic Development Cost Recovery Rider Rate02/01/2022 
22-0089-EL-RDRIN THE MATTER OF THE DISTRIBUTION INVESTMENT RIDER CONTAINED IN THE TARIFF OF OHIO POWER COMPANY02/01/2022 
22-0090-EL-BNRBeatty-Canal Street 138 kV Cut-In Project02/11/2022 
22-0093-EL-AGGOption One Energy, LLC02/07/2022 
22-0094-EL-BGNIn the Matter of the Application of Springwater Solar, LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-Power02/18/2022 
22-0107-EL-FORIn the Matter of the Long-Term Forecast and Resource Plan of Duke Energy Ohio, Inc. 02/14/2022 
22-0112-EL-ACPMesser Energy Services Incs' Annual Alternative Energy Portfolio Status Report - 2021 ACP Compliance Filing 02/15/2022 
22-0115-EL-BGAWillowbrook Solar I, LLC Application for a Second Amendment02/18/2022 
22-0116-EL-BLNSouthwest Lima Station Expansion and Southwest Lima-West Moulton 138 kV Line Adjustment Project02/17/2022 
22-0117-EL-BTXApplication of Circleville Solar, LLC for a Certificate of Environmental Compatibility and Public Need for Overhead Generation Tie Transmission Line 02/16/2022 
22-0122-EL-BLNIn the Matter of the Letter of Notification Application of Pleasant Prairie Solar Energy LLC to Construct the Pleasant Prairie Solar Energy Center Tra08/30/2022 
22-0125-EL-RDRIn the Matter of the Application of Duke Energy Ohio, Inc., to Adjust and Set Rider DSR.03/30/2022 
22-0126-EL-ATAIn the Matter of the Application of Duke Energy Ohio, Inc., for Approval of Tariff Amendments.03/30/2022 
22-0128-EL-UNCIn the Matter of Ambit Northeast, LLC02/16/2022 
22-0129-EL-AGGCoho Climate Advisors, LLC02/16/2022 
22-0131-EL-BLNThe Southwest Lima Station Expansion and Southwest Lima-West Moulton 138 kV Line Adjustment Project02/17/2022 
22-0133-EL-ATRIn the Matter of the Joint Petition of Ohio Power Company and AEP Ohio Transmission Company, Inc. for Affiliated Transactions Agreement for Sharing Ma02/24/2022 
22-0139-EL-BLNDayton Power & Light - Amsterdam-W.Moulton 138kV Improvements05/12/2022 
22-0140-EL-BLNDayton Power & Light - Sidney- Franklin Honda 138kV Rebuild/Extension08/19/202208/15/2023
22-0151-EL-BGNIn the Matter of the Application of Blossom Solar, LLC for a Certificate of Environmental Compatibility and Public Need03/01/2022 
22-0152-EL-RDRAES Ohio - Annual True-up Filing for its Transmission Cost Recovery Rider - Nonbypassable03/15/2022 
22-0153-EL-BNRSifford-Ruble 138 kV Tie Lines Project03/02/2022 
22-0154-EL-BLNLima – Fort Wayne 138 kV Transmission Rebuild Project03/08/2022 
22-0155-EL-BNRWest Lancaster-Bixby 138 kV Extension 03/02/2022 
22-0157-EL-CRSCPV RETAIL ENERGY LP 03/01/2022 
22-0159-EL-RDRIn the Matter of the Application of Ohio Power Company to Update Its Pilot Throughput Balancing Adjustment Rider03/01/2022 
22-0163-EL-RDRIn the Matter of the Application of Duke Energy Ohio, Inc., for Authority to Adjust its Power Future Initiatives Rider. 03/31/2022 
22-0164-EL-ATADuke Energy Ohio, Inc.03/04/202204/14/2023
22-0169-EL-CRSBio Energy Strategy and Tactics03/03/202204/26/2023
22-0173-EL-BNRBlendon Extension 138 kV Pole Replacement Project03/04/2022 
22-0174-EL-ATRDuke Energy Ohio, Inc.03/09/2022 
22-0175-EL-BNRWest Moulton-Amsterdam 138 kV Transmission Line Project03/29/2022 
22-0176-EL-ACPMC Squared Energy Services, LLC 2021 RPS Report03/14/2022 
22-0177-EL-AISIn the Matter of the Application of Ohio Valley Electric Corporation for authority to issue evidence of indebtedness, in the form of long-term securit03/10/2022 
22-0178-EL-ACPTomorrow Energy Corp RPS Compliance Report04/07/2022 
22-0182-EL-CSSEdward Jackson v. Duke Energy Ohio, Inc.03/11/2022 
22-0184-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2021 of Energy Plus Holdings LLC04/14/2022 
22-0185-EL-ACPGreen Mountain Energy Company - 2021 RPS Compliance Report04/08/2022 
22-0186-EL-ACPIndependence Energy Group LLC - 2021 RPS Compliance Report04/08/2022 
22-0187-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2021 of Reliant Energy Northeast LLC04/14/2022 
22-0188-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2021 of Stream Ohio Gas & Electric, LLC04/14/2022 
22-0189-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2021 of XOOM Energy Ohio, LLC04/14/2022 
22-0190-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2021 of Direct Energy Services, LLC04/13/2022 
22-0191-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2021 of Direct Energy Business, LLC04/14/2022 
22-0192-EL-ACPShipley Choice LLC 2021 RPS Compliance Report03/17/2022 
22-0193-EL-CSSLLOYD E. JACKSON VS SMARTENERGY HOLDINGS LLC & THE ILLUMINATING COMPANY 03/14/202202/08/2024
22-0194-EL-ACPChoice Energy LLC d/b/a 4 Choice Energy LLC RPS for the 2021 Compliance Year03/14/2022 
22-0195-EL-ACPDuke Energy Ohio, Inc. 2021 RPS Compliance 04/11/2022 
22-0196-EL-ACPMajor Energy Electric Services LLC - 2021 RPS Compliance Report04/05/2022 
22-0197-EL-ACPRPS Compliance Filing - Verde Energy USA Ohio, LLC04/05/2022 
22-0199-EL-AISOhio Power Company Application to Issue Short-Term Debt03/15/2022 
22-0200-EL-AISOhio Power Company Application to Issue Long-Term Debt03/15/2022 
22-0201-EL-CSSTECUMSEH LANDING LLC VS AES OHIO 03/15/202202/08/2024
22-0202-EL-ACPUtility Gas and Power03/15/2022 
22-0212-EL-CRSCatalyst Power & Gas LLC03/16/2022 
22-0215-EL-ACPBP Energy Retail LLC 2021 Annual RPS Compliance Report03/16/2022 
22-0222-EL-UNCIn the Matter of the Application of Ohio Power Company for Approval of a Change in Bill Format03/16/2022 
22-0223-EL-BGAClean Energy-Trumbull, LLC Application for an Amendment to the Certificate of Environmental Compatibility and Public Need03/18/2022 
22-0224-EL-ACPIn the matter of the 2021 RPS Compliance Filing Report for Josco Energy USA LLC 03/21/2022 
22-0225-EL-ACPIn the Matter of the 2021 Compliance Year RPS Compliance Filing Report for Median Energy Corp.03/21/2022 
22-0234-EL-ATAIn the Matter of the Application of Duke Energy Ohio, Inc., for Approval of Tariff Amendments.03/21/2022 
22-0237-EL-CSSAPRIL DAVIS VS THE ILLUMINATING COMPANY03/21/2022 
22-0241-EL-ACPVista Energy Marketing L.P. 2021 RPS Report03/22/2022 
22-0244-EL-AISThe Dayton Power and Light Company d/b/a AES Ohio03/28/2022 
22-0245-EL-ACPSFE Energy Ohio, Inc.’s Renewable Portfolio Standard (RPS) filing for 202103/23/2022 
22-0246-EL-ACPStateWise Energy Ohio LLC's Renewable Portfolio Standard (RPS) filing for 202103/23/2022 
22-0247-EL-CSSSteven H Kitchen vs Ohio Edison Company 03/23/202202/08/2024
22-0248-EL-BTXDowling-Fulton 345 kV Transmission Line Tap to Melbourne Substation04/29/2022 
22-0250-EL-BTXEvans-Sub5-Darrow 138 kV Transmission Line Project07/25/2022 
22-0251-EL-RPTAnnual RPS Compliance Filing for Grand Energy, LLC03/23/2022 
22-0252-EL-ACPAnnual RPS Compliance Filing for Grand Energy, LLC 04/04/2022 
22-0253-EL-BLNWestfall Station Project07/11/2022 
22-0254-EL-BLNCyprus-Parsons 138 kV Transmission Line Project04/06/2022 
22-0256-EL-ACPTitan Gas, LLC dba CleanSky Energy - RPS Compliance Report for 2021 Compliance Year03/23/2022 
22-0268-EL-ACPRealgy Energy Service RPS Compliance Report03/28/2022 
22-0269-EL-BTXIn the Matter of the Application of Grover Hill Wind, LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Transmission04/07/2022 
22-0274-EL-ACPMpower Energy NJ LLC RPS Report for 202103/30/2022 
22-0277-EL-EDIEDI Implementation Guidelines04/06/2022 
22-0279-EL-CSSIn the Matter of the Complaint of Duke Energy Ohio, Inc. vs. Nationwide Energy Partners, LLC03/30/2022 
22-0285-EL-BLNKnox-Nottingham 138 kV Transmission Line Rebuild Project - Kilgore (Polo Road)-New Stacy Buc Segment 03/31/2022 
22-0287-EL-RDRThe Dayton Power and Light Co. dba AES Ohio04/18/202205/01/2023
22-0288-EL-ACPAnnual RPS Filing for ResCom Energy, LLC04/01/2022 
22-0289-EL-ACPAnnual RPS Filing for nTherm, LLC04/01/2022 
22-0291-EL-CSSDOMINIQUE TAPPLAR VS DUKE ENERGY OHIO, INC04/01/202202/08/2024
22-0293-EL-ACPIDT Energy's 2021 RPS Report 04/04/2022 
22-0294-EL-ACPResidents Energy's 2021 RPS Report04/04/2022 
22-0295-EL-ACPTown Square Energy's 2021 RPS Report04/04/2022 
22-0296-EL-ACPFreepoint Energy Solutions LLC - 2021 RPS Compliance Report04/11/2022 
22-0297-EL-UNCDuke Energy Ohio, Inc. Significantly Excessive Earnings Test 2022 05/12/2022 
22-0298-EL-ACPAlpha Gas and Electric, LLC 2021 RPS Compliance04/13/2022 
22-0299-EL-ACPProvision Power and Gas, LLC 2021 RPS Compliance04/14/2022 
22-0300-EL-ACPGrid Power Direct, LLC 2021 RPS Compliance04/13/2022 
22-0301-EL-ACPInspire Energy Holdings, LLC 2021 RPS Compliance04/13/2022 
22-0302-EL-ACPKiwi Energy NY, LLC 2021 RPS Compliance04/13/2022 
22-0303-EL-ACPMega Energy of Ohio, LLC 2021 RPS Compliance04/13/2022 
22-0304-EL-ACPPark Power, LLC 2021 RPS Compliance04/12/2022 
22-0305-EL-ACPSouth Bay Energy Corp. 2021 RPS Compliance04/12/2022 
22-0306-EL-ACPRushmore Energy, LLC 2021 RPS Compliance04/14/2022 
22-0308-EL-ACPRPA Energy, Inc. 2021 RPS Compliance04/13/2022 
22-0315-EL-CSSWILLIAM R. McKINNEY VS DUKE ENERGY OHIO, INC.04/04/2022 
22-0322-EL-ACPEngie Resources LLC - 2021 RPS Report04/13/2022 
22-0323-EL-ACPEngie Retail LLC - 2021 RPS Report04/13/2022 
22-0325-EL-ACPINTERSTATE GAS SUPPLY04/06/2022 
22-0326-EL-ACPEnergy Harbor LLC 2021 RPS Compliance Report04/12/2022 
22-0327-EL-ACPThe Dayton Power and Light Company d/b/a AES Ohio04/15/2022 
22-0328-EL-PEBOhio Power Company - Petition for Reallocation of Electric Certified Territory04/05/202210/03/2022
22-0329-EL-ACPArcher Energy 2021 RPS Filing04/08/2022 
22-0334-EL-ACPWGL Energy Services, Inc. RPS Report for 202104/15/2022 
22-0335-EL-ACPsmartestenergy LLC - 2021 RPS Compliance Filing04/08/2022 
22-0336-EL-AGGOhio Energy Management LLC04/11/2022 
22-0337-EL-ACPTexas Retail Energy - 2021 RPS Compliance Status Report04/07/2022 
22-0340-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company04/27/2022 
22-0341-EL-ACPNordic Energy Services, LLC - 2021 RPS Compliance Report04/08/2022 
22-0342-EL-ACPTenaska Power Management - 2021 RPS Compliance Report04/11/2022 
22-0343-EL-ATAIn the Matter of the Application of Duke Energy Ohio, Inc. to Amend its Rider LM and Rate TD04/08/2022 
22-0344-EL-ACPAP Gas & Electric (OH), LLC RPS Report for 202104/08/2022 
22-0345-EL-ACPOhio Power Company04/14/2022 
22-0346-EL-ACPOhio Power Company04/14/2022 
22-0347-EL-ACPOhio Power Company04/14/2022 
22-0349-EL-ACPHolcim (US) Inc. RPS Report for 202104/08/2022 
22-0352-EL-AGGNEXUS ENERGY GROUP LTD.04/11/2022 
22-0353-EL-ACPAmerican Power & Gas of Ohio LLC - 2021 RPS Compliance Report04/12/2022 
22-0355-EL-ACPPlanet Energy - 2021 RPS Compliance Report04/11/2022 
22-0356-EL-PEBOhio Power Company - Petition for Reallocation of Electric Certified Territory 04/11/202208/22/2022
22-0357-EL-PEBOhio Power Company - Petition for Reallocation of Electric Certified Territory - Warner Rd. 04/11/202208/22/2022
22-0358-EL-ACPFirst Point Power RPS Report04/14/2022 
22-0360-EL-ACPNational Gas & Electric, LLC RPS Report for 202104/11/2022 
22-0361-EL-ACPCleanChoice Energy, Inc. RPS Compliance Report04/15/2022 
22-0362-EL-FORIn the Matter of the Long-Term Forecast Report of AMP Transmission, LLC and Related Matters04/12/2022 
22-0363-EL-ACPENGIE Power & Gas LLC - 2021 RPS Compliance Report04/12/2022 
22-0364-EL-ACPSummer Energy Midwest RPS Compliance Filing04/12/2022 
22-0366-EL-ACPELIGO ENERGY OH, LLC04/12/2022 
22-0367-EL-ESSIn the Matter of the Update to Ohio Power Company's program for Maintenance, Repair and Inspection of Transmission and Distribution Line as Required b04/12/2022 
22-0368-EL-ACPPBF Power Marketing LLC RPS Report for 202104/12/2022 
22-0369-EL-ACPNew Wave Energy Corporation - 2021 RPS Compliance Report04/12/2022 
22-0371-EL-ACPLand O' Lakes, Inc. - 2021 RPS Report 04/15/2022 
22-0373-EL-RDRThe Dayton Power and Light Company d/b/a AES Ohio04/15/202205/01/2023
22-0374-EL-ACPSmartEnergy Holdings LLC - 2021 RPS Compliance Report04/13/2022 
22-0375-EL-ACPRenaissance Power & Gas Inc. 2022 OH RPS Compliance Report04/15/2022 
22-0376-EL-ACPDiscount Power Inc. - 2021 RPS Compliance Report04/13/2022 
22-0377-EL-ACPAstral Energy LLC RPS Report for 202104/13/2022 
22-0378-EL-ACPTalen Energy Marketing, LLC RPS Compliance Filing Report 2021 Compliance Year04/13/2022 
22-0379-EL-ACPMidAmerican Energy Services, Inc. - 2021 RPS Compliance Report04/13/2022 
22-0380-EL-RENBarton 204/13/2022 
22-0381-EL-ACPSunwave USA Holdings Inc. RPS Fiine04/13/2022 
22-0382-EL-ACPPowervine Energy LLC - 2021 RPS Compliance Report04/14/2022 
22-0383-EL-ACPGreat American Power LLC - 2021 RPS Compliance Report04/14/2022 
22-0384-EL-ACPHudson Energy Services LLC's RPS Compliance Report for Calendar Year 202104/14/2022 
22-0385-EL-ACPJust Energy Solutions Inc.'s RPS Compliance Report for Calendar Year 202104/14/2022 
22-0386-EL-ACPClearview Electric, Inc. - 2021 RPS Compliance Report04/14/2022 
22-0389-EL-ACPIn the Matter of the RPS Compliance Report for Calendar Year 2021 of Frontier Utilities Northeast LLC04/14/2022 
22-0390-EL-ACPIn the Matter of the RPS Compliance Report for Calendar Year 2021 of NextEra Energy Services Ohio, LLC04/14/2022 
22-0391-EL-RDRIN THE MATTER OF THE REVIEW OF THE NON-MARKET-BASED SERVICES RIDER PILOT PROGRAM ESTABLISHED BY OHIO EDISON COMPANY, THE CLEVELAND ELECTRIC ILLUMINAT04/20/2022 
22-0392-EL-ACPAtlantic Energy MD LLC - 2021 Compliance Report04/14/2022 
22-0393-EL-ACPAMERICAN POWERNET MANAGEMENT LP04/15/2022 
22-0394-EL-ACPAPN STARFIRST LP04/15/2022 
22-0395-EL-ACPApplication In the Matter of the RPS Compliance Report 2021 Compliance Year for MP2 Energy NE LLC04/14/2022 
22-0396-EL-ACPAEP Energy, Inc. RPS Compliance Filing Report 2021 Compliance Year04/14/2022 
22-0397-EL-ACPIn the Matter of Alternative Energy Portfolio Status Report for Compliance Year 2021 for Constellation NewEnergy, Inc.04/14/2022 
22-0398-EL-ACPVolunteer Energy Services, Inc.04/14/2022 
22-0399-EL-RDROhio Power Company 04/14/2022 
22-0400-EL-ACPStar Energy Partners LLC - 2021 RPS Compliance Report04/14/2022 
22-0401-EL-ACPAll American Power and Gas OH, LLC RPS Report for 202104/14/2022 
22-0402-EL-ACPPure Energy USA OH, LLC RPS Report for 202104/14/2022 
22-0403-EL-BNRBuckeye Co-Op Extension-Fayette 138 kV Pole Installation Project05/13/2022 
22-0404-EL-ACPCleveland-Cliffs Steel 2021 RPS Compliance Filing Report04/14/2022 
22-0405-EL-RPTRPS Reporting for 2021 for Calpine Energy Solutions, LLC04/14/2022 
22-0406-EL-ACP2021 RPS Reporting for Calpine Energy Solutions, LLC04/14/2022 
22-0408-EL-ACP2021 RPS Reporting for Champion Energy Services, LLC04/14/2022 
22-0412-EL-ACP2021 AEPS Filing for North American Power and Gas, LLC04/15/2022 
22-0413-EL-ACPSunSea Energy OH, LLC RPS Report for 202104/15/2022 
22-0417-EL-ACPIn the Matter of the Annual Renewable Energy Status Report of Ohio Edison Company, The Cleveland Electric Illuminating Company, and The Toledo Edison 04/15/2022 
22-0422-EL-ACPAmerican Powernet Management, LP RPS Annual Report04/15/2022 
22-0423-EL-ACPIn the Matter of RPS Report for the 2021 Compliance Year of Ambit Northeast, LLC04/15/2022 
22-0424-EL-ACPIn the Matter of the RPS Report for the 2021 Compliance Year of Cincinnati Bell Energy, LLC04/15/2022 
22-0425-EL-ACPIn the Matter of the RPS Report for the 2021 Compliance Year of Dynegy Energy Services (East), LLC04/15/2022 
22-0426-EL-ACPIn the Matter of the RPS Report for the 2021 Compliance Year of Energy Services Providers, Inc.04/15/2022 
22-0427-EL-ACPIn the Matter of the RPS Report for the 2021 Compliance Year of Everyday Energy, LLC04/15/2022 
22-0428-EL-ACPIn the Matter of the RPS Report for the 2021 Compliance Year of Public Power, LLC04/15/2022 
22-0429-EL-ACPPure Energy USA OH, LLC Report for 202104/15/2022 
22-0430-EL-ACPIn the Matter of the RPS Report for the 2021 Compliance Year of TriEagle Energy, LP04/15/2022 
22-0431-EL-ACPIn the Matter of the RPS Report for the 2021 Compliance Year of Viridian Energy PA, LLC04/15/2022 
22-0432-EL-ACPIn the Matter of the RPS Report for the 2021 Compliance Year of EDF Energy Services, LLC04/15/2022 
22-0433-EL-ACPAll American Power and Gas OH, LLC RPS Report for 202104/15/2022 
22-0434-EL-CSSVickie A. Swartzbaugh vs Dayton Power and Light Company04/15/202208/26/2022
22-0435-EL-CSSDavid Schifer vs Ohio Edison Company04/15/202202/08/2024
22-0436-EL-RPTSantanna Energy Services - 2021 RPS Compliance Report04/18/2022 
22-0437-EL-ACPStarion Energy PA, Inc.04/18/2022 
22-0442-EL-CSSROBERT R MURPHY VS AEP OHIO04/19/2022 
22-0443-EL-CSSROBERT R MURPHY VS AEP OHIO04/19/202202/08/2024
22-0445-EL-BNRDuke Energy Ohio, Inc. 04/22/2022 
22-0447-EL-BLNArboles Station 138 kV Transmission Line Adjustments Project 06/13/2022 
22-0450-EL-CSSROBERT A. NEIDERT VS OHIO EDISON04/22/202202/02/2024
22-0451-EL-BNRDuke Energy Ohio, Inc.05/05/2022 
22-0452-EL-BLNDuke Energy Ohio, Inc.05/25/2022 
22-0456-EL-RDRThe Dayton Power and Light Company Storm Cost Recovery Rider06/30/2022 
22-0462-EL-ACPAggressive Energy04/27/2022 
22-0468-EL-BNRDuke Energy Ohio, Inc.05/06/2022 
22-0469-EL-BGNIn the Matter of the Application of Richwood Solar, LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-Powered 04/29/2022 
22-0470-EL-BGNIn the Matter of the Application of Stark Solar, LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-Powered Ele04/29/2022 
22-0471-EL-BGAUnion Ridge Solar, LLC 05/06/2022 
22-0472-EL-RDROhio Power Company 04/29/2022 
22-0473-EL-RDROhio Power Company04/29/2022 
22-0477-EL-RDRThe Dayton Power and Light Company d/b/a AES Ohio 05/02/2022 
22-0482-EL-UNCOhio Power Company - Administration of the Significantly Excessive Earnings Test 05/13/2022 
22-0484-EL-CSSJelena Strugar vs The Cleveland Electric Illuminating Company05/05/2022 
22-0486-EL-RDROhio Power Company05/05/2022 
22-0488-EL-BLNCosgray Station Project05/09/2022 
22-0494-EL-BTAAmendment to the Beaver-Wellington 138 kV Transmission Line Project10/20/2022 
22-0495-EL-BLNCarlisle-Shinrock 138 kV Transmission Line Relocation05/10/2022 
22-0500-EL-FOROhio Valley Electric Corporation02/15/2022 
22-0501-EL-FORAEP (Ohio Power Company)02/15/2022 
22-0503-EL-FORDuke Energy of Ohio Corporation02/15/2022 
22-0504-EL-FORFirst Energy Corporation (Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company)02/15/2022 
22-0505-EL-FORDayton Power and Light Company02/15/2022 
22-0512-EL-BNRCyprus 138 kV Extension Adjustment Project05/11/2022 
22-0514-EL-UNCThe Dayton Power and Light Company d/b/a AES Ohio05/16/2022 
22-0515-EL-BNRDuke Energy Ohio, Inc.07/22/2022 
22-0524-EL-CRSCLE POWER INC 05/13/2022 
22-0525-EL-UNCOhio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company05/16/2022 
22-0530-EL-AGGONIX ENERGY LLC 05/16/2022 
22-0535-EL-RDRIN THE MATTER OF THE REVIEW OF DUKE ENERGY OHIO, INC.’S DISTRIBUTION CAPITAL INVESTMENT RIDER05/18/2022 
22-0542-EL-RDRDUKE ENERGY OHIO - LGR Rider Update05/25/2022 
22-0547-EL-RDRTHE DAYTON POWER AND LIGHT COMPANY D/B/A AES Ohio 05/31/202205/01/2023
22-0549-EL-BGNIn the Matter of the Application of Oak Run Solar Project, LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-05/26/2022 
22-0550-EL-BTXIn the Matter of the Application of Oak Run Solar Project, LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Transmi05/26/2022 
22-0552-EL-CSSFRED L HARRIS VS AEP OHIO05/25/202202/08/2024
22-0553-EL-BNRDuke Energy Ohio, Inc.07/15/2022 
22-0556-EL-USFApplication of the Ohio Development Services Agency for an Order Approving Adjustments to the Universal Service Fund Riders05/27/2022 
22-0561-EL-CSSMITCHELL STAPLES vs PLANET ENERGY OHIO CORP.06/01/2022 
22-0562-EL-BLNRichland-East Leipsic 138 kV Transmission Line Rebuild Project06/16/2022 
22-0563-EL-BNRCanton Central Station Expansion and Line Adjustment Project06/28/2022 
22-0564-EL-BNRLima – Fort Wayne 138 kV Transmission Tie-Lines into Gomer Station Project06/02/2022 
22-0565-EL-CSSCLAIRDY WALKER VS DUKE ENERGY OHIO, INC.06/02/202202/08/2024
22-0567-EL-BNRMarion Road-Mound Street 138 kV Transmission Line Underground Project – East Fulton Street Adjustment 06/03/2022 
22-0569-EL-BLNDuke Energy Ohio, Inc. 06/06/2022 
22-0571-EL-CSSJUDITH IRVIN vs AES OHIO06/07/202208/15/2023
22-0573-EL-ATRIn the Matter of the Joint Petition of ) Ohio Power Company and AEP Ohio ) Transmission Company, Inc. for Approval of ) Transfer of Utility Assets. 06/07/2022 
22-0574-EL-BNREast Amsterdam-Carroll Co-Op 138 kV Line08/08/2022 
22-0577-EL-BNRDelano Station Expansion 07/21/2022 
22-0579-EL-BNRDelano-Salt City Solar 138 kV Line Project06/21/2022 
22-0591-EL-GAGMiami Township, Montgomery County, OH06/13/2022 
22-0597-EL-BLNMidway-Richland-Wauseon 138 kV Transmission Line Three Terminal Line Elimination Project06/16/2022 
22-0599-EL-GAGCity of Bellbrook06/16/2022 
22-0604-EL-UEXDuke Energy Ohio, Inc. Rider UE-ED06/30/2022 
22-0605-EL-UEXDuke Energy Ohio, Inc. Rider UE-GEN06/30/2022 
22-0617-EL-RDRDuke Energy Ohio, Inc. Rider BTR07/15/2022 
22-0627-EL-BTXDayton Power and Light-West Manchester-Blazer-Hodgin 138kV Transmission Line Project10/11/2022 
22-0633-EL-BLNHayden – Roberts 345 kV Transmission Line Cut-ins to Cosgray Station Project07/15/2022 
22-0640-EL-ACPIn the Matter of the Alternative Energy Resource Compliance Report for Calendar Year 2021 of Entrust Energy East, Inc.06/27/2022 
22-0641-EL-BNRNottingham-Nottingham Solar 138 kV09/21/2022 
22-0648-EL-BNRAnguin Extension No.4 Transmission Line Project07/11/2022 
22-0657-EL-AGGRenewing Electricity Broker License06/29/2022 
22-0659-EL-CSSRACHEL HART VS AES OHIO06/30/202212/19/2022
22-0675-EL-GAGCity of Upper Sandusky07/06/2022 
22-0677-EL-BNRBroadview-Clark 138 kV Transmission Line Structure Replacement Project 07/12/2022 
22-0689-EL-CSSS & R Trading LLC vs. Toledo Edison07/08/202208/15/2023
22-0693-EL-ABNIn the Matter of the Application of Ohio Power for Authority to Abandon Service07/11/2022 
22-0695-EL-BLNBokes Creek Station Project07/28/2022 
22-0696-EL-BLNClean Energy Future–Trumbull, LLC Letter of Notification for the Trumbull Energy Center Electrical Interconnection07/13/2022 
22-0697-EL-BLNClean Energy Future–Trumbull, LLC Letter of Notification for the Trumbull Energy Center Electrical Interconnection07/13/2022 
22-0701-EL-CSSAuthur and Vicki Maser vs Ohio Edison (FirstEnergy)07/13/202208/15/2023
22-0704-EL-UNCOhio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company07/15/2022 
22-0714-EL-UNCIn the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company, and the Toledo Edison Company for Approval of a 07/22/2022 
22-0717-EL-CSSMABLE A SYLVAIN V SMARTENERGY HOLDINGS LLC 07/22/2022 
22-0725-EL-BNRFairfield 43 T-Pole Replacement09/08/2022 
22-0727-EL-BNRFinneytown 44 T-Pole Relocation09/09/2022 
22-0728-EL-CSSCARMEN SCHATZMAN VS DUKE ENERGY OHIO, INC.07/25/202208/15/2023
22-0730-EL-CSSJames Schaeffer vs AEP Ohio07/26/202203/23/2023
22-0735-EL-ACPDIAMOND ENERGY EAST, LLC08/11/2022 
22-0737-EL-RDRIn the Matter of the Application of Ohio Power Company to Update Its Smart City Rider 07/29/2022 
22-0745-EL-RDRIn the Matter of the Application of Ohio Power Company to Adjust the Economic Development Cost Recovery Rider Rate. 08/01/2022 
22-0746-EL-BNRDuke Energy Ohio, Inc.08/08/2022 
22-0747-EL-BLNLeroy Center-Mayfield Q1 and Q2 138 kV Transmission Lines Partial Reconductor Project08/11/2022 
22-0749-EL-GAGCITY OF SHAKER HEIGHTS08/02/2022 
22-0752-EL-BLNLee Extension 138 kV Transmission Line Project08/03/2022 
22-0764-EL-CSSCARL HEINL vs FIRSTENERGY & NOPEC ENERGY08/04/2022 
22-0765-EL-CSSPHILIP STRACK vs SMARTENERGY HOLDINGS LLC08/04/202208/15/2023
22-0774-EL-BLNPhilo-Howard 138 kV Transmission Line Rebuild Project (Millwood-Ohio Central)08/11/2022 
22-0778-EL-CSSDERRYN JONES VS NORTH AMERICAN POWER AND DUKE ENERGY OHIO08/11/202208/15/2023
22-0779-EL-BNREast Lima 345kV Transmission Line Cut-In Project08/17/2022 
22-0781-EL-BLNInnovation Extension 138 kV Project08/29/2022 
22-0783-EL-CSSDoug Shaefferkoetter vs AEP Ohio08/17/202208/15/2023
22-0795-EL-GAGLicking County 08/22/2022 
22-0799-EL-BLNBrie 138 kV Station Project09/01/2022 
22-0801-EL-BNRDuke Energy Ohio, Inc. 09/02/2022 
22-0802-EL-CSSChristine M Amedia & Adrian C Amedia vs Ohio Edison Company08/24/2022 
22-0806-EL-WVRIn the Matter of the Motion of Northeast Ohio Public Energy Council for a Limited Waiver of Rule 4901:1-10-29(H), Ohio Administrative Code08/26/2022 
22-0816-EL-CSSIn the Matter of the Complaint and Request for Emergency Interim Relief by Dynegy Marketing and Trade, LLC, and Hartree Partners, LP, Against the Nort08/30/2022 
22-0817-EL-CSSIn the Matter of the Complaint and Request for Emergency Interim Relief by Dynegy Marketing and Trade, LLC Against the Northeast Ohio Public Energy Co08/31/202202/08/2024
22-0826-EL-BGAApplication of Oregon Clean Energy Future-Oregon, LLC for a Second Amendment to its Certificate09/13/2022 
22-0830-EL-CSSDrake Daum vs. AES Ohio09/02/202203/23/2023
22-0831-EL-BNRDuke Energy Ohio, Inc.09/02/2022 
22-0832-EL-BNRPolaris – Westar 138kV Line Upgrades09/09/2022 
22-0833-EL-BLNFranklin Substation and 138 kV Extension (AES Ohio)09/26/2022 
22-0834-EL-BLNAmsterdam Substation Expansion (AES Ohio)11/22/2022 
22-0835-EL-BLNSidney Substation Expansion (AES Ohio)10/25/2022 
22-0856-EL-BTXNew Liberty - East Leipsic 138 kV Upgrade Project09/19/2022 
22-0857-EL-BTXAlthea-Sweetgum 138 kV Transmission Line Project10/05/2022 
22-0861-EL-ORDIn the Matter of the Commission’s Review of Chapter 4901:1-22 of the Ohio Administrative Code Regarding Interconnection Standards09/13/2022 
22-0862-EL-ORDIn the Matter of the Commission’s Review of Chapter 4901:1-35 of the Ohio Administrative Code.09/13/2022 
22-0863-EL-ORDIn the Matter of the Commission’s Review of Chapter 4901:1-26 of the Ohio Administrative Code.09/13/2022 
22-0864-EL-ORDIn the Matter of the Commission’s Review of Chapter 4901:1-41 of the Ohio Administrative Code09/13/2022 
22-0865-EL-ORDIn the Matter of the Commission’s Review of Chapter 4901:1-36 of the Ohio Administrative Code09/13/2022 
22-0866-EL-ORDIn the Matter of the Commission’s Review of Chapter 4901:1-37 of the Ohio Administrative Code09/13/2022 
22-0867-EL-ORDIn the Matter of the Commission’s Review of Chapter 4901:1-38 of the Ohio Administrative Code09/13/2022 
22-0868-EL-ORDIn the Matter of the Commission’s Review of the Green Pricing Programs Rules Contained in Chapter 4901:1-42 of the Ohio Administrative Code09/13/2022 
22-0869-EL-ORDIn the Matter of the Commission’s Review of its Rules for Energy Efficiency Programs Contained in Chapter 4901:1-39 of the Ohio Administrative Code09/13/2022 
22-0870-EL-ORDIn the Matter of the Commission’s Review of Chapter 4901:1-9 of the Ohio Administrative Code09/13/2022 
22-0871-EL-ORDIn the Matter of the Commission’s Review of its Rules for the Alternative Energy Portfolio Standard Contained in Chapter 4901:1-40 of the Ohio Adminis09/13/2022 
22-0872-EL-ORDIn the Matter of the Commission’s Review of its Rules for Electrical Safety and Service Standards Contained in Chapter 4901:1-10 of the Ohio Administr09/13/2022 
22-0874-EL-AIS2022 AEP Ohio Transmission Company, Inc. LTD Finance Application09/14/2022 
22-0875-EL-AISAEP Ohio Transmission Company, Inc. STD Finance Application09/14/2022 
22-0878-EL-CSSROBERT A. BYSURA VS SMART ENERGY SUPPLY 09/15/202208/15/2023
22-0889-EL-CSSBrad Eubanks vs IGS Energy and Aspen Energy/Dynegy09/19/2022 
22-0892-EL-RDRIn the Matter of the 2022 Review of the Delivery Capital Recovery Rider of Ohio Edison Company, the Cleveland Electric Illuminating Company, and the T09/21/2022 
22-0893-EL-CSSCHRISTEN PRICE VS THE ILLUMINATING COMPANY09/21/2022 
22-0894-EL-CSSDONALD HOUSER VS AES OHIO09/21/202205/08/2023
22-0900-EL-SSOIn the Matter of the Application of The Dayton Power and Light Company d/b/a AES Ohio for Approval of Its Electric Security Plan09/26/2022 
22-0901-EL-ATAIn the Matter of the Application of The Dayton Power and Light Company d/b/a AES Ohio for Approval of Revised Tariffs 09/26/2022 
22-0902-EL-AAMIn the Matter of the Application of The Dayton Power and Light Company d/b/a AES Ohio for Approval of Accounting Authority Pursuant to Ohio Rev. Code 09/26/2022 
22-0904-EL-CSSANNTIONETTE CAMPBELL VS ILLUMINATING COMPANY 09/26/2022 
22-0911-EL-RDRIn the Matter of the Quarterly Reports of Rider DCI Schedules for Duke Energy Ohio, Inc.11/04/2022 
22-0914-EL-AGGIn the matter of the application Smart Columbus Energy LLC Certification Application For Electric Aggregators/Power Brokers09/30/2022 
22-0915-EL-BGAPowell Creek Solar, LLC Amendment Application10/20/2022 
22-0917-EL-CSSJenifer Whitlow vs The Illuminating Company09/30/202208/15/2023
22-0918-EL-BLNVine-City of Columbus West 138 kV Transmission Line Relocation Project Asset Ownership: Ohio Power Company 10/05/2022 
22-0919-EL-BLNIron Triangle Sw. – Loudon 138 kV Transmission Line Project10/24/2022 
22-0921-EL-RDROhio Edison Company10/05/2022 
22-0922-EL-RDRThe Cleveland Electric Illuminating Company10/05/2022 
22-0923-EL-RDRThe Toledo Edison Company10/05/2022 
22-0924-EL-RDRThe Dayton Power and Light Company d/b/a AES Ohio10/17/2022 
22-0926-EL-AISIn the Matter of the Application of Ohio Valley Electric Corporation for authority to issue evidence of short-term indebtedness in the form of one or11/03/2022 
22-0930-EL-CSSMATTHEW BROWN VS SANTANNA ENERGY 10/06/202204/28/2023
22-0932-EL-AECIn the Matter of the Application of Nestlé Purina PetCare Company for Approval of an Economic Development Arrangement with Duke Energy Ohio, Inc.10/07/2022 
22-0933-EL-ATAOhio Edison - Pole Attachment Tariff Update10/21/202204/14/2023
22-0934-EL-ATACleveland Electric Illuminating Company - Pole Attachment Tariff Update10/21/202204/14/2023
22-0935-EL-ATAToledo Edison - Pole Attachment Tariff Update10/21/202204/14/2023
22-0936-EL-AISIn the Matter of the Application of Ohio Edison Company for Authority to Issue, Renew, or Assume Liability on Notes and Other Evidences of Indebtednes10/19/2022 
22-0937-EL-AISIn the Matter of the Application of The Cleveland Electric Illuminating Company for Authority to Issue, Renew, or Assume Liability on Notes and Other 10/19/2022 
22-0938-EL-AISIn the Matter of the Application of The Toledo Edison Company for Authority to Issue, Renew, or Assume Liability on Notes and Other Evidences of Indeb10/19/2022 
22-0939-EL-AISIn the Matter of the Application of American Transmission Systems, Incorporated for Authority to Issue, Renew, or Assume Liability on Notes and Other 10/19/2022 
22-0940-EL-BTXLott 138 kV Transmission Line Project10/28/2022 
22-0942-EL-BLNIn the Matter of Duke Energy Ohio, Inc.11/10/2022 
22-0943-EL-BNRIn the Matter of Duke Energy Ohio, Inc.10/13/2022 
22-0946-EL-BLNAirport-Union 138kV Transmission Line Project (AES Ohio)10/25/2022 
22-0947-EL-BLNCreekside 138kV Transmission Line Project (AES Ohio)11/14/2022 
22-0949-EL-GAGCity of Salem, Columbiana County10/12/2022 
22-0950-EL-BLNCottrell North and South 138 kV Transmission Line Extensions Project11/30/2022 
22-0952-EL-CSSKaren Curry vs AES Ohio10/13/202208/15/2023
22-0954-EL-BNRBeatty – Greene IPP 345kV Cut-in Project10/24/2022 
22-0955-EL-BLNChenoweth Station and Chenoweth – Fox Squirrel 345kV Tie Line10/24/2022 
22-0956-EL-BLNIn the Matter of the Letter of Notification for the Application of AMP Transmission, LLC for a Certificate of Environmental Compatibility and Public N11/17/2022 
22-0958-EL-CSSLENUS RENTALS LLC VS OHIO EDISON 10/17/202202/08/2024
22-0959-EL-AGGCURRENT ENERGY AND RENEWABLES 10/17/2022 
22-0964-EL-BLNCrooksville-North Newark 138kV Transmission Line Adjustment 11/16/2022 
22-0967-EL-BLNLakeview-Ottawa 138 kV Transmission Line Reconductor Project10/19/2022 
22-0977-EL-CSSYoseph F Amdualem vs AEP Ohio10/19/202202/08/2024
22-0981-EL-CSSSteven G. Pastor vs NOPEC10/20/202203/21/2023
22-0986-EL-AISTHE DAYTON POWER AND LIGHT COMPANY D/B/A AES OHIO10/24/2022 
22-0987-EL-CSSJoseph Codispoti & Alexandra Mougianis vs Eligo Energy10/21/2022 
22-0988-EL-BGNChestnut Solar Project in Marion County, Ohio10/27/2022 
22-0992-EL-ESSAEP Ohio (Ohio Power Company)02/15/2022 
22-0993-EL-ESSFirst Energy Corporation (Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company)02/15/2022 
22-0994-EL-ESSDuke Energy Ohio02/15/2022 
22-0995-EL-ESSDayton Power and Light Company02/15/2022 
22-0996-EL-ESSAEP Ohio (Ohio Power Company)02/15/2022 
22-0997-EL-ESSFirst Energy Corporation (Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company)02/15/2022 
22-0999-EL-ESSDuke Energy Ohio, Inc.02/15/2022 
22-1000-EL-ESSDayton Power and Light Company02/15/2022 
22-1001-EL-ESSOhio Valley Electric Corporation02/15/2022 
22-1009-EL-BNRBiers Run – Circleville 138kV Cut-in (Westfall Station) Project11/01/2022 
22-1010-EL-RDRIn the Matter of the Application of Ohio Power Company to Update its Smart City Rider 10/27/2022 
22-1014-EL-CSSLeroy & Tracy Moore vs Ohio Edison & NOPEC10/28/2022 
22-1017-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company11/01/2022 
22-1026-EL-BLNCrooksville – Philo 138kV Transmission Circuit Rebuild Project (Cannelville – Philo)11/04/2022 
22-1027-EL-BNROhio Central-Fostoria 345 kV Transmission Line Adjustment Project 11/04/2022 
22-1028-EL-BNRHoward – Fostoria 138 kV Mid-Span Structure Project11/04/2022 
22-1029-EL-BLNAnguin-Brie 138 kV Transmission Line Project11/21/2022 
22-1030-EL-BLNLetter of Notification for the Nottingham Solar 138 kV Gen-Tie Transmission Line Project11/04/2022 
22-1032-EL-GAGVILLAGE OF ARLINGTON11/07/2022 
22-1034-EL-CSSLori Sennett vs SmartEnergy11/08/202208/15/2023
22-1036-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company11/15/2022 
22-1037-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2022 
22-1038-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2022 
22-1039-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2022 
22-1040-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2022 
22-1041-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2022 
22-1042-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2022 
22-1043-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2022 
22-1044-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2022 
22-1052-EL-RDRIN THE MATTER OF THE REVIEW OF THE SOLAR GENERATION FUND RIDER OF OHIO POWER COMPANY11/10/2022 
22-1057-EL-CSSApril Marshal vs AES Ohio11/14/202202/08/2024
22-1059-EL-RDRAES Ohio Solar Generation Fund Rider 11/17/2022 
22-1060-EL-CSSDORITA BROWN VS NRG.11/16/202202/08/2024
22-1062-EL-CSSTHOMAS V. RAPINI VS THE CLEVELAND ELECTRIC ILLUMINATING COMPANY 11/16/2022 
22-1063-EL-RDRIn the Matter of the Application of Duke Energy Ohio, Inc. to Adjust its Alternative Energy Recovery Rider, Rider AER-R12/01/2022 
22-1064-EL-ACPIn the Matter of the Annual Adjustment of the Alternative Compliance Payment for 2022 Pursuant to Section 4928.64(C)(2)(b), Revised Code11/18/2022 
22-1065-EL-CSSR. SIMBALLA / MARY C. SIMBALLA VS OHIO EDISON / FIRST ENERGY 11/16/2022 
22-1067-EL-BLNKirk-Union Ridge Solar 138 kV Transmission Line Project11/23/2022 
22-1069-EL-RDRDuke Energy Ohio, Inc. Solar Generation Fund Rider11/17/2022 
22-1070-EL-RDRIn the Matter of the Review of the Operational Benefits Assessment of the gridSMART Deployment of Ohio Power Company.11/17/2022 
22-1071-EL-RDRDayton Power and Light d/b/a AES Ohio12/01/2022 
22-1073-EL-CSSLarry Winston Angus Jr. v. AEP Ohio11/17/2022 
22-1079-EL-BLNMadison 345kV Substation Project (AES Ohio)11/22/2022 
22-1082-EL-CSSMICHAEL QUINTARD JACKSON VS AMERICAN ELECTRIC POWER11/22/2022 
22-1083-EL-CSSJANICE MOORE VS AEP OHIO 11/22/2022 
22-1086-EL-BNRSouth Coshocton – Wooster 138 kV Transmission Line Cut-Ins and Salt Creek Switch Project12/08/2022 
22-1087-EL-BLNSalt Creek - Holmesville 138 kV Transmission Line Project 12/01/2022 
22-1088-EL-CSSBlue Acres LLC vs The Cleveland Electric Illuminating Company11/22/2022 
22-1101-EL-CSSMARIO D BLUE VS CLEVELAND PUBLIC POWER11/30/202208/15/2023
22-1102-EL-CSSKEITH E. RAY VS IDT ENERGY 11/30/202202/02/2024
22-1113-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company11/30/2022 
22-1118-EL-RDRDuke Energy Ohio, Inc.12/01/2022 
22-1119-EL-BLNKileville Station and Kileville 138 kV Extension Project 12/01/2022 
22-1125-EL-BNREast Akron-Evans 138 kV Transmission Line Switches Installation Project12/06/2022 
22-1127-EL-ATAIn the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company, and The Toledo Edison Company for Approval of Ta12/08/2022 
22-1129-EL-ATADuke Energy Ohio, Inc. Minimum Stay Tariff Adjustment12/08/2022 
22-1130-EL-WVRDuke Energy Ohio, Inc. Minimum Stay Tariff Agreement12/07/2022 
22-1131-EL-BLNSidney-Franklin Honda 138kV Rebuild/Extension Project (AES Ohio)12/22/2022 
22-1134-EL-BNRFostoria-East Lima 138 kV Hard Tap Project12/08/2022 
22-1138-EL-ATATHE DAYTON POWER AND LIGHT COMPANY D/B/A AES OHIO12/08/2022 
22-1139-EL-WVRTHE DAYTON POWER AND LIGHT COMPANY D/B/A AES OHIO12/08/2022 
22-1140-EL-ATAIn the Matter of the Application of Power Company for Authority to New or Amended Rate Schedules and Tariffs 12/08/2022 
22-1141-EL-AAMIn the Matter of the Application of Ohio Power Company for Approval to Change Accounting Methods 12/08/2022 
22-1147-EL-AGGEnergy Maxx, LLC12/19/2022 
22-1149-EL-GAGWASHINGTON TOWNSHIP (MONTGOMERY COUNTY) 12/09/2022 
22-1153-EL-UNCDuke Energy Ohio, Inc.12/13/2022 
22-1156-EL-CSSRICHARD HUNTER VS DUKE ENERGY OHIO INC12/13/2022 
22-1157-EL-BGNIn the Matter of the Application of Clear Mountain Energy Center, LLC12/12/2022 
22-1158-EL-BNRDuke Energy Ohio, Inc.12/12/2022 
22-1164-EL-CRSBrookfield Renewable Energy Marketing US LLC12/14/2022 
22-1165-EL-BLNMadison to Fayette 345kV Transmission Line Project (AES Ohio)12/13/2022 
22-1166-EL-BLNFayette Substation and 138kV Extension Project (AES Ohio)12/13/2022 
22-1170-EL-BLNGreen Chapel Station Project12/15/2022 
22-1175-EL-BGAClean Energy-Trumbull, LLC Application for a Second Amendment to the Certificate of Environmental Compatibility and Public Need12/30/2022 
22-1176-EL-ATADuke Energy Ohio, Inc.12/19/2022 
22-1178-EL-RDROhio Power Company’s Distribution Investment Rider Work Plan12/19/2022 
22-1180-EL-ACEHarveysburg Village- Warren County 12/20/2022 
22-1181-EL-CRSApproved Energy II LLC12/21/2022 
22-1182-EL-CSSDavid Bell vs Ohio Edison12/20/202202/08/2024
22-1501-EL-FORAEP Ohio Transco02/15/2022 
22-7000-EL-FADARCHIVE COMMISSION DOCUMENTS/EL01/04/2022