Case Number | Case Title | Open Date | Closed Date |
20-1831-EL-BGA | Amended Application of Willowbrook Solar Farm | 01/04/2021 | |
21-0004-EL-BGN | In the Matter of the Application of Tymochtee Solar, LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-Powered | 01/15/2021 | |
21-0005-EL-BGA | Willowbrook Solar Farm | 01/13/2021 | |
21-0009-EL-ACP | Renewable Portfolio Standard Report to the General Assembly for the 2019 Compliance Year | 02/19/2021 | |
21-0011-EL-CSS | Michael S Roote vs The Cleveland Electric Illuminating Company | 01/05/2021 | |
21-0012-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., for Authority to Adjust its Power Future Initiatives Rider | 03/31/2021 | |
21-0015-EL-BLN | Highland-Magellan No.2 138 kV Transmission Line Project | 01/08/2021 | |
21-0016-EL-RDR | IN THE MATTER OF THE REVIEW OF THE DISTRIBUTION INVESTMENT RIDER CONTAINED IN THE TARIFF OF OHIO POWER COMPANY | 02/05/2021 | |
21-0018-EL-BLN | Duke Energy Ohio, Inc. Miami Fort Tanners Creek Project | 01/20/2021 | |
21-0022-EL-CSS | Cynthia Conner vs AEP Ohio | 01/05/2021 | 02/02/2023 |
21-0025-EL-CSS | Boyce Parker vs The Cleveland Electric Illuminating Company | 01/06/2021 | 02/08/2024 |
21-0031-EL-RDR | Duke Energy Ohio, Inc | 01/29/2021 | |
21-0032-EL-ATA | Duke Energy Ohio, Inc | 01/29/2021 | |
21-0033-EL-BLN | LaRue Extension 138 kV Transmission Line Project | 01/26/2021 | |
21-0036-EL-BGN | Marion County Solar Project, LLC | 01/13/2021 | |
21-0039-EL-RDR | Duke Energy Ohio, Inc | 01/26/2021 | |
21-0041-EL-BGN | Palomino Solar, LLC | 01/14/2021 | |
21-0042-EL-REN | Muller PV Site | 01/11/2021 | |
21-0043-EL-AGG | Paragon Advisors | 01/12/2021 | |
21-0049-EL-GAG | City of Bexley | 01/14/2021 | |
21-0051-EL-POR | The Dayton Power and Light Company | 05/14/2021 | |
21-0053-EL-RDR | Ohio Power Company | 01/15/2021 | |
21-0054-EL-CSS | Samantha Shively vs Ohio Edison | 01/15/2021 | 06/30/2023 |
21-0056-EL-REN | Pickford Solar | 01/15/2021 | |
21-0063-EL-REN | Sean McKinney Residence - REN Application | 01/21/2021 | |
21-0064-EL-REN | David Cullison Residence - REN Application | 01/21/2021 | |
21-0067-EL-FOR | In the Matter of the Long-Term Forecast and Resource Plan of Duke Energy Ohio, Inc.
| 01/22/2021 | |
21-0083-EL-GAG | Village of Williamsburg | 03/02/2021 | |
21-0085-EL-REN | Clear Creek Wind - REN Application | 01/25/2021 | |
21-0087-EL-AGG | C.I.S. Energy, LLC | 01/25/2021 | |
21-0092-EL-RDR | The Dayton Power and Light Company Storm Cost Recovery Rider | 05/24/2021 | |
21-0096-EL-REN | Prairie Rose Wind Farm - REN Application | 01/29/2021 | 06/21/2021 |
21-0097-EL-RDR | Ohio Power Company | 01/29/2021 | |
21-0098-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., for Approval to Adjust Rider DDR. | 02/24/2021 | |
21-0100-EL-ATA | Ohio Edison Company, The Cleveland Electric Illuminating Company and the Toledo Edison Company for Approval of Tariff Amendments | 02/01/2021 | |
21-0101-EL-ATA | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company and the Toledo Edison Company for Approval of Tar | 02/01/2021 | |
21-0104-EL-RDR | Ohio Power Company | 02/01/2021 | |
21-0109-EL-AGG | Competitive Retail Electric Service Provider Application | 02/03/2021 | |
21-0110-EL-REN | Wessington Wind Farm - REN Application | 02/03/2021 | 02/06/2023 |
21-0111-EL-BLN | Bellefonte Extension 138kV Line | 05/19/2021 | |
21-0112-EL-AGG | Confidential Credit Report | 02/03/2021 | |
21-0117-EL-BGN | Kingwood Solar I LLC | 02/09/2021 | |
21-0122-EL-REN | Chad Tennant - REN Application | 02/09/2021 | 05/12/2021 |
21-0123-EL-CSS | Nina R. Jones vs The Illuminating Company | 02/09/2021 | |
21-0125-EL-CSS | Manjula R Shah vs IGS Energy, Inc. | 02/10/2021 | 08/15/2023 |
21-0139-EL-EEC | Ohio Power Company | 02/12/2021 | |
21-0146-EL-UNC | Dayton Power and Light | 02/24/2021 | 10/12/2022 |
21-0151-EL-BNR | Dayton Power and Light - Sugarcreek 138kV Reactor Expansion
| 03/08/2021 | |
21-0152-EL-BLN | Dayton Power and Light - Hutchings 138kV Reactor Expansion
| 03/08/2021 | |
21-0162-EL-REN | Marshall Wind Farm - REN Application | 02/19/2021 | 02/06/2023 |
21-0163-EL-REN | Buckeye Wind Energy Center - REN Application | 02/19/2021 | |
21-0164-EL-BGN | In the Matter of the Application of Harvey Solar I LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-Powered E | 06/24/2021 | |
21-0165-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., to Adjust and Set Rider DSR | 03/31/2021 | |
21-0166-EL-ATA | In the Matter of the Application of Duke Energy Ohio, Inc., for Approval of Tariff Amendments. | 03/31/2021 | |
21-0167-EL-BLN | West Moulton-Gemini 138 kV Transmission Line Project | 03/09/2021 | |
21-0172-EL-AIS | Application of Ohio Power Company for Authority to Issue Short Term Debt | 02/22/2021 | |
21-0173-EL-BLN | Windsor Extension (OH) 138 kV Transmission Line Project | 02/22/2021 | |
21-0177-EL-CSS | Joe Brawley vs Ohio Edison Company | 02/23/2021 | 01/06/2022 |
21-0178-EL-CSS | Gary Logan vs Duke Energy | 02/23/2021 | 08/02/2021 |
21-0179-EL-BNR | Anguin Extension No. 4 138 kV Transmission Line | 03/01/2021 | |
21-0181-EL-ACP | Messer Energy Services Inc.s' Annual Alternative Energy Portfolio Status Report - 2020 ACP Compliance | 02/25/2021 | |
21-0182-EL-BGA | Third Amendment Application of Guernsey Power Station LLC | 03/15/2021 | |
21-0184-EL-RDR | The Dayton Power and Light Company | 03/17/2021 | 10/12/2022 |
21-0189-EL-RDR | Ohio Power Company | 02/26/2021 | |
21-0192-EL-CSS | David Lyttle vs NRG aka Reliant Energy Northwest | 03/02/2021 | 01/10/2022 |
21-0193-EL-ACP | JOSCO ENERGY USA LLC | 03/22/2021 | |
21-0194-EL-BNR | BELLARD SUBSTATION PROJECT | 03/04/2021 | |
21-0196-EL-REN | Carspecken, Lucinda & Phil - 9.10 kW | 03/02/2021 | |
21-0199-EL-BTX | Groves Road-Shannon 138 kV Transmission Line Project | 03/03/2021 | |
21-0202-EL-AIS | Ohio Power Company Application for Authority to Issue Long-Term Debt | 03/03/2021 | |
21-0223-EL-ACP | PLANET ENERGY CORP | 03/05/2021 | |
21-0224-EL-RDR | AES Ohio - Annual True-up Filing for its Transmission Cost Recovery Rider - Nonbypassable | 03/16/2021 | 10/12/2022 |
21-0225-EL-CSS | Aaron W Wright IV vs Toledo Edison | 03/08/2021 | 08/26/2022 |
21-0226-EL-ACP | Median Energy Corp | 03/22/2021 | |
21-0229-EL-BLN | Duke Energy Ohio, Inc. Greendale Substation Expansion Project | 03/29/2021 | |
21-0230-EL-ACP | GRAND ENERGY LLC | 03/09/2021 | |
21-0235-EL-CSS | Jizal ElSeikali vs The Cleveland Electric Illuminating Company | 03/11/2021 | 02/03/2023 |
21-0236-EL-CSS | Steven D Painter vs Ohio Edison Company | 03/11/2021 | |
21-0237-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 03/25/2021 | |
21-0238-EL-BLN | Knox-Nottingham 138 kV Transmission Line Rebuild Project | 03/11/2021 | |
21-0239-EL-ACP | SFE Energy Ohio, Inc. | 03/12/2021 | |
21-0240-EL-ACP | StateWise Energy Ohio LLC | 03/12/2021 | |
21-0244-EL-CSS | John Barrett vs The Illuminating Company | 03/15/2021 | 01/10/2022 |
21-0247-EL-CSS | Meropi Steve & George Stevenson vs Ohio Edison-FirstEnergy Company | 03/16/2021 | |
21-0248-EL-ACP | Utility Gas and Power | 03/17/2021 | |
21-0250-EL-BNR | Duke Energy Ohio, Inc. Miami Fort Generation Separation | 04/16/2021 | |
21-0251-EL-BNR | Duke Energy Ohio, Inc. 1782 GLT Project | 04/09/2021 | |
21-0252-EL-AGG | Excelsior Gas and Electric LLC Application for CRES License | 03/18/2021 | |
21-0254-EL-ACP | Shipley Choice LLC | 03/25/2021 | |
21-0258-EL-CSS | MAMOUDOU DIALLO VS AMERICAN ELECTRIC POWER | 03/22/2021 | 01/06/2022 |
21-0259-EL-ACP | Duke Energy Ohio, Inc. Compliance Filing Report | 04/15/2021 | |
21-0262-EL-ACP | Atlantic Energy MD, LLC RPS Report for 2020 | 03/26/2021 | |
21-0264-EL-ACP | MPOWER ENERGY | 03/24/2021 | |
21-0265-EL-BLN | Adjustment to Seaman-Adams 138 kV Line Rebuild Project | 03/25/2021 | |
21-0266-EL-BNR | Harmar Hill 138 kV Switch Install | 04/26/2021 | |
21-0267-EL-BLN | Mill Creek-Riverview 138 kV Transmission Line Rebuild | 04/26/2021 | |
21-0268-EL-BLN | Hillsboro-Millbrook Park 138 kV Circuit Rebuild | 04/30/2021 | |
21-0269-EL-BTA | Amendment #2 to Vigo-Pine Ridge Switch 138 kV Transmission Line | 07/26/2021 | |
21-0270-EL-BGN | In The Matter of the Application of Nottingham Solar LLC for a Certificate of Environmental Compatibility and Public Need For The Construction of a So | 03/25/2021 | |
21-0272-EL-ACP | American PowerNet Management LP 2020 RPS Filing | 03/29/2021 | |
21-0273-EL-ACP | APN Starfirst 2020 RPS Filing | 03/29/2021 | |
21-0277-EL-BGN | In the Matter of the Application of Border Basin I, LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-Powered | 03/29/2021 | |
21-0280-EL-ACP | MCSquared Energy Services 2020 RPS Report | 04/07/2021 | |
21-0288-EL-ACP | Tomorrow Energy Corp RPS Compliance Filing Report | 03/31/2021 | |
21-0289-EL-REN | Bluegrass Ridge Wind - REN Application | 03/31/2021 | 02/04/2022 |
21-0290-EL-REN | Cow Branch Wind - REN Application | 03/31/2021 | 02/04/2022 |
21-0291-EL-REN | Conception Junction Wind - REN Application | 03/31/2021 | 02/04/2022 |
21-0292-EL-REN | Lost Creek Wind - REN Application | 03/31/2021 | 04/19/2021 |
21-0293-EL-BGN | Application of Cepheus Energy Project, LLC | 03/31/2021 | |
21-0294-EL-ACP | AP Gas & Electric (OH), LLC RPS Report for 2020 | 03/31/2021 | |
21-0300-EL-ACP | Star Energy Partners | 04/15/2021 | |
21-0302-EL-ACP | Titan Gas, LLC dba CleanSky Energy 2020 Renewable Portfolio Standard Status Report | 04/06/2021 | |
21-0305-EL-ACP | CenStar Energy Corp - RPS Compliance Filing | 03/31/2021 | |
21-0306-EL-ACP | CenStar Energy Corp - RPS Compliance Filing | 04/12/2021 | |
21-0308-EL-ACP | HIKO Energy, LLC - RPS Compliance Filing | 04/12/2021 | |
21-0312-EL-ACP | Major Energy Electric Services, LLC - RPS Compliance Filing | 04/12/2021 | |
21-0315-EL-ACP | Verde Energy USA Ohio, LLC - RPS Compliance Filing | 04/12/2021 | |
21-0323-EL-ACP | 2020 Annual Alternative Energy Compliance Report for Direct Energy Business, LLC | 04/14/2021 | |
21-0324-EL-ACP | 2020 Annual Alternative Energy Compliance Report for Direct Energy Services, LLC | 04/14/2021 | |
21-0325-EL-ACP | Archer Energy LLC REC Filing | 04/01/2021 | |
21-0329-EL-BLN | In the Matter of the Letter of Notification Application for Switchyard Infrastructure, Yellowbud Solar, LLC | 04/07/2021 | |
21-0330-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from Energy Plus Holdings LLC | 04/13/2021 | |
21-0331-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from Green Mountain Energy Company | 04/13/2021 | |
21-0332-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from Independence Energy Group LLC | 04/13/2021 | |
21-0333-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from Reliant Energy Northeast LLC | 04/13/2021 | |
21-0334-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from Stream Ohio Gas & Electric, LLC | 04/02/2021 | |
21-0335-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from XOOM Energy Ohio, LLC | 04/14/2021 | |
21-0336-EL-ACP | ENGIE Resources RPS Report for CY2020 | 04/08/2021 | |
21-0338-EL-ACP | ENGIE Retail RPS Report for CY2020 | 04/08/2021 | |
21-0340-EL-ACP | Cleveland-Cliffs Steel LLC RPS Reports for 2019 and 2020 | 04/09/2021 | |
21-0341-EL-CSS | Som R Soni vs ELIGO Energy, LLC. | 04/06/2021 | 04/01/2022 |
21-0342-EL-ACP | Engie Power & Gas, LCC RPS Compliance 2020 | 04/15/2021 | |
21-0343-EL-ACP | Choice Energy LLC d/b/a 4 Choice Energy LLC RPS Compliance Report | 04/07/2021 | |
21-0345-EL-ACP | Switch Energy, LLC | 04/08/2021 | |
21-0347-EL-ACP | The Dayton Power and Light Company d/b/a AES Ohio | 04/15/2021 | |
21-0348-EL-BNR | Duke Energy Ohio, Inc. Half Acre Substation | 04/07/2021 | |
21-0349-EL-ACP | Vista Energy Marketing L.P. 2020 RPS Report | 04/07/2021 | |
21-0350-EL-ACP | National Gas & Electric, LLC RPS Report for 2020 | 04/07/2021 | |
21-0352-EL-ACP | Ohio Power Company | 04/12/2021 | |
21-0353-EL-FOR | In the Matter of the Long Term Forecast Report of Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company, and Ame | 04/07/2021 | |
21-0354-EL-ACP | Clearview Energy 2020 RPS Report | 04/07/2021 | |
21-0355-EL-ACP | Eligo Energy OH, LLC | 04/15/2021 | |
21-0357-EL-RDR | The Dayton Power and Light Company d/b/a AES Ohio | 04/16/2021 | 10/12/2022 |
21-0358-EL-ACP | AEP Energy, Inc.'s Renewable Portfolio Standard 2020 | 04/14/2021 | |
21-0360-EL-ACP | First Point Power 2020 RPS Report | 04/08/2021 | |
21-0361-EL-ACP | IDT Energy 2020 RPS Report | 04/08/2021 | |
21-0362-EL-ACP | Residents Energy 2020 RPS Report | 04/08/2021 | |
21-0363-EL-ACP | Town Square Energy East 2020 RPS Report | 04/08/2021 | |
21-0365-EL-ACP | SmartEnergy Holdings LLC 2020 RPS Compliance Report | 04/14/2021 | |
21-0366-EL-ACP | Sunwave USA Holdings Inc./dba Sunwave Gas & Power Ohio Inc RPS 2020 Filing | 04/09/2021 | |
21-0367-EL-PEB | Ohio Edison | 04/22/2021 | 08/17/2021 |
21-0368-EL-ACP | Texas Retail Energy 2020 RPS Compliance Filing | 04/09/2021 | |
21-0369-EL-ACP | Alpha Gas and Electric, LLC CY 2020 OH RPS Filing | 04/14/2021 | |
21-0370-EL-ACP | Discount Power, Inc. CY 2020 OH RPS Filing | 04/14/2021 | |
21-0371-EL-ACP | Provision Power and Gas, LLC CY 2020 RPS Filing | 04/14/2021 | |
21-0372-EL-ACP | Grid Power Direct, LLC CY 2020 OH RPS Filing | 04/15/2021 | |
21-0373-EL-ACP | Palmco Power OH, LLC CY 2020 OH RPS Filing | 04/14/2021 | |
21-0374-EL-ACP | Inspire Energy Holdings, LLC CY 2020 RPS Filing | 04/14/2021 | |
21-0375-EL-ACP | Kiwi Energy NY, LLC CY 2020 OH RPS Filing | 04/14/2021 | |
21-0376-EL-ACP | Arrow Energy RRH, LLC CY 2020 RPS Filing | 04/14/2021 | |
21-0377-EL-ACP | Mega Energy of Ohio, LLC CY 2020 OH RPS Filing | 04/14/2021 | |
21-0378-EL-ACP | Nordic Energy Services, LLC CY 2020 OH RPS Filing | 04/14/2021 | |
21-0379-EL-ACP | Park Power, LLC CY 2020 OH RPS Filing | 04/14/2021 | |
21-0380-EL-ACP | South Bay Energy Corp. CY 2020 OH RPS Filing | 04/14/2021 | |
21-0381-EL-ACP | Rushmore Energy, LLC CY 2020 OH RPS Filing | 04/14/2021 | |
21-0382-EL-ACP | RPA Energy, Inc. CY 2020 OH RPS Filing | 04/14/2021 | |
21-0383-EL-ACE | Competitive Retail Electric Service Provider Application for Protocall Communications, Inc. | 04/09/2021 | |
21-0384-EL-AGG | Protocall Communications, Inc. Competitive Retail Electric Services Provider | 04/09/2021 | |
21-0385-EL-CSS | Douglas A Morgan vs AEP | 04/09/2021 | 02/08/2024 |
21-0387-EL-ACP | Interstate Gas Supply, RPS Filing | 04/09/2021 | |
21-0389-EL-ACP | 2019 RPS Compliance Filing for Cleveland-Cliffs Steel LLC | 04/09/2021 | |
21-0391-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from MidAmerican Energy Services, LLC | 04/14/2021 | |
21-0392-EL-ACP | CleanChoice Energy, Inc. Annual RPS Compliance | 04/15/2021 | |
21-0393-EL-ACP | Current Power & Gas Corp - Energy and Renewables Annual RPS Compliance | 04/15/2021 | |
21-0394-EL-ACP | Lykins Energy Solutions Annual RPS Compliance | 04/15/2021 | |
21-0395-EL-ACP | Renaissance Power and Gas Annual RPS Compliance | 04/15/2021 | |
21-0397-EL-ACP | American Power & Gas of Ohio LLC | 04/12/2021 | |
21-0399-EL-CSS | Dianna Ballein vs Duke Energy Ohio, Inc. | 04/12/2021 | 02/03/2023 |
21-0400-EL-ACP | Tenaska Power Management 2020 OH RPS | 04/13/2021 | |
21-0401-EL-ACP | Great American Power, LLC CY 2020 RPS Annual Report | 04/15/2021 | |
21-0403-EL-ACP | 2020 TPM OH Renewable Energy Portfolio Standards | 04/13/2021 | |
21-0405-EL-ACP | Holcim US Inc 2020 Compliance Report | 04/13/2021 | |
21-0406-EL-ACP | 2020 Holcim (US) Inc. RPS Report | 04/13/2021 | |
21-0408-EL-UNC | Duke Energy Ohio Inc. SEET (Significantly Excessive Earnings Test) | 04/14/2021 | |
21-0412-EL-UNC | Duke Energy Ohio Inc. SEET (Significantly Excessive Earnings Test) | 05/13/2021 | |
21-0413-EL-ACP | In the Matter of Alternative Energy Portfolio Status Report for Compliance Year 2020 Just Energy Solutions Inc | 04/14/2021 | |
21-0415-EL-ACP | In the Matter of Alternative Energy Portfolio Status Report for Compliance Year 2020 for Hudson Energy Services LLC | 04/14/2021 | |
21-0417-EL-ACP | Astral Energy LLC RPS Report for 2020 | 04/14/2021 | |
21-0422-EL-RPT | Aggressive Energy 2020 RPS Report | 04/14/2021 | |
21-0423-EL-ACP | AGGRESSIVE ENERGY LLC | 04/14/2021 | |
21-0424-EL-ACP | Realgy, LLC RPS filing | 04/14/2021 | |
21-0425-EL-ACP | Ohio Power Company | 04/14/2021 | |
21-0426-EL-ACP | 2020 OH RPS Compliance Report Filing for nTherm, LLC | 04/14/2021 | |
21-0427-EL-ACP | In the Matter of the RPS Compliance Filing Report 2020 Compliance Year for Energy Harbor LLC | 04/14/2021 | |
21-0429-EL-ACP | SmartestEnergy US, LLC CY 2020 OH RPS Filing | 04/15/2021 | |
21-0430-EL-ACP | Land O'Lakes RPS Report for 2020 | 04/14/2021 | |
21-0431-EL-ACP | Ohio Power Company | 04/15/2021 | |
21-0432-EL-ACP | North American Power and Gas, LLC - 2020 RPS Compliance Filing Report | 04/15/2021 | |
21-0433-EL-ACP | Champion Energy Services, LLC - 2020 RPS Compliance Filing | 04/15/2021 | |
21-0434-EL-ACP | Calpine Solutions - 2020 RPS Compliance Filing | 04/15/2021 | |
21-0435-EL-ACP | In the Matter of Alternative Energy Portfolio Status Report for Compliance Year 2020 for Frontier Energy Northeast, LLC | 04/15/2021 | |
21-0436-EL-ACP | In the Matter of Alternative Energy Portfolio Status Report for Compliance Year 2020 for NextEra Energy Services Ohio, LLC | 04/15/2021 | |
21-0437-EL-ACP | In the Matter of Alternative Energy Portfolio Status Report for Compliance Year 2020 for Constellation NewEnergy, Inc. | 04/15/2021 | |
21-0438-EL-ACP | Western Reserve Energy Services, LLC CY 2020 OH RPS Filing | 04/15/2021 | |
21-0439-EL-FOR | In the Matter of the 2021 Long-Term Forecast Report of AMP Transmission, LLC and Related Matters | 04/15/2021 | |
21-0440-EL-ACP | In the Matter of the Annual Renewable Energy Status Report of Ohio Edison Company, The Cleveland Electric
Illuminating Company, and The Toledo Edison | 04/15/2021 | |
21-0441-EL-ACP | In the Matter of Alternative Energy Portfolio Status Report for Compliance Year 2020 for Liberty Power Delaware, LLC | 04/15/2021 | |
21-0442-EL-ACP | In the Matter of Alternative Energy Portfolio Status Report for Compliance Year 2020 for Liberty Power Holdings, LLC | 04/15/2021 | |
21-0443-EL-ACP | Talen Energy Marketing, LLC's RPS Compliance Report | 04/15/2021 | |
21-0444-EL-ACP | 2020 RPS Compliance Filing for SunSea Energy OH, LLC. | 04/15/2021 | |
21-0445-EL-ACP | 2020 RPS Filing for SunSea Energy OH, LLC | 04/15/2021 | |
21-0446-EL-ACP | In the Matter of Alternative Energy Portfolio Status Report for Compliance Year 2020 for MP2 Energy NE LLC | 04/15/2021 | |
21-0447-EL-UNC | IN THE MATTER OF ESTABLISHING THE SOLAR GENERATION FUND RIDER PURSUANT TO R.C. 3706.46 | 04/15/2021 | |
21-0448-EL-ACP | 2020 RPS Report for All American Power and Gas OH, LLC | 04/15/2021 | |
21-0449-EL-ACP | 2020 RPS Report for All American Power and Gas OH, LLC | 04/15/2021 | |
21-0450-EL-ACP | RPS Compliance Report - 2020
Summer Energy Midwest LLC | 04/15/2021 | |
21-0451-EL-ACP | 2020 RPS Compliance Filing Report for Pure Energy USA OH, LLC. | 04/15/2021 | |
21-0452-EL-RPT | Freepoint Energy Solutions LLC - Annual RPS Compliance & Plan Status Summary | 04/15/2021 | |
21-0453-EL-ACP | Starion Energy PA, Inc. | 04/15/2021 | |
21-0455-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from Ambit Northeast, LLC | 04/15/2021 | |
21-0456-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from Cincinnati Bell Energy, LLC | 04/15/2021 | |
21-0457-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from Dynegy Energy Services (East), LLC | 04/15/2021 | |
21-0458-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from Energy Services Providers, Inc. | 04/15/2021 | |
21-0459-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from Everyday Energy, LLC d/b/a Energy Rewards | 04/15/2021 | |
21-0460-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from Public Power, LLC | 04/15/2021 | |
21-0461-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from Viridian Energy PA, LLC | 04/15/2021 | |
21-0462-EL-ACP | Powervine Energy, LLC - Renewable Portfolio Standard (RPS) Compliance Filing Report 2020 Compliance Year | 04/15/2021 | |
21-0463-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from TriEagle Energy, LP | 04/15/2021 | |
21-0464-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Compliance Year 2020 from EDF Energy Services, LLC | 04/15/2021 | |
21-0465-EL-ACP | PUCO RPS Report 2020 | 04/15/2021 | |
21-0466-EL-RPT | Freepoint Energy Solutions LLC - Annual RPS Compliance & Plan Status Summary | 04/15/2021 | |
21-0467-EL-ACP | Freepoint Energy Solutions LLC - Annual RPS Compliance & Plan Status Summary | 04/15/2021 | |
21-0468-EL-AIS | In the Matter of the Application of American Transmission Systems, Incorporated for Authority to Issue, Sell, or Enter into Debt Transactions | 04/27/2021 | |
21-0469-EL-ACP | New Wave Energy 2020 RPS Compliance Filing | 04/16/2021 | |
21-0470-EL-RDR | Ohio Power Company | 04/16/2021 | |
21-0471-EL-ACP | PBF Power Marketing LLC RPS Report for 2020 | 04/16/2021 | |
21-0472-EL-CSS | Roshawne Hall vs American Electric Power Company | 04/16/2021 | 10/25/2021 |
21-0473-EL-CSS | Raymond A Collins vs The Toledo Edison Company | 04/16/2021 | 02/02/2023 |
21-0474-EL-ACP | Volunteer Energy Services, Inc. | 04/19/2021 | |
21-0475-EL-ACP | Washington Gas Energy Service Inc., Annual RPS Compliance Report for 2020 | 04/19/2021 | |
21-0477-EL-RDR | In the Matter of the OVEC Generation Purchase Rider Audits Required by ORC Section 4928.148 for DP&L, Duke Ohio and AEP Ohio | 05/05/2021 | |
21-0478-EL-ORD | In the Matter of the Commission Review of Ohio Adm.Code Chapter 4901:1-25. | 04/22/2021 | |
21-0479-EL-ACP | Santanna Energy Services RPS Report for 2020 | 04/21/2021 | |
21-0481-EL-EEC | Duke Energy Ohio, Inc. Annual Efficiency Status Report | 05/14/2021 | |
21-0482-EL-RDR | Duke Energy Ohio, Inc. 2020 True-Up Rider | 05/14/2021 | |
21-0483-EL-CSS | George A Dreiling vs Duke Energy Ohio, Inc. | 04/21/2021 | 01/10/2022 |
21-0484-EL-ATA | Ohio Edison, The Cleveland Electric Illuminating Company and The Toledo Edison Company | 04/22/2021 | |
21-0489-EL-BNR | Davidson-Dublin 138 kV Underground Relocation Project | 05/27/2021 | |
21-0496-EL-BLN | Dayton Power and Light Sugarcreek-Normandy Circuit Addition | 07/15/2021 | |
21-0497-EL-RDR | Ohio Power Company | 04/27/2021 | |
21-0498-EL-RDR | Ohio Power Company | 04/27/2021 | |
21-0499-EL-RDR | Ohio Power Company | 04/27/2021 | |
21-0500-EL-FOR | In the Matter of the 2021 Long-Term Forecast Report of Ohio Valley Electric Corporation and Related Matters. | 01/25/2021 | |
21-0501-EL-FOR | In the Matter of the 2021 Long-Term Forecast Report of Ohio Power Company and Related Matters. | 01/25/2021 | |
21-0502-EL-EDI | ADOPTION OF ELECTRONIC DATA INTERCHANGE STANDARDS AND UNIFORM BUSINESS PRACTICES FOR THE ELECTRIC INDUSTRY | 07/01/2021 | |
21-0503-EL-FOR | In the Matter of the 2021 Long-Term Forecast Report of Duke Energy of Ohio Corporation and Related Matters. | 01/25/2021 | |
21-0504-EL-FOR | In the Matter of the 2021 Long-Term Forecast Report of Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company and | 01/25/2021 | |
21-0505-EL-FOR | In the Matter of the 2021 Long-Term Forecast Report of Dayton Power and Light Company and Related Matters. | 01/25/2021 | |
21-0508-EL-BGA | In the Matter of the Application of Madison Fields Solar Project, LLC, for an Amendment to its Certificate Issued in Case No. 19-1881-EL-BGN to Extend | 05/07/2021 | |
21-0516-EL-REN | Moraine Wind LLC - REN Application | 04/30/2021 | |
21-0517-EL-REN | Rugby Wind LLC - REN Application | 04/30/2021 | |
21-0524-EL-BLN | Tidd-Sunnyside 138 kV Transmission Line Rebuild Project | 04/30/2021 | |
21-0525-EL-BLN | North Newark-Sharp Road 138 kV Transmission Line Rebuild
| 05/04/2021 | |
21-0531-EL-REN | Elm Creek II | 05/03/2021 | |
21-0532-EL-REN | Buffalo Ridge II | 05/03/2021 | |
21-0535-EL-EEC | The Cleveland Electric Illuminating Company - Application for the Energy Efficiency and Peak Demand Reduction Program Portfolio Status Report | 05/14/2021 | |
21-0536-EL-EEC | Ohio Edison Company - Application for the Energy Efficiency and Peak Demand Reduction Program Portfolio Status Report
| 05/14/2021 | |
21-0537-EL-EEC | The Toledo Edison Company - Application for the Energy Efficiency and Peak Demand Reduction Program Portfolio Status Report | 05/14/2021 | |
21-0538-EL-EEC | The Cleveland Electric Illuminating Company - In the matter of the application for approval of Transmission & Distribution Projects | 05/14/2021 | |
21-0539-EL-EEC | Ohio Edison Company - In the matter of the application for approval of Transmission & Distribution Projects | 05/14/2021 | |
21-0540-EL-EEC | The Toledo Edison Company - In the matter of the application for approval of Transmission & Distribution Projects | 05/14/2021 | |
21-0541-EL-UNC | Ohio Power Company | 05/14/2021 | |
21-0542-EL-CSS | Betty J Murray vs The Cleveland Electric Illuminating Company. | 05/03/2021 | 02/06/2023 |
21-0544-EL-REN | Barton Windpower 1 - REN Certification Application | 05/04/2021 | |
21-0547-EL-REN | Certification as an Ohio Renewable Energy Resource Generating Facility for Troy Solar | 05/06/2021 | |
21-0549-EL-CSS | Dan and Mary Patek vs The Cleveland Electric Illuminating Company | 05/06/2021 | |
21-0554-EL-BLN | Tidd-Sunnyside 138 kV Transmission Line Rebuild Project | 05/07/2021 | 02/03/2023 |
21-0557-EL-RDR | Matter the Generation Energy and Generation Capacity riders for Ohio Power Company | 05/07/2021 | |
21-0558-EL-RDR | In the Matter of the Generation Energy and Generation Capacity riders for Ohio Power Company | 05/10/2021 | |
21-0560-EL-RDR | The Dayton Power and Light Company dba AES Ohio | 05/14/2021 | |
21-0562-EL-CRS | EcoPlus Power, LLC. | 05/10/2021 | |
21-0567-EL-RDR | In the Matter of the Tariff Filings for Rider LGR by Duke Energy Ohio, Inc. | 05/24/2021 | |
21-0568-EL-UEX | Duke Energy Ohio, Inc. Rider UE-ED | 06/29/2021 | |
21-0569-EL-UEX | Duke Energy Ohio, Inc. Rider UE-GEN | 06/29/2021 | |
21-0573-EL-RDR | In the Matter of the Review of Duke Energy Ohio Inc.'s Distribution Capital Investment Rider | 05/11/2021 | |
21-0576-EL-REN | Quilt Block Wind Farm | 05/12/2021 | |
21-0577-EL-CRS | BP Energy Retail LLC | 05/12/2021 | |
21-0586-EL-UNC | In the Matter of the Determination of the Existence of Significantly Excessive Earnings for 2020 under the Electric Security Plan of Ohio Edison Compa | 05/17/2021 | |
21-0588-EL-UNC | THE DAYTON POWER AND LIGHT COMPANY d/b/a AES OHIO | 05/17/2021 | |
21-0589-EL-BNR | Viking 138kV Switch Project | 06/10/2021 | 02/03/2023 |
21-0590-EL-BLN | Sterling – Foundry Park 138kV Transmission Line Raise Project | 05/19/2021 | |
21-0591-EL-BNR | WAVERLY-LICK 138-kV TRANSMISSION LINE RELOCATION AND LICK STATION EXPANSION | 05/19/2021 | |
21-0592-EL-ACP | In the Matter of the Annual Adjustment of the Alternative Compliance Payment for 2021 Pursuant to Section 4928.64(C)(2)(b), Revised Code | 05/24/2021 | |
21-0593-EL-RDR | Dayton Power and Light dba AES Ohio Legacy Generation Resource Rider | 05/28/2021 | 10/12/2022 |
21-0597-EL-REN | Troy Solar Far, | 05/19/2021 | |
21-0598-EL-REN | Troy Solar Farm | 05/19/2021 | |
21-0605-EL-REN | Brandon Kinnard-20.5 kW PV | 05/24/2021 | |
21-0606-EL-BNR | Solida 138 kV Switch Project | 06/22/2021 | |
21-0612-EL-BNR | Buckeye Co-Op Extension-Fayette 138 kV | 05/24/2021 | |
21-0613-EL-BNR | Buckeye Co-Op Extension-Fayette 138 kV Line Rebuild Project | 06/22/2021 | |
21-0615-EL-PEB | In the Matter of Duke Energy Ohio, Inc. | 06/04/2021 | 10/14/2021 |
21-0621-EL-GAG | VILLAGE OF BRIDGEPORT | 05/25/2021 | |
21-0626-EL-AGG | Community Purchasing Alliance Cooperative | 05/25/2021 | |
21-0629-EL-CRS | DIAMOND ENERGY EAST LLC | 06/10/2021 | |
21-0630-EL-CSS | William N Miller and Keith A Burrows vs AES Ohio | 05/26/2021 | 11/19/2021 |
21-0632-EL-CSS | C & D Wax Works, LLC.d/b/a Emporium vs Ohio Edison Company | 05/26/2021 | 10/21/2022 |
21-0642-EL-AIS | In the Matter of the Application of OHIO VALLEY ELECTRIC CORPORATION for Authority to Issue Evidence of Indebtedness, in Form of Long-Term Security | 05/28/2021 | |
21-0659-EL-USF | Application of the Ohio Development Services Agency for an Order Approving Adjustments to the Universal Service Fund Riders of Jurisdictional Ohio Ele | 06/01/2021 | |
21-0667-EL-BLN | Knox-Washington 138 kV Transmission Line Rebuild Project | 09/21/2021 | |
21-0669-EL-BGN | Application of South Branch Solar, LLC | 06/08/2021 | |
21-0678-EL-BNR | Salerno 138 kV Line Extension Project | 06/09/2021 | |
21-0679-EL-BLN | Clinton 345kV Expansion Project | 08/26/2021 | |
21-0691-EL-ACP | Powervine Energy LLC Annual RPS Filing | 06/11/2021 | |
21-0695-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 06/21/2021 | |
21-0713-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc. to Adjust and Set the Rate for Rider BTR. | 07/14/2021 | |
21-0715-EL-AEC | In the Matter of the Application for Establishment of a Unique Arrangement Between the Northeast Ohio Regional Sewer District and The Cleveland Electr | 06/21/2021 | |
21-0727-EL-ABN | Avangrid Renewables, LLC. | 06/17/2021 | |
21-0731-EL-BNR | Duke Energy Ohio, Inc. / 5781 Emergent. | 07/16/2021 | |
21-0734-EL-CSS | YOLANDA G. STEWART VS OHIO EDISON - FIRST ENERGY CORP. | 06/21/2021 | 02/03/2023 |
21-0735-EL-CSS | MICHAEL P. HARVEY , CO., L.P.A VS THE ILLUMINATING COMPANY | 06/21/2021 | 01/10/2022 |
21-0742-EL-REN | Winnebago Wind Farm | 06/21/2021 | |
21-0746-EL-ATR | Ohio Power Company | 06/22/2021 | |
21-0747-EL-CSS | James W. Tietge vs Dayton Power and Light Company | 06/23/2021 | 02/03/2023 |
21-0763-EL-POR | Duke Energy Ohio, Inc. EE Low Income Program | 07/14/2021 | |
21-0764-EL-BGN | In the Matter of the Application of Kensington PV I, LLC for a Certificate of Environmental Compatibility and Public Need | 06/29/2021 | |
21-0767-EL-PEB | The Toledo Edison Company | 07/07/2021 | 12/15/2021 |
21-0768-EL-BGN | Dixon Run Solar, LLC, Application for a Certificate of Environmental Compatibility and Public Need for a Solar Facility | 06/30/2021 | |
21-0770-EL-BLN | Howard-Fostoria 138kV Transmission Line Adjustment Project | 07/14/2021 | |
21-0786-EL-BLN | Cyprus 138 kV Station Project | 07/12/2021 | |
21-0787-EL-CSS | PATRICIA RAYMOND VS OHIO EDISON COMPANY | 07/08/2021 | 02/08/2024 |
21-0789-EL-BLN | In the Matter of the Letter of Notification of Long Ridge Energy Generation LLC to Amend a Certificate | 07/09/2021 | |
21-0793-EL-BGA | In the Matter of the First Amendment of Harrison Power LLC to its Certificate of Environmental Capability and Public Need for an Electric Generating F | 07/16/2021 | |
21-0795-EL-BNR | In the Matter of Duke Energy Ohio, Inc. 5781 GLT Project | 07/30/2021 | |
21-0796-EL-UNC | IN THE MATTER OF THE OHIO POWER SITING BOARD’S REPORT TO THE GENERAL ASSEMBLY REGARDING THE POWER TRANSMISSION SYSTEM. | 07/14/2021 | |
21-0800-EL-CSS | Yolanda G. Stewart vs Ohio Edison-First Energy Corp. | 07/15/2021 | 02/03/2023 |
21-0805-EL-BTA | Amendment #2 to the Glencoe-Speidel 138 kV Transmission Line Project | 08/19/2021 | |
21-0808-EL-CSS | LAWRENCE KEVIN MCMONIGLE VS DUKE ENERGY OHIO INC | 07/19/2021 | |
21-0815-EL-ACP | Lykins Energy Solutions Annual RPS Compliance | 10/19/2021 | |
21-0816-EL-CSS | Monique Maisenhalter vs Duke Energy Ohio, Inc | 07/23/2021 | 02/08/2024 |
21-0817-EL-CSS | Don Scott Williams vs Dayton Power and Light Company | 07/23/2021 | 02/03/2023 |
21-0818-EL-CSS | Heather Tyson vs FirstEnergy Corp. | 07/23/2021 | 02/08/2024 |
21-0819-EL-BNR | Adjustment to Viking 138kV Switch Project | 07/26/2021 | |
21-0821-EL-CSS | Drewfab vs. Duke Energy Ohio, Inc. | 07/26/2021 | 10/12/2022 |
21-0823-EL-BGN | Wild Grains Solar, LLC Application for a Certificate of Environmental Compatibility and Public Need for a Solar Facility | 07/27/2021 | |
21-0824-EL-CSS | BAYYINAH A BROOKS VS THE ILLUMINATING COMPANY | 07/27/2021 | 10/21/2022 |
21-0828-EL-RDR | Ohio Power Company | 07/28/2021 | |
21-0831-EL-RDR | Ohio Power Company | 07/29/2021 | |
21-0833-EL-CSS | Karen Pierce vs SmartEnergy Holdings, LLC | 07/29/2021 | 04/01/2022 |
21-0849-EL-CSS | Mary Collins vs Duke Energy | 08/09/2021 | 06/08/2022 |
21-0850-EL-BLN | Bixby-Shannon 138 kV Transmission Line Rebuild Project | 09/14/2021 | |
21-0851-EL-BLN | Shannon 138 kV Station Expansion Project | 08/09/2021 | |
21-0852-EL-BLN | Crooksville-North Newark 138 kV Transmission Line Adjustment Project | 08/31/2021 | |
21-0854-EL-CSS | PHILIP MINK VS. DUKE ENERGY OHIO INC | 08/10/2021 | |
21-0857-EL-CSS | RICHARD D BIHLAJAMA VS FIRST ENERGY CORP | 08/11/2021 | |
21-0860-EL-BLN | Sifford Station Project | 08/18/2021 | |
21-0864-EL-CSS | Thomas P. Gallagher vs The Cleveland Electric Illuminating Co. | 08/13/2021 | 02/08/2024 |
21-0868-EL-BGN | Scioto Farms Solar Project, LLC | 08/27/2021 | |
21-0869-EL-CSS | GEORGE CLOS VS THE ILLUMINATING CO | 08/18/2021 | 02/02/2023 |
21-0871-EL-AGG | Simplicity Energy Solutions | 08/18/2021 | 02/28/2024 |
21-0875-EL-PEB | South Central Power Company & Ohio Power Company - Petition for Reallocation of Electric Service Territory | 08/19/2021 | 12/22/2021 |
21-0876-EL-PEB | Ohio Power Company & South Central Power Company - Petition for Reallocation of Electric Service Territory | 08/19/2021 | 12/22/2021 |
21-0878-EL-BLN | Corridor Station; 138kV Line Entrance Span Modifications Project | 09/24/2021 | |
21-0885-EL-ACP | Renewable Portfolio Standard Report to the General Assembly for the 2020 Compliance Year | 11/02/2021 | |
21-0887-EL-AIR | Duke Energy Ohio, Inc. | 09/01/2021 | |
21-0888-EL-ATA | Duke Energy Ohio, Inc. | 09/01/2021 | |
21-0889-EL-AAM | Duke Energy Ohio, Inc. | 09/01/2021 | |
21-0890-EL-CSS | Selin Waltz vs Duke Energy Ohio, Inc. | 08/26/2021 | 08/15/2023 |
21-0892-EL-BLN | West Moulton 138 kV Station Expansion Project | 08/26/2021 | |
21-0893-EL-BNR | Southwest Lima-West Moulton and St Mary’s-West Moulton 138 kV Transmission Line Adjustment Project | 10/01/2021 | |
21-0897-EL-BTA | Dayton Power and Light - West Milton-Eldean 138 kV Transmission Line Project Amendment | 10/07/2021 | |
21-0898-EL-AGG | Indigo Energy Partners LLC | 09/15/2021 | |
21-0899-EL-BNR | Fostoria Central Station Expansion | 09/01/2021 | |
21-0900-EL-BLN | Tidd-Sunnyside 138 kV Line Rebuild | 09/01/2021 | |
21-0911-EL-REN | Haverhill Coke Company LLC - REN Application | 09/01/2021 | |
21-0912-EL-REN | Middletown Coke Company LLC | 09/01/2021 | |
21-0913-EL-CSS | Edward Galewood vs Ohio Edison Company | 09/01/2021 | 08/15/2023 |
21-0918-EL-ATA | Duke Energy Ohio, Inc. Solar Generation Fund Rider | 09/10/2021 | |
21-0919-EL-CSS | Rodney S Clark Sr vs Reliant EnergyNortheast LLC dba NRG Home | 09/03/2021 | |
21-0920-EL-ATA | Duke Energy Ohio, Inc. | 09/03/2021 | |
21-0921-EL-ATA | The Dayton Power and Light Company d/b/a AES Ohio | 09/17/2021 | |
21-0924-EL-REN | Whitted-Dennis-IN-PV-13.34kw Residence | 09/08/2021 | |
21-0925-EL-CSS | Container Graphics Corporation, CGC vs. Talen Energy Marketing, LLC and The Toledo Edison Company | 09/08/2021 | |
21-0926-EL-CSS | In the Matter of the Complaint of Frederick and Danielle Sallee vs. The Dayton Power and Light Company d/b/a AES Ohio | 09/09/2021 | 08/15/2023 |
21-0927-EL-BNR | Duke Energy Ohio, Inc. Stuart Substation Expansion Project. | 09/17/2021 | |
21-0928-EL-CSS | DEBRECZENI & PETRASH CPA'S INC. VS THE ILLUMINATING COMPANY | 09/10/2021 | 08/15/2023 |
21-0930-EL-AIS | In the Matter of the Application of Ohio Edison Company for Authority to Issue, Renew, or Assume Liability on Notes and Other Evidences of Indebtednes | 09/17/2021 | |
21-0931-EL-AIS | In the Matter of the Application of The Cleveland Electric Illuminating Company for Authority to Issue, Renew, or Assume Liability on Notes and Other | 09/17/2021 | |
21-0932-EL-AIS | In the Matter of the Application of The Toledo Edison Company for Authority to Issue, Renew, or Assume Liability on Notes and Other Evidences of Indeb | 09/17/2021 | |
21-0933-EL-AIS | In the Matter of the Application of American Transmission Systems Incorporated for Authority to Issue, Renew, or Assume Liability on Notes and Other E | 09/17/2021 | |
21-0934-EL-CSS | EDDIE THOMAS VS AES | 09/10/2021 | 02/08/2024 |
21-0937-EL-RDR | Ohio Power Company | 09/13/2021 | |
21-0938-EL-ATA | Ohio Edison, The Cleveland Electric Illuminating Company and the Toledo Edison Company | 09/17/2021 | |
21-0941-EL-AGG | TEST CASE FOR TANOWA 09 13 21 | 09/13/2021 | |
21-0942-EL-ATA | Ohio Power Company | 09/14/2021 | |
21-0950-EL-CSS | JUDY DEFRENCH VS THE ILLUMINATING COMPANY | 09/15/2021 | 02/08/2024 |
21-0955-EL-UNC | In the Matter of Duke Energy Ohio, Inc. | 09/17/2021 | |
21-0956-EL-ESS | APPLICATION OF THE DAYTON POWER AND LIGHT COMPANY D/B/A AES OHIO FOR ESTABLISHING NEW RELIABILITY STANDARDS | 10/21/2021 | |
21-0958-EL-CSS | Daniel Odoemene vs The Cleveland Electric Illuminating Company | 09/17/2021 | 02/02/2023 |
21-0959-EL-CSS | Milton L. Bickham vs The Toledo Edison Company | 09/17/2021 | 02/03/2023 |
21-0960-EL-BGN | In the Matter of the Application of Chipmunk Solar LLC for a Certificate of Environmental Compatibility and Public Need | 11/19/2021 | |
21-0966-EL-CSS | The Furnace Man Heating & Cooling LLC vs AES | 09/20/2021 | 08/15/2023 |
21-0972-EL-BLN | Dayton Power and Light West Milton-Airport 138kV | 10/28/2021 | |
21-0973-EL-BLN | Dayton Power and Light Airport-Miami 138kV
| 10/28/2021 | |
21-0974-EL-BNR | West Lancaster-Bixby 138 kV Extension | 09/21/2021 | |
21-0975-EL-BNR | Sifford-Ruble 138 kV Tie Lines Project | 09/21/2021 | |
21-0976-EL-BNR | Philo-Howard 138 kV Mid-Span Structure Project | 09/21/2021 | |
21-0977-EL-RPT | VOIDED | 09/21/2021 | |
21-0978-EL-UNC | Ohio Power Company | 09/21/2021 | |
21-0979-EL-BNR | Fostoria – East Lima 138 kV Transmission Line Tie-Ins to North Woodcock Station Project | 09/21/2021 | |
21-0980-EL-AIS | AEP Ohio Transmission Company, Inc. Application for Long-Term Debt | 09/21/2021 | |
21-0981-EL-AIS | AEP Ohio Transmission Company, Inc. Application for Short-Term Debt | 09/21/2021 | |
21-0985-EL-BNR | Duke Energy Ohio, Inc. | 11/05/2021 | |
21-0987-EL-REN | Harvest Ridge Wind Farm LLC | 09/22/2021 | |
21-0990-EL-CSS | Ohio Power Company vs. Nationwide Energy Partners, LLC | 09/24/2021 | |
21-0991-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc. to Adjust its Alternative Energy Recovery Rider, Rider AER-R | 11/19/2021 | |
21-0992-EL-ESS | IN THE MATTER OF THE ANNUAL REPORTOF OHIO POWER COMPANY PURSUANT TO RULE 10 OF THE ELECTRIC SERVICE AND SAFETY STANDARDS, OHIO ADMINISTRATIVE CODE 490 | 01/22/2021 | |
21-0993-EL-ESS | IN THE MATTER OF THE ANNUAL REPORT OF FIRSTENERGY COMPANIES PURSUANT TO RULE 10 OF THE ELECTRIC SERVICE AND SAFETY STANDARDS, OHIO ADMINISTRATIVE CODE | 01/22/2021 | |
21-0994-EL-ESS | IN THE MATTER OF THE ANNUAL REPORT OF DUKE ENERGY OHIO PURSUANT TO RULE 10 OF THE ELECTRIC SERVICE AND SAFETY STANDARDS, OAC 4901:1-10-10 | 01/22/2021 | |
21-0995-EL-ESS | IN THE MATTER OF THE ANNUAL REPORT OF DAYTON POWER AND LIGHT PURSUANT TO RULE 10 OF THE ELECTRIC SERVICE AND SAFETY STANDARDS, OHIO ADMINISTRATIVE COD | 01/22/2021 | |
21-0996-EL-ESS | IN THE MATTER OF THE ANNUAL REPORT OF OHIO POWER PURSUANT TO RULE 26 OF THE ELECTRIC SERVICE AND SAFETY STANDARDS, OHIO ADMINISTRATIVE CODE 4001:1 -10 | 01/22/2021 | |
21-0997-EL-ESS | IN THE MATTER OF THE ANNUAL REPORT OF FIRSTENERGY COMPANIES PURSUANT TO RULE 26 OF THE ELECTRIC SERVICE AND SAFETY STANDARDS OHIO ADMINISTRATIVE CODE | 01/22/2021 | |
21-0999-EL-ESS | IN THE MATTER OF THE ANNUAL REPORT OF DUKE ENERGY OHIO, INC. PURSUANT TO RULE 26 OF THE ELECTRIC SERVICE AND SAFETY STANDARDS, OHIO ADMINISTRATIVE COD | 01/22/2021 | |
21-1000-EL-ESS | IN THE MATTER OF THE ANNUAL REPORT OF DAYTON POWER AND LIGHT COMPANY PURSUIANT TO RULE 26 OF THE ELECTRIC SERVICE AND SAFETY STANDARDS, OHIO ADMINISTR | 01/22/2021 | |
21-1001-EL-ESS | IN THE MATTER OF THE ANNUAL REPORT OF OHIO VALLEY ELECTRIC CORPORATION PURSUANT TO RULE 26 OF ELECTRIC SERVICE AND SAFETY STANDARDS, OHIO ADMINISTRATI | 01/22/2021 | |
21-1003-EL-BLN | In the Matter of the Letter of Notification Application of Cadence Solar Energy LLC to Construct the Cadence Solar Energy Transmission Line. | 09/23/2021 | |
21-1006-EL-CSS | Elizabeth F. White vs Constellation NewEnergy LLC | 09/27/2021 | |
21-1009-EL-BLN | Dayton Power and Light-Amsterdam Complex | 09/28/2021 | |
21-1012-EL-BLN | Delta-Wauseon 138 kV Transmission Line Tap to Winameg Area Substation | 11/04/2021 | |
21-1013-EL-AIS | In the Matter of the Application of Ohio Edison Company for Authority to Issue, Sell, or Enter into Debt Transactions | 10/07/2021 | |
21-1017-EL-CSS | VILSON MIHAJ VS CLEVELAND ELECTRIC ILLUMINATING COMPANY | 09/30/2021 | 10/21/2022 |
21-1022-EL-RDR | Ohio Edison Company | 10/07/2021 | |
21-1023-EL-RDR | The Cleveland Electric Illuminating Company | 10/07/2021 | |
21-1024-EL-RDR | The Toledo Edison Company | 10/07/2021 | |
21-1030-EL-CSS | CARRIE WALL VS ILLUMINATING COMPANY | 10/04/2021 | 02/08/2024 |
21-1031-EL-BGA | In the Matter of the Application of Fox Squirrel Solar, LLC for a Boundary Amendment to its Certificate in Case No. 20-931-EL-BGN. | 10/08/2021 | |
21-1032-EL-BNR | Duke Energy Ohio, Inc. | 10/05/2021 | |
21-1033-EL-BNR | Duke Energy Ohio, Inc. | 10/26/2021 | |
21-1034-EL-RDR | The Dayton Power and Light Co. dba AES Ohio | 10/18/2021 | |
21-1038-EL-RDR | FIRSTENERGY ANNUAL DCR RIDER AUDIT | 10/05/2021 | |
21-1043-EL-BNR | Willowbrook Solar I, LLC 138kV Overhead Transmission Gen-Tie Line | 10/08/2021 | |
21-1046-EL-AGG | iCONIQ Energy Advisers, LLC | 10/07/2021 | |
21-1047-EL-AEC | CAMPBELL SOUP COMPANY LLC | 10/08/2021 | |
21-1051-EL-REN | Sturgeon Falls Hydro - REN Application | 10/12/2021 | |
21-1055-EL-BGA | In the Matter of the Application of Firelands Wind, LLC to Amend/Modify its Certificate Issued in Case No. 18-1607-EL-BGN. | 10/28/2021 | |
21-1056-EL-BLN | Cyprus 138 kV Extension Project | 10/27/2021 | |
21-1057-EL-BNR | Hartman Farms 138 kV Extension No. 5 and No. 6 Project | 10/27/2021 | |
21-1061-EL-BGN | Application of Flint Grid, LLC for a Certificate of Environmental Compatibility and Public Need | 10/18/2021 | |
21-1066-EL-CRS | Plus Energy Services Application: AP-0385173 | 10/15/2021 | |
21-1069-EL-AGG | Plus Energy Services LLC | 10/26/2021 | |
21-1071-EL-RDR | In the Matter of the Quarterly Reports of Rider DCI Schedules | 11/03/2021 | |
21-1072-EL-REN | Pine Gate Renewables - Woodley Solar, LLC | 10/19/2021 | |
21-1077-EL-AGG | Deregulated Energy Inc. | 10/22/2021 | |
21-1083-EL-BLN | Innovation 138 kV Station Project | 11/29/2021 | |
21-1084-EL-BLN | Arboles 138 kV Station Project | 12/13/2021 | |
21-1085-EL-BNR | Heppner-Lick 138 kV Transmission Line Adjustment Project | 11/22/2021 | |
21-1086-EL-BNR | Linworth 138 kV Extension Relocation Project | 11/05/2021 | |
21-1090-EL-BGN | Circleville Solar, LLC | 11/01/2021 | |
21-1093-EL-GAG | In the Matter of the City of Grove City | 10/26/2021 | |
21-1097-EL-ATA | OE Pole Attachment | 10/27/2021 | |
21-1098-EL-ATA | CE Pole Attachment | 10/27/2021 | |
21-1099-EL-ATA | TE Pole Attachment | 10/27/2021 | |
21-1100-EL-WVR | In the Matter of Duke Energy Ohio, Inc | 11/01/2021 | |
21-1106-EL-AGG | FIRST CLIENT CONSUMER SERVICES | 10/28/2021 | |
21-1110-EL-RDR | In the Matter of the Application of The Dayton Power and Light Company d/b/a AES Ohio to Implement its Infrastructure Investment Rider | 11/02/2021 | |
21-1111-EL-BNR | Biers Run – Circleville 138kV Line Cut-In Project | 12/14/2021 | |
21-1112-EL-BLN | Crooksville-Philo South 138 kV Transmission Line Rebuild Project | 11/22/2021 | |
21-1113-EL-BNR | Cannelsville-Guernsey-Muskingum Co-Op 138 kV Transmission Line Rebuild Project | 11/22/2021 | |
21-1114-EL-BLN | Amlin-Dublin 138 kV Transmission Line Adjustment Project | 11/18/2021 | |
21-1119-EL-RDR | Smart City Rider | 10/29/2021 | |
21-1121-EL-BTA | requesting the reports filed 4/5/21 be reopened and to file a motion to amend for the report submitted 6/29/20 | 10/29/2021 | |
21-1125-EL-WVR | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company for a Limited Waive | 11/01/2021 | |
21-1127-EL-ATA | Ohio Edison, The Cleveland Electric Illuminating Company and The Toledo Edison Company | 11/01/2021 | |
21-1128-EL-AIS | The Dayton Power and Light Company d/b/a AES Ohio | 11/02/2021 | |
21-1129-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 12/01/2021 | |
21-1130-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 12/01/2021 | |
21-1131-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 11/30/2021 | |
21-1132-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 12/01/2021 | |
21-1133-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 12/01/2021 | |
21-1134-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 12/01/2021 | |
21-1135-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 11/30/2021 | |
21-1136-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 12/01/2021 | |
21-1142-EL-CSS | In the Matter of Mark Freyhof vs FirstEnergy, Corp. | 11/03/2021 | 02/08/2024 |
21-1146-EL-BLN | Dayton Power and Light - Madison 345kV Project | 11/04/2021 | |
21-1148-EL-AEC | TOSHI CMC, LLC | 11/04/2021 | |
21-1149-EL-BTX | Application for Amendment to the Marion Road-Mound Street 138-kV Transmission Line Project | 11/08/2021 | |
21-1150-EL-UNC | Report by the Staff of the Public Utilities Commission-AEP Ohio Supplier Consolidated Billing Pilot | 11/05/2021 | |
21-1151-EL-AIS | In the Matter of the Application of Ohio Valley Electric Corporation for authority to issue short-term indebtedness in the form of one or more or rev | 11/08/2021 | |
21-1154-EL-RDR | The Dayton Power and Light Company dba AES Ohio | 11/09/2021 | |
21-1164-EL-RDR | Duke Energy Ohio, Inc. | 11/15/2021 | |
21-1166-EL-UNC | In the Matter of the Quadrennial Review Required by R.C. 4928.143(E) for the Electric Security Plans of Ohio Power Company. | 11/10/2021 | |
21-1168-EL-BNR | Cartwright 138 kV Switch Project | 11/29/2021 | |
21-1169-EL-BNR | Cannelville – Guernsey-Muskingum Co-Op 138 kV Transmission Line Rebuild Project
| 11/11/2021 | |
21-1170-EL-BNR | Buckeye Co-Op Extension-Addison 138 kV Transmission Line Rebuild Project | 12/10/2021 | |
21-1171-EL-RDR | OHIO POWER COMPANY Solar Generation Fund Rider | 11/12/2021 | |
21-1174-EL-BLN | In the Matter of the Letter of Notification Application for Big Plain Solar, LLC | 11/12/2021 | |
21-1177-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 11/15/2021 | |
21-1178-EL-BNR | Greenfield-Lakeview 138 kV Transmission Line Reconductor and Rebuild Project | 12/03/2021 | |
21-1183-EL-RDR | AES Ohio Solar Generation Fund Rider | 11/16/2021 | |
21-1184-EL-BTA | Application for Amendment to the Marion Road-Mound Street 138-kV Transmission Line Project | 11/17/2021 | |
21-1195-EL-CSS | Thelma Johnson vs Ohio Edison Company | 11/22/2021 | 02/08/2024 |
21-1196-EL-BGA | In the Matter of the First Amendment Application of Big Plain Solar, LLC to its Certificate of Environmental Capability and Public Need in Madison Cou | 11/24/2021 | |
21-1200-EL-RDR | Duke Energy Ohio, Inc. | 11/30/2021 | |
21-1204-EL-RDR | The Dayton Power and Light Company dba AES Ohio | 12/01/2021 | |
21-1205-EL-AEC | In the Matter of the Application for Establishment of a Unique Arrangement for Toshi CMC, LLC | 11/29/2021 | |
21-1206-EL-BLN | Crooksville-North Newark 138-kV Transmission Line Rebuild Project (Newark Center-Crooksville) | 12/02/2021 | |
21-1207-EL-BLN | Windsor Extension 138 kV Transmission Line Adjustment Project | 12/01/2021 | |
21-1209-EL-WVR | In the Matter of the Application of Ohio Power Company for a Waiver of Rules 4901:1-10-24(E)(3), and 4901:1-10-33(A)Ohio Administrative Code
| 12/01/2021 | |
21-1215-EL-ATA | In the Matter of the Application of Duke Energy Ohio, Inc., for Approval to Amend its Rider PF Tariff | 12/03/2021 | |
21-1218-EL-AGG | Symbio Energy Partners, LLC | 12/06/2021 | |
21-1219-EL-BLN | Hillsboro-Marysville 138 kV Transmission Line Adjustment Project | 12/17/2021 | |
21-1220-EL-UNC | In the Matter of AES Ohio | 12/09/2021 | |
21-1222-EL-REN | Northwest Local Schools-Elementary | 12/07/2021 | |
21-1223-EL-REN | Northwest Local Schools-Middle | 12/07/2021 | |
21-1224-EL-REN | Northwest Local Schools-High School | 12/07/2021 | |
21-1225-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 12/16/2021 | |
21-1227-EL-BNR | Allen Junction-Westgate 138 kV Transmission Line Relocation Project | 12/08/2021 | |
21-1229-EL-AGG | New World Energy Group LLC | 12/14/2021 | |
21-1231-EL-BGN | Fountain Point Solar Energy LLC | 12/28/2021 | |
21-1234-EL-WVR | In the Matter of the Application of The Dayton Power and Light Company d/b/a AES Ohio for a Limited Waiver of Rule 4901:1-18-06(A)(2), Ohio Administra | 12/16/2021 | |
21-1237-EL-BLN | Madison 345kV | 12/14/2021 | |
21-1238-EL-AGG | Insight Sourcing Group, LLC | 12/14/2021 | |
21-1240-EL-RDR | Ohio Power Company’s Distribution Investment Rider Work Plan | 12/14/2021 | |
21-1242-EL-CRS | ENEL TRADING NORTH AMERICA LLC | 12/15/2021 | |
21-1245-EL-CSS | HENRY VAUGHAN VS THE DAYTON POWER AND LIGHT COMPANY | 12/15/2021 | |
21-1263-EL-CSS | Shelly and Howard Moore vs The Cleveland Electric Illuminating Company | 12/21/2021 | |
21-1268-EL-RDR | In the Matter of the Application of Ohio Power Company to Update Its Enhanced Service Reliability Rider | 12/27/2021 | |
21-1501-EL-FOR | In the Matter of the 2021 Long-Term Forecast Report of AEP Ohio Transmission Company, Inc. and Related Matters. | 01/25/2021 | |
21-7000-EL-FAD | ARCHIVE COMMISSION DOCUMENTS/EL | 02/26/2021 | |