Case Record For:

97-0505-RR-STP

File a Public Comment
Case Title: CONRAIL/CSX TRANSPORTATION
Status: AR-Archived
Industry Code: RR-RAILROAD
Purpose Code: STP-State funded warning projects
Date Opened: 5/7/1997
Date Closed: 6/22/1999
Printable Docket Card Service List
View per page
Date FiledSummaryPages
06/22/1999Entry closing this case of record. (2 pgs.)2
06/11/1999Memo closing this case of record. (1 pg.)1
04/30/1998Entry ordering that Conrail's request for an extension of time is granted; that Conrail notify the Commission at the time this project is completed so that the systems can be inspected by Commission staff. (2 pgs.)2
04/24/1998Revised time extension request for circuitry modernization projects, filed on behalf of Conrail by D. Sands, P.E. (2 pgs.)2
04/24/1998Entry, ordered Conrail's request for an extension of time is granted as set forth in Finding (4). That Conrail notify the Commission's Railroad Section at the time these projects are completed so that the systems can be inspected by Commission staff. (2 pgs.)1
04/16/1998Letter requesting additional time to complete the moderni- zation projects filed on behalf of Conrail by D. Sands. (2 pgs.)2
04/16/1998Memorandum granting the request by Conrail for extensions of time to complete the projects, filed on behalf of the PUCO staff by R. Marvin. (1 pg.)1
09/18/1997Entry ordering that the Reading Road crossing circuitry upgrade project previously identified in this project, be approved; that Conrail complete this project no later than April 30, 1998.3
07/31/1997Entry ordering that the crossings identified in Finding 4 be made part of a circuitry upgrade program to be funded by the state grade crossing protection fund; that Conrail and CSX upgrade the circuitry at each of these crossings to grade crossing predictor only and take any other action at these crossings as directed herein; that Conrail and CSX complete these projects by April 30, 1998; that Conrail and CSX notify the Commission at the time these projects are completed so that the systems can be inspected by Commission staff. (6 pgs.)6
05/15/1997Entry ordering that the crossings identified in Finding 3 be made part of a circuitry upgrade program to be funded by the state grade crossing protection fund; that Commission staff inspect the preliminary engineering plans and cost estimates and by July 1, 1997, file a written report with the findings and recommendations; that staff take all required actions to encumber $2,692,766 for the circuitry upgrade program.3
05/07/1997In the matter of the circuitry upgrade program for the modernization of active warning devices at various Con- solidated Rail Corporation and CSX Transportation, Inc. public highway railroad grade crossings. (1 pg.)1