CASE NUMBER: 91-2143-RR-FED
CASE DESCRIPTION: FEDERAL CROSSING PROTECTION 1991
DOCUMENT SIGNED ON: 4/19/2024
DATE OF SERVICE: ________________________________________
02/19/1997 Returned mail.
11/14/1996 Entry closing the case of record. (1 pg.)
03/04/1996 Memo from J. Reinhardt, PUCO staff, stating that all projects have been completed and installed as required by the Commission, and recommending that this case be closed. (1 pg.)
03/30/1995 Memo stating that the staff of the Railroad Division has no objection to the request for extension submitted by the Wheeling & Lake Erie Railroad for the installation of auto- matic warning devices at Mogadore Road and Cleveland Avenue in Mogadore, Ohio, filed by M. Ross, PUCO staff. (1 pg.)
03/29/1995 Entry ordering that the time for completion of the Cleve- land Mogadore Road grade crossing in the city of Mogadore be extended until May 7, 1995; that the time for completion of the 38th Street grade crossing in the city of Canton be extended until October 14, 1995. (2 pgs.)
03/16/1995 Letter requesting a 30-day extension filed on behalf of the Wheeling & Lake Erie Railway by J. Bell. (1 pg.)
02/16/1995 Entry ordering that I&O and R.J. Corman acquire materials for and proceed with the installation of the crossing projects set forth in this entry, to be completed by 2/16/96. (4 pgs.)
02/01/1995 Memo from ODOT authorizing R J Corman Railroad to proceed with the construction of the TUS-Front Avenue grade crossing project, filed by M. Ross, PUCO staff. (3 pgs.)
02/01/1995 Memo from ODOT authorizing R J Corman Railroad Co. to proceed with the construction of the TUS-W. Fifteenth Street grade crossing project, filed by M. Ross, PUCO staff. (3 pgs.)
02/01/1995 Memo from ODOT authorizing Indiana & Ohio Rail System to proceed with the JAC-93-27.40 grade crossing project, filed by M. Ross, PUCO staff. (3 pgs.)
10/20/1994 Entry ordering that CSX acquire materials for and proceed with the installations of the Hamilton County, Village of Lockland, Cooper Avenue crossing projects to be com- pleted by 10/5/95. (4 pgs.)
10/11/1994 Memo from ODOT to authorize the CSX Transportation, Inc. to proceed with the construction of grade crossing warning project, Hamilton County, Village of Lockland, Cooper Avenue CSX, AAR No. 152 366 H filed by M. Ross (PUCO Staff).(4 pgs)
07/22/1994 Entry ordering that Conrail shall complete installation at the Lorain County, North Eaton Island Road, County Road 58; Richland County, Crestline Settlement Road, County Road 170; Richland County, Shiloh Base Line Road, County Road 11; and Richland County, Shelby-Ganges Road, County Road 61 crossing projects by 9/6/94; that Conrail comply with the provisions of Finding 3 in connection with any future extension requests.
07/11/1994 Letter stating no objections to the request by Conrail for an extension of time filed by M. Ross.
06/29/1994 Letter requesting an extension of the July 8 deadline to September 15 for the project construction of the Richland County, Settlement Road grade crossing project, filed on behalf of Conrail by J. Cossel.
06/29/1994 Letter requesting an extension of the July 8 deadline to August 19 for the project construction of the Richland County, Shelby-Ganges Road project, filed on behalf of Conrail by J. Cossel.
06/29/1994 Letter requesting an extension of the July 8 deadline to October 15 for the project construction of the Lorain County, Island Road grade crossing project, filed on behalf of Conrail by J. Cossel.
06/29/1994 Letter requesting an extension of the July 8 deadline to November 15 for the project construction of the Richland County, Base Line Road grade crossing, filed on behalf of Conrail by J. Cossel.
04/20/1994 Entry ordering that CSX Transportation acquire materials for and proceed with installation of the Portage County, State Route 225 crossing project; that CSX strictly comply with directives and procedures set forth herein as well as with all applicable federal procedures inconnection with this installation project; that the installation be com- pleted by 4/20/94.
04/08/1994 Memo from ODOT authorizing CSX Transporation to proceed with construction of the POR-225-15.78, CSX, AAR No. 141 754 B grade crossing project, filed by M. Ross, PUCO staff.
04/07/1994 Entry ordering that WLE acquire materials for and proceed with the installations of the Summit and Portage Counties, Village of Mogadore, Cleveland Avenue crossing projects; that the installations be completed by 4/7/94.
03/22/1994 Memo from ODOT authorizing the Wheeling and Lake Erie Railway Co. to proceed with the construction of the Summit 7 Portage Counties, Village of Mogadore, Cleveland Ave. & Mogadore Rd. grade crossings, filed by J. Reinhardt, PUCO staff.
03/10/1994 Entry ordering that the installation project programmed for the East Market Street grade crossing in Findlay (513 704 C) be deleted from case No. 91-2143-RR-FED and added to the Findlay Rail Corridor project authorized in case No. 93-292-RR-FED.
01/19/1994 Letter requesting that the completion date for the East Walnut Street grade crossing be extended to coincide with the completion date of the Findlay Corridor Project when it is issued, filed on behalf of Conrail by J. Cossel.
01/07/1994 Memo from J. Reinhardt, PUCO staff, stating that Sandusky County, Spring Street, DOT 473 693 E, Norfolk Southern grade crossing waring project has been installed and com- pleted as ordered by the Commission within the required time frame.
12/16/1993 Entry ordering that the Baum Road and WLE grade crossing in Canton Township, Stark County, be deleted from this case.
12/16/1993 Entry ordering that CSX Transportation, Inc. acquire materials for and proceed with the installation of the Butler County, Village of New Miami, Augspurger Road crossing project, to be completed by by 12/16/94.
12/03/1993 Memo from ODOT authorizing CSX Transportation to proceed with the construction of the BUT-Augspurger Road, Village of New Miami, crossing project, filed by J. Reinhardt, PUCO staff.
11/17/1993 Memo from J. Reinhardt, PUCO staff, with attached letter dated October 6, 1993, from S. Kelly, CSX Transportation, concerning the proposed installation of flashing light signals and roadway gates at Stark County, Baum Road.
09/30/1993 Entry ordering that CSX Transporation and the Bessemer and Lake Erie Railroad acquire materials for and proceed with the Stark County, Canton Township Road 228 crossing and the Ashtabula County, City of Conneaut, Main Street cros- sing; that the installations be completed by 9/30/94.
09/23/1993 Entry ordering that Norfolk & Western acquire materials for and proceed with the installation of the Lake County, City of Mentor, Hart Street crossing project, to be com- pleted by 9/23/94.
09/15/1993 CSX"S approved abbreviated plan, F&OC report and the Federal authorization of construction for the application grade crossing waring project STA-Twp. Rd. No. 288 filed by J. Reinhardt.
09/15/1993 Bessemer and Lake Erie's approved abbreviated plan, F&OC report and Federral authorization of construction for the Bessemer and Lake Erie, 051-925-B project filed by J. Reinhardt.
09/10/1993 Memo from ODOT authorizing the Norfolk Southern Corporation to proceed with the LAK-Hart Street project, filed by J. Reinhardt, PUCO staff.
08/27/1993 Memo stating that the Putnam County, Village of Leipsic, Oak Street grade crossing warning project has been in- stalled and completed, filed by J. Reinhardt, PUCO staff.
07/12/1993 Entry ordering that Conrail, N&W Railway, and Wheeling & Lake Erie Railway acquire materials for and proceed with the installation of the crossing projects in this entry; that installation be completed no later than 7/8/94. (ISSUED 7/8/93)
06/24/1993 Memo stating that the Miami County, County Road 155, Crane Road, CSX Transportation grade crossing warning project has been installed and completed as ordered by Commission within the required time frame, filed by J. Reinhardt, PUCO staff.
06/24/1993 Entry ordering that Conrail acquire material for and pro- ceed with the installation of the Hamilton County, Village of Lockland, Dunn Street project, to be completed no later than 6/24/94.
06/23/1993 Memo from ODOT authorizing the Consolidated Rail Corpora- tion to proceed with the construction of the RIC-Co. Rd. No. 61, Shelby Ganges Rd. crossing, filed by M. Ross, PUCO staff.
06/23/1993 Memo from ODOT authorizing the Wheeling and Lake Erie Rail- way to proceed with the construction of the STA-Twp. Rd. No. 208, Spangler Rd., filed by M. Ross, PUCO staff.
06/23/1993 Memo from ODOT authorizing Norfolk Southern Corp. to proceed with the construction of the LAW-N. Kenova Road crossing, filed by M. Ross, PUCO staff.
06/23/1993 Memo from ODOT authorizing the Wheeling and Lake Erie Rail- way to proceed with construction of the SUM-N. Portage Path crossing, filed by M. Ross, PUCO staff.
06/23/1993 Memo from ODOT authorizing the Consolidated Rail Corpora- tion to proceed with the construction of the LOR-Co. Rd. No. 58, Island Road crossing, filed by M. Ross, PUCO staff.
06/23/1993 Memo from ODOT authorizing Norfolk Southern Corp. to proceed with the construction of the HUR-Center Street crossing, filed by M. Ross, PUCO staff.
06/23/1993 Memo from ODOT authorizing Norfolk Southern Corp. to proceed with the construction of the LAK-Co. Rd. No. 304, Jackson Road crossing, filed by M. Ross, PUCO staff.
06/23/1993 Memo from ODOT authorizing the Consolidated Rail Corpora- tion to proceed with the construction of the MAH-Co. Rd. No. 173, Johnson Rd. crossing, filed by M. Ross, PUCO staff.
06/23/1993 Memo from ODOT authorizing the Consolidated Rail Corpora- tion to proceed with the construction of the MAH-Lowellville Road crossing, filed by M. Ross, PUCO staff.
06/07/1993 Memo from ODOT authorizing the Consolidated Rail Corp. to proceed with the construction of the Hamilton County, Village of Lockland, grade crossing, filed by M. Ross, PUCO staff.
04/22/1993 Entry ordering that Conrail acquire materials for and proceed with the installation of the crossing project set forth in Finding 6, and that installation be com- pleted by 4/21/94; that the crossing projects identified in Finding 9, CSX/U.S. Route 35 in Gallia County and CSX/County Road 7 in Stark County be cancelled and deleted from this case.
04/08/1993 Entry ordering that CSX and N&W Railway acquire materials for and proceed with the installation of the crossing projects set forth in this entry; that CSX and N&W Railway strictly comply with all directives and procedures set forth herein as well as with all applicable federal pro- cedures in connection with these installation projects; that installation be completed by 3/25/94; that CSX and N&W Railway notify the appropriate ODOT district at the time the installations are completed and the signals and lights are activated, at which time ODOT may inspect the devices.
04/02/1993 Copies of the following letters from Mr. S. M. Kelly, CSX Projects Engineer, and Mr. C. G. Eicher, CSX Projects Engineer, submitted by J. Reinhardt, PUCO staff.
03/24/1993 Memo stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued construction authorization for the Grade Crossing Warning Project, Lucas County, City of Toledo, Oakwood Avenue, DOT 508 926 B, Conrail (CRC), filed by J. Reinhardt, PUCO staff.
03/09/1993 Memo stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued construction authorization for the Grade Crossing Warning Project, Henry County, SR65-3.11, DOT 142 306 W, CSX, filed by J. Reinhardt, PUCO staff.
03/05/1993 Memo stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued construction authorization for the Grade Crossing Warning Project, Wood County, Village of North Baltimore, Tarr Street, DOT 143 270 R, RRPG-000S (310), CSX, filed by J. Reinhardt, PUCO staff.
03/05/1993 Memo stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued construction authorization for the Grade Crossing Warning Project, Lucas County, City of Toledo, Burnham Street, DOT 851 534 R, RRPG-000S(312), filed by J. Reinhardt, PUCO staff.
03/05/1993 Memo stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued construction authorization for the Grade Crossing Warning Project, Putnam County, City of Ottawa, Third Street, DOT 155 723 T, CSX, filed by J. Reinhardt, PUCO staff.
03/05/1993 Memo stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued construction authorization for the Grade Crossing Warning Project, Wood County, Troy and Freedom Townships, Township Road 19, Sugar Ridge Road, DOT 228 832 B, filed by J. Reinhardt, PUCO staff.
03/05/1993 Memo stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued authorization for the Grade Crossing Warning Project, Sandusky County, City of Clyde, Spring Street, DOT 473 693 E, RRPG-000S(305), Norfolk Southern (NS), filed by J. Reinhardt. PUCO staff.
03/04/1993 Memo stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued construction authorization for the Grade Crossing Warning Project, Marion County, County Road 94, Fountain Road, DOT 228 724 E, RRPG-000S (307), CSX, filed by J. Reinhardt, PUCO staff.
02/17/1993 Entry ordering that CSX and Conrail acquire material for and proceed with the installation of the crossing project, to be completed by 2/17/94.
02/10/1993 Entry ordering that Conrail acquire material for and proceed with the installation of the Fulton County, Township Road 43, West Barre Road crossing, to be completed by 2/11/94.
02/04/1993 Memo stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued construction authorization for the Grade Crossing Warning Project, Logan County, LOG-68-6. 97, DOT 518 352 R, RRPG-18(56), Conrail (CR), filed by J. Reinhardt, PUCO staff.
02/04/1993 Memo stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued construction authorization for the Grade Crossing Warning Project, Wood County, Village of Bairdstown, WOO-18-16.69, Main Street, DOT 142 259 R, RRPG-396(19), CSX Transportation, filed by J. Reinhardt, PUCO staff.
02/03/1993 Memo stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued construction authorization for the Grade Crossing Warning Project, Hancock County, City of Findlay, E. Walnut Street, DOT 513 704 c, RRPG-000S (317), Conrail, filed by J. Reinhardt, PUCO staff.
01/26/1993 Memo of PUCO staff stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued construction authoriza- tion for the Grade Crossing Warning Project, Fulton County, Township Road 43, W. Barre Road, DOT 509 506 A, RRPG-000S(316), Conrail, filed by J. Reinhardt, PUCO staff.
08/20/1992 Entry giving GTW authority to proceed with the installation of crossing project set forth in this Entry to be completed by 8/20/93.
07/28/1992 Copy of letter dated June 10, 1992 authorizing construction for the Putnam County, Village of Leipsic grade crossing filed on behalf of the staff of the PUCO by J. Reinhardt.
06/25/1992 Entry ordering CSX to proceed with the installation of the crossing project to be completed by 6/25/93.
06/03/1992 Memorandum stating that the Commission's Railroad Section has received notification from ODOT that Federal Highway Administration has issued construction authorization for the Grade Crossing Warning Project, Miami County, County Road 155, Crane Road, DOT 155 176 P, RRPG-7A02(1), CSX, filed on behalf of the PUCO staff by R. Patterson.
03/20/1992 Memo stating that all railroads have submitted the required preliminary engineering plans and construction costs with- in the 90 days of the date of the entry, filed on behalf of the PUCO staff by J. Reinhardt.
12/19/1991 Entry authorizing projects for the installation of additional protective devices for the public grade crossings identified in this Entry.
11/26/1991 In the matter of the implementation of the 1991 Federal Crossing Protection Program.