DIS - Case Record for 89-6008-EL-TRF Skip to main content

Case Record For:

89-6008-EL-TRF

File a Public Comment
Case Title: TOLEDO EDISON COMPANY
Status: OPEN-OPEN
Industry Code: EL-ELECTRIC
Purpose Code: TRF-Commission approved final tariffs
Date Opened: 11/7/1989
Date Closed:
Printable Docket Card Service List
View per page
Date FiledSummaryPages
11/01/2024In the Matter of the Tariff Update to Rider CRC electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.15
11/01/2024In the Matter of the Tariff Update to Rider DCR electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.24
11/01/2024In the Matter of theTariff Update to Rider AMI electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
11/01/2024Revised Tariff Page PUCO No. 8 Update to Rider PIR electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.9
10/18/2024Revised Tariff Pages, PUCO No. 8, Update to Electric Service Regulations electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
09/23/2024Revised Tariff Pages, PUCO No. 8, Update to Rider NMB electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
09/19/2024Revised Tariff Pages Update to Rider DCR electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.32
09/19/2024Revised Tariff Pages PUCO No. 8 Update to Rider AMI electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
09/19/2024Revised Tariff Pages PUCO No. 8 Update to Rider DRR electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr..9
08/30/2024Revised Tariff Pages, PUCO No. 8, Update to Riders DUN, GCR, PUR, NDU and EDR electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.12
08/30/2024Revised Tariff Pages, PUCO No. 8, Update to Rider AER electronically filed by Emily Brunson on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
08/30/2024Revised Tariff Pages, PUCO No. 8, Update to Rider DRR electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.9
08/02/2024Revised Tariff Pages, PUCO 8, Update to Rider AMI electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
08/01/2024Revised Tariff Pages, PUCO No. 8 Update to Rider DCR electronically filed by Emily Brunson on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.32
08/01/2024Revised Tariff Pages, PUCO No. 8 Update to Rider CFA electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.7
06/04/2024Revised Tariff PUCO No. 8, Update to Riders DUN, GCR, PUR, and NDU electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr. 9
06/04/2024Revised Tariff PUCO No. 8, Update to Riders DRR and RER electronically filed by Emily Brunson on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.17
06/03/2024Revised Tariff PUCO No. 8, Update to Rider LGR electronically filed by Emily Brunson on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.7
06/03/2024Revised Tariff Pages, PUCO No. 8, Update to Rider AER electronically filed by Emily Brunson on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
05/31/2024Revised Tariff Pages, PUCO No. 8, Compliance Filing electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.128
05/31/2024Revised Tariff Pages, PUCO No. 8, Update to Rider GEN electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.7
05/02/2024Revised Tariff Pages, PUCO No. 8, Update to Riders CPP, RTP, and HLF electronically filed by Natalie Alcorn on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.14
05/01/2024Revised Tariff Pages, PUCO No. 8, Update to Rider PIR electronically filed by Emily Brunson on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
04/19/2024Notice of withdrawal of counsel electronically filed by Ms. Jill R. Olbrysh Sustar on behalf of Knipe, Brian Mr. and Ohio Edison Company and The Cleveland Electric Illuminating Company and The Toledo Edison Company.3
04/01/2024Revised Tariff Pages Update to Rider DCR electronically filed by Emily Brunson on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
03/21/2024Revised Tariff Pages, PUCO No. 8, Update to Rider NMB electronically filed by Emily Brunson on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
03/01/2024Revised Tariff Pages, PUCO No. 8, Update to Rider DRR electronically filed by Emily Brunson on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
03/01/2024Revised Tariff Pages, PUCO No. 8, Update to Riders DUN, GCR, PUR, NDU and EDR electronically filed by Natalie Alcorn on behalf of Fanelli, Santino L. Mr. and The Toledo Edison Company.15
03/01/2024Revised Tariff Pages, PUCO No. 8, Update to Rider AER electronically filed by Emily Brunson on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr..6
03/01/2024Revised Tariff Pages, PUCO No. 8, Update to Rider AMI electronically filed by Emily Brunson on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr..6
02/09/2024Revised Tariff Pages, PUCO No. 11, Update to Rider LGR electronically filed by Ms. Jill R. Olbrysh Sustar on behalf of The Toledo Edison Company and Fanelli, Santino.7
01/02/2024Application to Update the Rider DCR electronically filed by Ms. Kristen M. Fling on behalf of The Toledo Edison Company.74
12/21/2023In the Matter of the Application of The Toledo Edison Company for Approval of a Tariff Change - Update to their Pole Attachment Tariff electronically filed by Ms. Kristen M. Fling on behalf of The Toledo Edison Company.16
12/15/2023Revised Tariff Pages, PUCO No. 8, Update to Rider SGF electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
12/15/2023Revised Tariff Pages PUCO No. 8, Update to Rider USF electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and American Transmissions Systems, Inc.6
12/01/2023In the Matter of the Application Tariff Pages, PUCO No. 8, Update to Rider DSE electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
12/01/2023In the Matter of the Application Tariff Pages, PUCO No. 8, Update to Rider LGR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
12/01/2023In the Matter of the Application Tariff Pages, PUCO No. 8, Update to Riders DUN, GCR, PUR, NDU AND EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.15
12/01/2023In the Matter of the Application Application Pages, PUCO No. 8, Update to Riders DRR and RER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, L. Mr.18
12/01/2023In the Matter of the Application Tariff Pages, PUCO No. 8, Update to Rider TSA electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.13
12/01/2023In the Matter of the Application Tariff Pages, PUCO No. 8, Update to Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/01/2023In the Matter of the Application Tariff Pages, PUCO No. 8, Update to Rider AER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/01/2023In the Matter of the Application Tariff Pages, PUCO No. 8, Update to Rider CFA electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
11/15/2023Revised Tariff Sheet, PUCO No. 8, Update to Rider SGF electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
11/01/2023Revised Tariff Pages PUCO No. 8, Update to Rider PIR electronically filed by Karen A. Sweeney on behalf of Fanelli, Santino L. Mr. and The Toledo Edison Company.10
11/01/2023Revised Tariff Pages PUCO No. 8, Update to rider CRC electronically filed by Karen A. Sweeney on behalf of Fanelli, Santino L. Mr. and The Toledo Edison Company.13
10/02/2023In the Matter of the Application to Update the Rider DCR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
08/31/2023Revised Tariff Pages, PUCO No. 8, Update to Rider AER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
08/31/2023Revised Tariff Pages, PUCO No. 8, Update to riders DUN, GCR, PUR, NDU, and EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
08/29/2023Revised Tariff Pages, PUCO No. 8, Update to Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
08/29/2023Revised Tariff Pages, PUCO No. 8, Update to Rider DRR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.9
06/30/2023Revised Tariff Pages, Update to Rider DCR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
06/01/2023Revised Tariff Pages, PUCO No. 8, Update to Rider LGR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.21
06/01/2023Revised Tariff Pages, PUCO No. 8, Update to Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
06/01/2023Revised Tariff Pages, PUCO No. 8, Update to Riders DUN, GCR, PUR, NDU, and EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.12
06/01/2023Revised Tariff Pages, PUCO No. 8, Update to Rider AER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
06/01/2023Revised Tariff Pages, PUCO No. 8, Update to Rider DSE electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
06/01/2023Revised Tariff Pages, PUCO No. 8, Update to Riders DRR and RER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.18
05/23/2023Revised Tariff Pages, PUCO No. 8, Update to Rider GEN electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
05/01/2023Revised Tariff Pages, PUCO No. 8, Update to Rider PIR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
05/01/2023Revised Tariff Pages, PUCO No. 8, Update to Riders RTP, CPP AND HLF electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.17
04/20/2023Revised Tariff Pages, PUCO No. S-2, Update to the Supplier Tariff electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.52
04/14/2023Revised Tariff Pages, Update to Rider DCR, electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.75
03/30/2023Revised Tariff Pages, PUCO No. 8, Update to Rider NMB electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/01/2023Revised Tariff Pages, PUCO Tariff No. 8, Tariff Update to Riders DUN, GCR, PUR, NDU, and EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
03/01/2023Revised Tariff Pages, PUCO Tariff No. 8, Tariff Update to Rider AER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/01/2023Revised Tariff Pages, PUCO Tariff No. 8, Tariff Update to Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
02/28/2023Revised Tariff Pages, PUCO Tariff No. 8, Update to Rider DRR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.9
01/09/2023Revised Tariff Pages Update, PUCO No. 8, to Rider DCR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
12/21/2022Revised Tariff Pages, PUCO No. 8, Update to Rider SGF electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
12/20/2022Update to their Pole Attachment Tariff electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
12/20/2022Revised Tariff Pages, PUCO No. 8, Update to USF electronically filed by Karen A. Sweeney on behalf of TheToledo Edison Company and Fanelli, Santino L. Mr.5
12/01/2022Revised Tariff Pages, PUCO No. 8, Update to Riders DUN GCR PUR NDU EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.12
12/01/2022Revised Tariff Pages, PUCO No. 8, Update to Rider LGR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.21
12/01/2022Revised Tariff Pages, PUCO No. 8, Update to Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/01/2022Revised Tariff Pages, PUCO No. 8, Update to Rider TSA electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.13
12/01/2022Revised Tariff Pages, PUCO No. 8, Update to Rider CFA electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
12/01/2022Revised Tariff Pages, PUCO No. 8, Update to Rider AER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/01/2022Revised Tariff Pages, PUCO No. 8, Update to Riders DRR and RER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.18
12/01/2022Revised Tariff Pages, PUCO No. 8, Update to Rider DSE electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
11/16/2022Revised Tariff Pages, PUCO Tariff No. 8, Update to Rider SGF electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
11/01/2022Revised Tariff Pages, P.U.C.O. No. 8, Tariff Update to Rider PIR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
11/01/2022Revised Tariff Pages, P.U.C.O. No. 8, Tariff Update to Rider CRC electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.14
10/21/2022In the Matter of the Application of The Toledo Edison Company for Approval of a Tariff Change - Update to their Pole Attachment Tariff electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.19
10/05/2022Revised Tariff Pages, PUCO No. 8, Update to Rider DCR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
09/01/2022Revised Tariff Pages, PUCO No. 8, Update to Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
09/01/2022Revised Tariff Pages, PUCO No. 8, Update to Rider AER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
09/01/2022Revised Tariff Pages, PUCO No. 8, Update to Riders DUN GCR PUR NDU EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
09/01/2022Revised Tariff Pages, PUCO No. 8, Update to Rider DRR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.9
07/07/2022Revised Tariff Pages, PUCO No. 8, Update to Rider DCR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
06/27/2022Tariff Update to Rider CRC electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
06/01/2022Revised Tariff Update Pages of Riders DUN GCR PUR NDU EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.12
06/01/2022Revised Tariff Pages, P.U.C.O. No.8 Tariff Update to Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
06/01/2022Revised Tariff Pages, P.U.C.O. No.8 Tariff Update to Rider AER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
06/01/2022Revised Tariff Pages, P.U.C.O. No.8 Tariff Update to Rider DSE electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
06/01/2022Revised Tariff Pages, P.U.C.O. No.8 Tariff Update to Riders DRR RER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.18
06/01/2022Revised Tariff Pages, P.U.C.O. No.8 Tariff Update to Rider LGR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.18
05/26/2022Revised Tariff Pages, P.U.C.O. No.8 Tariff Update to Rider GEN electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.7
05/12/2022Revised Tariff Pages, PUCO No. 8, PIR Filing electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
05/05/2022Revised Tariff Pages, PUCO No. 8, Update to Rider PIR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
05/03/2022Revised Tariff Pages, PUCO No. 8, Update to Riders RTP, CPP and HLF electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.13
04/06/2022Tariff Update to Rider DCR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.75
03/01/2022Tariff Update to Rider AER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/01/2022Tariff Update to Riders DUN GCR PUR NDU and EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
03/01/2022Tariff Update to Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/01/2022Tariff Update to Rider DRR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.9
02/25/2022Revised Tariff Pages, PUCO No. 8, Update to Rider NMB electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.19
01/28/2022Tariff Update to Rider CRC electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
01/12/2022Revised Tariff Pages, PUCO No. 8, Update to Rider GEN (TVR) electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
01/12/2022Revised Tariff Pages, PUCO No. 8, Update to Rider DCR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
12/20/2021Revised Tariff Pages, PUCO No. 8, Update to Rider USF electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/17/2021PUCO No. 8 Tariff Update to Rider CRC electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/10/2021Revised Tariff Pages, PUCO No. 8, Update to Rider SGF electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
12/01/2021Application to Revise Tariff Pages, PUCO No. 8, Update to Riders DRR and RER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.14
12/01/2021Application to Revise Tariff Pages, PUCO No. 8, Update to Riders DUN, GCR, PUR, NDU and EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.12
12/01/2021Application to Revise Tariff Pages, PUCO No. 8, Update to Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/01/2021Application to Revise Tariff Pages, PUCO No. 8, Update to Rider AER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/01/2021Application to Revise Tariff Pages, PUCO No. 8, Update to Rider CFA electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
12/01/2021Application to Revise Tariff Pages, PUCO No. 8, Update to Rider TSA electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.13
11/30/2021Application to Revise Tariff Pages, PUCO No. 8, Update to Rider DSE electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
11/30/2021Application to Revise Tariff Pages, PUCO No. 8, Update to Rider LGR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
11/22/2021Revised Tariff Pages, PUCO No. 8, Update to Rider PIR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
11/22/2021Revised Tariff Pages, PUCO No. 8, Update to SGF Rider electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.3
11/15/2021Revised Tariff Pages, PUCO No. 8, Update to Rider SGF electronically filed by Karen A. Sweeney on behalf of Fanelli, Santino L. Mr. and The Toledo Edison Company.6
11/02/2021Revised Tariff Pages, PUCO No. 8, Update to Rider PIR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
10/25/2021Revised Tariff Pages, PUCO No. 8, Update to Rider SGF electronically filed by Karen A. Sweeney on behalf of Fanelli, Santino L. Mr. and The Toledo Edison Company.8
10/07/2021In the Matter of the Tariff Update to Rider DCR electronically filed by Karen A. Sweeney on behalf of The Cleveland Electric Illuminating Company and Mr. Santino L. Fanelli.74
09/01/2021Revised Tariff Pages, PUCO No. 8, Update to Rider DUN, GCR, PUR, NDU, and EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.11
09/01/2021Revised Tariff Pages, PUCO No. 8, Update to Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.5
09/01/2021Revised Tariff Pages, PUCO No. 8, Update to Rider AER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.5
09/01/2021Revised Tariff Pages, PUCO No. 8, Update to Rider DRR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.6
08/31/2021Revised Tariff Pages, PUCO No. 8, Update to Rider CSR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.6
08/30/2021Revised Tariff Pages, PUCO No. 8, Update to Rider NMB electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.6
07/14/2021Revised Tariff Pages, PUCO No. 8, Update to Rider CSR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.15
07/07/2021Revised Tariff Pages, PUCO No. 8, Update to Rider DCR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.74
06/21/2021Application for Review of the Non-Market-Based Services Rider Report in Support of Staff's 2021 Interim Review and for a Tariff Update of Rider NMB electronically filed by Mrs. Nancy E Davis on behalf of The Toledo Edison Company and Fanelli, Santino Mr.22
06/01/2021Updated Tariff Sheet for Rider DSE, PUCO No. 8, electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
06/01/2021Revised Tariff Pages, PUCO No. 8, Updated Tariff Sheet for Riders DUN GCR PUR NDU EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.12
06/01/2021Tariff Update to Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
05/28/2021Tariff Update to Rider LGR, P.U.C.O. No.8, electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
05/28/2021P.U.C.O. No.8 Tariff Update to Riders DRR and RER electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
05/26/2021Tariff Update to Rider AER, P.U.C.O. No.8, electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
05/26/2021Tariff Update to Rider GEN, P.U.C. O. No.8, electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
05/03/2021Tariff Update to Rider PIR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
04/30/2021Tariff Update to Riders RTP CPP and HLF electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.13
04/06/2021Tariff Update to Rider DCR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.75
03/25/2021Tariff Update to Rider GEN electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.16
03/02/2021P.U.C.O. No. 8 Tariff Update to Riders DUN GCR PUR NDU EDR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
03/02/2021Revised Tariff Update to Rider AMI, PUCO Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/02/2021Revise Tariff Update to Rider AER, PUCO Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/02/2021Revised Tariff Update to Rider DRR, PUCO Tariff No. 8, electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.7
02/26/2021Revised Tariff Update on Rider NMB, PUCO No. 8, electronically filed by Mrs. Nancy E Davis on behalf of The Toledo Edison Company and Fanelli, Santino Mr.5
02/05/2021Tariff Update to Rider CSR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
01/05/2021Tariff Update to Rider DCR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.75
12/30/2020Revised Tariff Pages, PUCO No. 8, Update of Rider DSE electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.6
12/23/2020P.U.C.O. No. 8 Tariff Update to Rider DSE electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/23/2020Application Revised Update of Pole Attachment electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/21/2020Revised Tariff Pages of Universal Service Fund Rider, PUCO No. 8, electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/17/2020Tariff Update of Rider NMB electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.22
12/11/2020Revised Tariff Update to Rider DUN GCR PUR NDU AND EDR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.12
12/01/2020Revised Tariff Update to Rider LGR, PUCO No. 8, electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/01/2020Revised Tariff Pages, PUCO No. 8, Update to Riders DUN GCR PUR NDU EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.12
12/01/2020Revised Tariff Pages, PUCO No. 8, Update to Rider TSA electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.13
12/01/2020Revised Tariff Pages, PUCO No. 8, Update to Rider CFA electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.6
12/01/2020Revised Tariff Update to Rider AER, PUCO No, 8, electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/01/2020Revised Tariff Update to Riders DRR and RER, PUCO No. 8, electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
12/01/2020Revised Tariff Update to Rider AMI, PUCO No. 8, electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
11/03/2020Tariff Update to Rider CSR electronically filed by Karen A Sweeney on behalf of Fanelli, Santino L. Mr. and The Toledo Edison Company.16
11/02/2020Tariff Update of Rider PIR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
10/30/2020Update to Pole Attachment Tariff electronically filed by Karen A Sweeney on behalf of Fanelli, Santino L. Mr. and The Toledo Edison Company.8
10/01/2020In the Matter of the Tariff Update to Rider DCR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.75
09/01/2020Revised Tariff Update Pages of Riders DUN GCR PUR NDU EDR for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
09/01/2020Revised Tariff Update Pages to Rider AMI for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
09/01/2020Revised Tariff Update Pages to Rider AER for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
09/01/2020Revised Tariff Update Pages of Rider DRR for PUCO No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
08/17/2020Tariff Schedule Update of Rider DCR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.75
08/14/2020Revised Tariff Update pages of Rider AMO for PUCO Electric Tariff No.8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
07/31/2020Revised Tariff Update to Rider TSA for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.13
07/02/2020Tariff Update of Rider CSR electronically filed by Ms. Emily V Danford on behalf of The Toledo Edison Company.3
07/01/2020Tariff Update of Rider DCR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.75
06/08/2020Revised Tariff Update Pages of Rider AMI for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
06/08/2020Revised Tariff Updates of Riders DUN GCR PUR NDU EDR for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.12
06/08/2020Revised Tariff Update Pages to Rider AER for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
06/08/2020Revised Tariff Update Pages to Rider LGR for PUCO ELectric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
06/08/2020Revised Tariff Update Pages of Rider DSE for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
06/08/2020Revised Tariff Update Pages of Riders DRR and RER for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
05/21/2020Tariff Update to Rider GEN electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.7
05/01/2020Revised Tariff Pages, PUCO No. 8, Tariff Update of Rider PIR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.10
05/01/2020Revised Tariff Update Pages to Riders RTP, CPP and HLF for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.14
04/02/2020Tariff Update of Rider DCR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.75
03/26/2020Application to update Rider GEN electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.16
03/02/2020Revised Tariff Pages for PUCO Tariff No. 8 Update of Riders DUN, GCR, PUR, NDU and EDR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
03/02/2020Revised Tariff for PUCO No. 8 Update of Rider AER electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/02/2020Revised Tariff for PUCO Tariff No. 8 Update of Rider AMI electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/02/2020Revised Tariff for PUCO Tariff No. 8 Update of Rider DRR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
02/28/2020Final Tariff Rider NMB electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
02/28/2020P.U.C.O. No.8 tariff Update of Rider CFA electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
01/31/2020Tariff Update to Rider CSR for PUCO No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
01/30/2020Tariff Update to Rider NMB electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.23
01/02/2020Tariff Update of Rider DCR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.75
12/20/2019Tariff Update to Rider AER electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/20/2019Tariff Update to Universal Service Fund Rider electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/20/2019Tariff Update to Rider LGR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
12/20/2019Tariff Changes to Experimental Company Owned LED Lighting Program electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.9
12/19/2019Tariff Revision for PUCO Electric Tariff No. 1 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.4
12/16/2019Tariff Update of Rider NMB electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.25
12/09/2019Revised Tariff page to Rider EDR, PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
11/27/2019In the matter of the P.U.C.O. No. 8 tariff Update of Rider AMI electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
11/27/2019P.U.C.O. No. 13 tariff Update of Riders DRR and RER electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
11/27/2019P.U.C.O. No. 8 tariff Update to Rider AER electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
11/27/2019P.U.C.O. No. 8 tariff Update to Riders DUN, GCR, PUR, NDU and EDR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.14
11/21/2019Revised Tariff Pages, PUCO No. 8, Tariff Update of Rider DSE electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.5
11/01/2019Tariff Update to Rider PIR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.9
10/31/2019Update Pole Attachment Tariff electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
10/18/2019P.U.C.O. No. 8 Tariff Removal of Rider DMR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
10/18/2019P.U.C.O. No. 8 Tariff Update to Rider NMB electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
10/01/2019In the matter of the tariff Update of Rider DCR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
09/27/2019Tariff Update to Rider DMR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
09/05/2019Revised Tariff Pages, PUCO No. 8, Tariff Update to Rider DMR electronically filed by Mrs. Ashlee E. Waite on behalf of The Toledo Edison Company and Mr. Santino L Fanelli.5
08/30/2019Revised Tariff Pages, PUCO No. 8, Update for Riders, DUN, GCR, PUR, NDU and EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.11
08/30/2019Tariff Update of Rider AMI electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.7
08/30/2019Tariff Update of Rider DRR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
08/30/2019Tariff Update of Rider AER electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
08/23/2019Tariff Update of Rider DMR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
07/26/2019Revised Tariff Pages, PUCO No. 8, Final Tariff Pages in compliance with Order dated July 17, 2019 electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.14
07/02/2019Update of Rider DMR PUCO No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
07/01/2019Tariff Update of Rider DCR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
05/31/2019Revised Tariff Pages of Riders DUN GCR PUR NDU and EDR for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
05/31/2019Revised Tariff Pages, PUCO No. 8, Update to Rider DSE electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.5
05/31/2019Revised Tariff Pages, PUCO No. 8, Update of Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.5
05/31/2019Revised Tariff Pages, PUCO No. 8, Update of Riders DRR and RER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.10
05/31/2019Revised Tariff Pages of Rider AER for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
05/29/2019Revised Tariff Pages, PUCO No. 8, Correction to Rider GEN update previously filed on May 23, 2019 electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.6
05/23/2019Updated Revised Tariff Sheets of Rider GEN and PIPP rate, PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
05/02/2019Updated Tariff of Riders RTP, CPP and HLF electronically filed by Karen A Sweeney on behalf of Fanelli, Santino L. Mr. and The Toledo Edison Company.13
05/02/2019Tariff Update of Riders RTP, CPP and HLF electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.13
05/02/2019In the Matter of the update of the Pole Attachment Tariff electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.2
05/01/2019Tariff Update of Rider EDRd electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Mikkelsen, Eileen M Mrs.5
05/01/2019Tariff Update of Rider PIR electronically filed by Karen A Sweeney on behalf of 13-2144 and 89-6008.9
04/01/2019Tariff Rider DCR Update electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
03/22/2019In the Matter of the Application to update Rider GEN electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.16
03/01/2019Revised Tariff Pages, PUCO No. 8, Tariff update to Rider DRR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.6
03/01/2019Revised Tariff Pages, PUCO No. 8, Tariff update to Rider AER electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.5
03/01/2019Revised Tariff Pages, PUCO No. 8, Tariff update to Rider AMI electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.5
03/01/2019Revised Tariff Pages, PUCO No. 8, Tariff update to Riders DUN, GCR, PUR, NDU and EDR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.11
02/28/2019Revised Tariff Pages, PUCO No. 8, Tariff update to Rider NMB electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.5
01/02/2019Revised Tariff Pages, PUCO No. 8, Tariff Rider DCR Update electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.74
12/19/2018Tariff Update of Rider USF for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/14/2018Tariff Update to Rider NMB electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.25
12/05/2018Revised PUCO No. 8 Tariff Updated filing for Riders GCR and EDR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/05/2018Revised PUCO No. 8 Tariff Updated DSE filing electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
12/03/2018Tariff Update to Rider DSE , PUCO Tariff No. 8, electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/03/2018PUCO No.8 Tariff Update of Rider DMR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/03/2018PUCO No.8 Tariff Update Riders DRR and RER electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
12/03/2018PUCO No.8 Tariff Update Riders DUN GCR PUR NDU and EDR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
11/30/2018Final PUCO No.8 Tariff Update of Rider AER electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
11/30/2018In the Matter of the PUCO No. 8 Tariff update Rider AMI electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
11/29/2018Application for update of the Pole Attachment tariff electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
11/01/2018Revised Tariff Pages, PUCO No. 8, Tariff Update of PIR electronically filed by Karen A. Sweeney on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.9
10/01/2018In the Matter of the Tariff Rider DCR Update electronically filed by Karen A Sweeney on behalf of Fanelli, Santino L. Mr. and The Toledo Edison Company.74
09/28/2018Revised pages, PUCO Tariff No. 8, Rider RGC electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
08/31/2018Revised Tariff pages Update of Rider AER for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
08/31/2018Revised Tariff pages Update of Riders DUN, GCR, PUR, NDU, EDR for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
08/31/2018Revised Tariff PUCO No. 8 - Update of Rider DRR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
08/31/2018Revised Tariff pages Update of Rider AMI for PUCO Electric Tariff No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
07/02/2018Revised Tariff Pages: Update of Rider DCR for PUCO No. 8 electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
06/28/2018Tariff Update of Rider RER electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
06/28/2018Tariff Update of Rider DSE electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.4
06/07/2018Tariff update refiling for Rider RER for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.7
06/01/2018Tariff Update of Riders DUN, GCR, PUR, NDU and EDR for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
06/01/2018Tariff Update of Riders DRR and RER for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
06/01/2018Tariff Update of Rider DSE for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.7
06/01/2018Tariff Update of Rider AMI for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
06/01/2018Tariff Update of Rider AER for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
05/24/2018Revised tariff pages, PUCO No. 8, Tariff Update of Rider GEN electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.6
05/01/2018Tariff Update of Riders RTP, CPP and HLF electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.13
05/01/2018Tariff Update of Rider EDR (d) electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
05/01/2018Tariff Update of Rider PIR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.9
05/01/2018In the matter of the Application for update of Pole Attachment tariff electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.8
04/02/2018Tariff Update of Rider DCR for PUCO No 08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
03/29/2018Revised tariff pages, PUCO No. 8, Update of Rider NMB electronically filed by Mrs. Nancy E. Davis on behalf of The Toledo Edison Company and Mr. Santino Fanelli.5
03/29/2018Revised tariff pages, PUCO No. 8, Update of Rider DUN, GCR, PUR, NDU and EDR electronically filed by Mrs. Nancy E. Davis on behalf of The Toledo Edison Company and Mr. Santino Fanelli.9
03/29/2018Revised tariff pages, PUCO No. 8, Update of Rider DRR electronically filed by Mrs. Nancy E. Davis on behalf of The Toledo Edison Company and Mr. Santino Fanelli.5
03/29/2018Revised tariff pages, PUCO No. 8, Update of Rider AMI electronically filed by Mrs. Nancy E. Davis on behalf of The Toledo Edison Company and Mr. Santino Fanelli.5
03/29/2018Revised tariff pages, PUCO No. 8, Update of Rider AER electronically filed by Mrs. Nancy E. Davis on behalf of The Toledo Edison Company and Mr. Santino Fanelli.5
03/23/2018Tariff update of Rider GEN electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.16
03/02/2018Revised Tariff Pages, PUCO No. 8, Update of Rider AMI electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/01/2018Revised Tariff Pages, PUCO No. 8, Update of Rider DUN ,GCR, PUR, NDU, EDR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
03/01/2018Revised Tariff Pages, PUCO No. 8, Update of Rider AMI electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/01/2018Revised Tariff Pages, PUCO No. 8, Update of Rider AER electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/01/2018Revised Tariff Pages, PUCO No. 8, Update of Rider DRR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
02/28/2018Revised Tariff Pages, PUCO No. 8, update of Rider NMB electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
02/28/2018Revised tariff pages, PUCO No. 8, update of Rider DMR electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.5
02/28/2018Revised tariff pages, PUCO No. 8, update of Rider DCR electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.3
01/12/2018Tariff Update of Rider DMR for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
01/12/2018Tariff Update of Rider DCR for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
01/02/2018Tariff Update of Rider DCR for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
12/21/2017In the matterof the application For the proposal to replace the Partial Service Rate "GS-15" (PUCO No. 8, Sheet No. 52) electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.15
12/15/2017Tariff in support of Staff's Annual Review of the Non-Market-Based Services Rider (Rider NMB) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.24
12/13/2017Revised Tariff PUCO No. 8 - update of Universal Service Fund electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/01/2017Tariff Update of Rider DMR for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/01/2017Tariff Update of Riders DUN, GCR, PUR, NDU, EDR for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
12/01/2017Tariff Update of Riders DRR & RER for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
12/01/2017Tariff Update of Rider DSE for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/01/2017Tariff Update of Rider AMI for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/01/2017Tariff Update of Rider AER for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
11/01/2017Revised Tariff PUCO No. 8 Update of Rider PIR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.9
10/11/2017In the matter of the application of the Toledo Edison Company for approval of a new tariff electronically filed by Ms. Tamera J Singleton and Mr. Santino L. Fanelli.8
10/02/2017In the Matter of the Application for Tariff Update of Rider DCR, electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mr. Santino L. Fanelli.74
09/29/2017Revised Tariff Pages, PUCO Tariff No. 8, update of Rider RGC electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
08/31/2017Tariff update of Riders DUN, GCR, PUR, NDU, and EDR for PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
08/31/2017Tariff update of Rider DRR for PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
08/31/2017Tariff update of Rider AMI for PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
08/31/2017Tariff update of Rider AER for PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
08/03/2017Tariff update of Cogeneration and Small Power Producer Rate electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
06/30/2017Tariff Update PUCO #8 of Rider DCR electronically filed by Mrs. Nancy E Davis on behalf of The Toledo Edison Company and Fanelli, Santino Mr.0
06/05/2017Tariff update of Rider EDR correction for PUCO #8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
06/01/2017Revised PUCO Tariff No. 8 Update of Riders DUN, GCR, PUR, NDU and EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
06/01/2017Revised Tariff PUCO No. 8 Update of Rider DSE electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
06/01/2017Revised Tariff PUCO No. 8 Update of Riders DRR and RER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
06/01/2017Tariff Update of Rider AMI for PUCO 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
06/01/2017Tariff Update of Rider AER for PUCO 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
05/26/2017PUCO Tariff No. 8 Update to Rider GEN electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
05/25/2017In the matter of the Pole Attachment Update electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
05/25/2017PUCO No.8 Tariff Update of Rider GEN electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
05/18/2017Tariff revisions to PUCO Tariff No. 11, 13, and 8 Exhibit A and Exhibit B in response to PUCO Staff electronically filed by Ms. Tamera J. Singleton on behalf of Ohio Edison Company and The Cleveland Electric Illuminating Company and The Toledo Edison Company and Fanelli, Santino L. Mr.21
05/01/2017Tariff Update of Phase-In-Recovery Rider (Rider PIR) for PUCO Tariff No.08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.9
05/01/2017Tariff Update of Rider EDR(d) for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
05/01/2017Updated Tariff of Riders RTP, CPP and HLF for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.13
04/03/2017Revised Tariff PUCO No. 8 Update of Rider DCR for electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
03/17/2017Tariff update of Rider GEN electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.18
03/02/2017Tariff update of Rider GCR correction for PUCO #8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
03/01/2017Tariff update of Riders DUN, GCR, PUR, NDU and EDR for PUCO #8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
03/01/2017Tariff update of Rider AMI for PUCO #8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/01/2017Tariff update of Rider AER for PUCO #8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
03/01/2017Tariff update of Rider DRR for PUCO #8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
02/23/2017Update of Rider NMB for PUCO Electric Tariff #8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/30/2016Revised Tariff Pages: Update of Rider DCR for PUCO #08 electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
12/28/2016Tariff Rider DMR in Compliance of Order for PUCO #8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
12/28/2016Tariff update of Rider EDR(e) in Compliance of Order for PUCO #8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
12/28/2016Tariff update in Compliance of Order for PUCO #08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
12/21/2016Tariff update of Universal Service Rider for PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/15/2016Tariff PUCO No. 8 in support of Staff's Annual Review of the Non-Market-Based Services Rider (Rider NMB) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.24
12/01/2016Tariff update of PUCO No. 8 for Riders DUN, GCR, PUR, NDU and EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.10
12/01/2016Tariff update of PUCO No. 8 for Riders DRR and RER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
12/01/2016Tariff update of tariff PUCO No. 08 for Rider DSE electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/01/2016Tariff update of tariff PUCO No. 8 for Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
12/01/2016Tariff update of PUCO No. 8 for Rider AER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
11/03/2016Tariff filing in Compliance with Entry for Rider EDR(e) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
11/03/2016Tariff filing in Compliance with Entry electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.7
11/03/2016Tariff filing in Compliance with Entry electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.13
11/01/2016Update of Phase-In-Recovery Rider (Rider PIR)for PUCO Tariff No.8 electronically filed by Karen A Sweeney on behalf of Fanelli, Santino L. Mr. and The Toledo Edison Company.9
10/17/2016Final PUCO No. 8 Tariff in compliance with Order electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
09/30/2016In the matter of the tariff Update of Rider DCR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
09/30/2016Revised Tariff PUCO No. 8 Rider RGC electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
09/01/2016PUCO No. 8 Update of Riders DUN, GCR, PUR, NDU and EDR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
09/01/2016PUCO No. 8 Update of Rider DRR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.6
09/01/2016PUCO No. 8 Update of Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
09/01/2016PUCO No. 8 Update of Rider AER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
07/01/2016Tariff Update of Rider DCR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.74
06/03/2016Final PUCO No. 8 Tariff Correction for error in EDR tariff update electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
06/01/2016Tariff Update of Rider RER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
06/01/2016Tariff Update of Riders DUN, GCR, PUR, NDU, EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
06/01/2016Tariff Update of Rider DSE electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
06/01/2016Revised Tariff PUCO No. 8 Update of Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
05/26/2016Tariff Update Rider GEN - PIPP section electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.3
05/13/2016Tariff filing in Compliance with Order electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.95
05/13/2016Tariff PUCO No. 08 Update of Rider RRS electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
05/13/2016Revised Tariff PUCO No. 08 Update of Rider GEN electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.16
05/13/2016Revised Tariff PUCO No. 8 Update of Riders GCR and EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.11
05/13/2016Revised Tariff PUCO No. 8 Update of Rider DSE electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.7
05/13/2016Revised Tariff PUCO No. 8 Update of Riders DRR, RTP and CPP electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.15
05/13/2016Revised Tariff PUCO No. 8 Update of Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
05/13/2016Revised Tariff PUCO No. 8 Update of Rider AER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
05/13/2016Revised Tariff PUCO No. 08 Update of Rider RGC electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.5
05/06/2016Revised Tariff PUCO No. 8 for Interconnection electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Fanelli, Santino L. Mr.25
05/02/2016Revised Tariff PUCO No. 08, Update of Phase-In Recovery Rider (Rider PIR) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.9
04/04/2016Tariff Update of Rider DCR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.74
03/01/2016Revised Tariff PUCO No. 8 Update of Riders DUN, GCR, PUR, NDU and EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.12
03/01/2016Revised Tariff PUCO No. 08 Update of Rider DRR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.6
03/01/2016Revised Tariff PUCO No. 11 for Update of Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
03/01/2016Revised Tariff PUCO No. 8 for Update of Rider AER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
02/25/2016Final tariff for PUCO No. 08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.6
12/31/2015Tariff Update of Rider DCR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.74
12/17/2015Tariff PUCO No. 8 update of Universal Service Fund Rider, electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
12/15/2015Tariff PUCO No. 8 in support of Staff's Annual Review of the Non-Market-Based Services Rider (Rider NMB) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.24
12/01/2015Revised Tariff PUCO No. 8 Update of Riders DUN, GCR, PUR, NDU and EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.12
12/01/2015Revised Tariff PUCO No. 8 Update of Rider DSE electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
12/01/2015Tariff Update of Riders DRR, DSM, RER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.13
12/01/2015Tariff Update of Rider AMI, PUCO Tariff No. 08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
12/01/2015Tariff PUCO No. 08 for Update of Rider AER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
10/30/2015Update of Phase-In Recovery Rider (Rider PIR) electronically for PUCO Tariff No. 8 filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.9
10/02/2015In the matter of the application of The Toledo Edison Company PUCO No. 08 Quarterly pricing update of Rider DCR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.74
10/01/2015Revised Tariff Pages: Update of Rider RGC PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
09/01/2015Final Tariff P.U.C.O. No. 8 Update of Riders DUN, GCR, PUR, NDU and EDR for PUCO Tarff No. 08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M12
09/01/2015Tariff Update of Rider DRR PUCO Tariff No. 08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.6
09/01/2015Final Tariff P.U.C.O. No. 8 Quarterly update to Rider AMI, PUCO Tariff No. 8 electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
09/01/2015Final Tariff P.U.C.O. No. 8 Quarterly update to Rider AER, PUCO Tariff No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M5
07/01/2015Revised Tariff Pages: Pricing Update of Rider DCR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.74
06/01/2015Update of Riders DUN, GCR, PUR, NDU and EDR for PUCO Tarff No. 8 electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.12
06/01/2015Update of Rider DSE for PUCO No. 8 electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
06/01/2015Update of Riders DRR and RER for PUCO Tariff No. 8 electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.11
06/01/2015Quarterly update to Rider AMI, PUCO Tariff No. 08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
06/01/2015Quarterly update to Rider AER, PUCO Tariff No. 08 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
05/15/2015Application for change to Pole Attachment tariff electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M9
05/01/2015Tariff filing of Original Sheet 34 Experimental Company Owned LED Lighting Program electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.6
05/01/2015Tariff in support of Staff's Annual Review of the Generation Service Rider (Rider GEN) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.18
05/01/2015Tariff Update of Riders RTP and CPP electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.11
05/01/2015Tariff in support of Staff's Annual Review of the Non-Market-Based Services Rider (Rider NMB) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.23
05/01/2015Tariff PUCO No. 8 Update of Rider ELR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.10
05/01/2015Tariff PUCO Tariff No. 8 update of Phase-In Recovery Rider (Rider PIR) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.9
04/02/2015Revised Tariff Pages: Pricing Update of Rider DCR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.74
02/27/2015Revised tariff Update of Riders DUN, GCR, PUR, NDU, and EDR, PUCO Tariff No. 8 electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.12
02/27/2015Revised tariff Update of Rider DRR, PUCO Tariff No. 8 electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
02/27/2015Revised tariff Update of Rider AMI, PUCO Tariff No. 8 electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
02/27/2015Revised tariff quarterly update of Rider AER, PUCO Tariff No. 8 electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
01/30/2015Final tariff PUCO No. 8 filed by E.M.Mikkelsen on behalf of The Toledo Edison Company. 5
01/09/2015Tariff PUCO No. 8 - Interim Update to Non-Market-Based Services Rider electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.7
12/31/2014Tariff Pricing update of Rider DCR electronically filed by Mr. Peter R Blazunas on behalf of The Toledo Edison Company and Mikkelsen, Eileen M Mrs.74
12/22/2014Tariff update of Rider USF Universal Service Fund Rider, PUCO No. 8, electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
12/11/2014Revised tariff pages, PUCO Tariff No. 8, Original Sheet 128 Rider AMO - Automated Meter Opt-out electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
12/01/2014Revised Tariff Update of Riders DUN, GCR, PUR, NDU, EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.12
12/01/2014Tariff Update of Rider DSE electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
12/01/2014Tariff Update of Riders DRR, DSM, LEX, RER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.14
12/01/2014Tariff Update of Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
12/01/2014Revised Tariff PUCO No. 8 for Update of Rider AER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
10/31/2014PUCO No. 8 Tariff update of Phase-In Recovery Rider (Rider PIR) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.9
10/02/2014In the matter of the Pricing update of Rider DCR electronically filed by Karen A Sweeney on behalf of The Toledo Edison Company and Mikkelsen, Eileen M Mrs.74
10/01/2014Tariff Update of Rider RGC PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
08/29/2014Revised tariff pages, PUCO Tariff No. 8, for Riders DUN, GCR, PUR, NDU and EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.12
08/29/2014Revised tariff pages, PUCO Tariff No. 8 and Workpapers for Riders DRR and LEX electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.11
08/29/2014Revised tariff pages, PUCO Tariff No. 8, for Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
08/29/2014Revised tariff pages, PUCO Tariff No. 8, for Rider AER electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
07/02/2014Pricing update of Rider DCR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.74
06/12/2014Tariff filed in compliance with Order PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M6
06/02/2014Revised tariff pages, PUCO Tariff No. 8, for Riders DUN, GCR, PUR, NDU and EDR electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.12
06/02/2014Revised tariff pages, PUCO Tariff No. 8 for Rider DSE electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
06/02/2014Revised tariff pages, PUCO Tariff No. 8 and Workpapers for Riders DRR, DSM, LEX and RER electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.18
06/02/2014Revised tariff pages, PUCO Tariff No. 8, for Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
06/02/2014Revised tariff pages, PUCO Tariff No. 8, for Rider AER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
05/30/2014Revised tariff pages PUCO Tariff No. 8, filed in compliance with Finding and Order electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.7
05/16/2014Revised P.U.C.O. No. 8 tariff update to Riders RTP and CPP electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.9
05/16/2014Revised P.U.C.O. No. 8 tariff update to Rider GEN electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.14
05/01/2014Revised tariff pages PUCO Tariff No. 8. Update of Riders RTP and CPP electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.11
05/01/2014Revised tariff in support of Staff's 2014 Annual Review of the Non-Market-Based Services Rider (Rider NMB) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.24
05/01/2014Application of The Toledo Edison Company in support of Staff's 2014 Annual Review of the Generation Service Rider (Rider GEN) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M19
05/01/2014Tariff update of Phase-In Recovery Rider (Rider PIR) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.9
04/29/2014Revised tariff P.U.C.O. No. 8 compliance changes for Riders ELR, OLR and Summary Rider electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.9
04/23/2014Tariff Pricing update of Rider DCR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.74
03/03/2014Revised tariff pages, PUCO Tariff No. 8, for Riders DUN, GCR, PUR, NDU and EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.12
03/03/2014Revised tariff pages, PUCO Tariff No. 8, for Riders DRR and LEX electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.11
03/03/2014Revised tariff pages, PUCO Tariff No. 8, for Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
03/03/2014Revised tariff pages, PUCO Tariff No. 8, for Rider AER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
02/04/2014Quarterly pricing update of Rider DCR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M74
12/19/2013Revised Tariff P.U.C.O. No. 8 Update to Universal Service Rider electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M5
11/26/2013Revised tariff pages, PUCO Tariff No. 8 for Riders DUN, GCR, PUR, NDU and EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.12
11/26/2013Revised tariff pages, PUCO Tariff No. 8 for Rider DSE electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
11/26/2013Revised tariff pages, PUCO Tariff No. 8 and Workpapers for Riders DRR, DSM, LEX and RER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.18
11/26/2013Revised tariff pages, PUCO Tariff No. 8, for Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
11/26/2013Revised tariff pages, PUCO Tariff No. 8, for Rider AER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
11/01/2013In the matter of the revised P.U.C.O. No.8 Tariff Quarterly pricing update of Rider DCR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M74
11/01/2013In the matter of the Revised P.U.C.O. No.8 tariff update of Phase-In Recovery Rider (Rider PIR) PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M9
10/01/2013Update of Rider RGC PUCO No.8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
08/30/2013Revised tariff pages PUCO Tariff No. 8, changes to Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
08/30/2013Revised tariff pages, PUCO Tariff No. 8, changes to Riders DUN, GCR, PUR, NDU, and EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.12
08/30/2013Revised tariff pages, PUCO Tariff No. 8, changes to Riders DRR & LEX electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.11
08/30/2013Revised tariff pages, PUCO Tariff No. 8, changes to Rider AER electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
08/02/2013Quarterly pricing update of Rider DCR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.74
06/13/2013Tariff update to Rider DFC PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
06/13/2013Phase-In Recovery Rider (Rider PIR) PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M6
06/13/2013Final form of Rider GEN PUCO No.8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.4
05/31/2013Revised PUCO No. 8, update to Riders DRR, DSM, LEX and RER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.21
05/31/2013Revised PUCO No. 8, update to Riders DUN, GCR, PUR, NDU and EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.12
05/31/2013Revised PUCO No. 8, updates to Rider DSE electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
05/31/2013Revised tariff pages PUCO Tariff No. 8, changes to Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
05/31/2013Revised tariff pages PUCO Tariff No. 8, changes to Rider AER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
05/02/2013Staff's 2013 Annual Review of the Non-Market-Based Services Rider (Rider NMB) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.29
05/02/2013Staff's 2013 Annual Review of the Generation Service Rider (Rider GEN) electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M20
05/02/2013Quarterly pricing update of Rider DCR electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.74
05/01/2013Revised tariff pages, PUCO Tariff No. 8, changes to Riders RTP, CPP electronically filed by Ms. Tamera J. Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.11
03/01/2013Revised tariff pages PUCO Tariff No. 8, changes to Riders DUN, GCR, PUR, NDU, and EDR electronically filed by Ms. Tamera J. Singleton on behalf of Mikkelsen, Eileen M. and The Toledo Edison Company.12
03/01/2013Revised tariff pages PUCO Tariff No. 8, changes to Riders DRR and LEX electronically filed by Ms.Tamera J. Singleton on behalf of Mikkelsen, Eileen M. and The Toledo Edison Company.11
03/01/2013Revised Tariff PUCO No. 8, changes to Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of Mikkelsen, Eileen M and The Toledo Edison Company.5
03/01/2013Revised tariff pages PUCO Tariff No. 8, changes to Rider AER electronically filed by Ms. Tamera J. Singleton on behalf of Mikkelsen, Eileen M. and The Toledo Edison Company.5
02/01/2013Tariff Quarterly pricing update of Rider DCR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.74
12/13/2012Tariff Update to Universal Service Rider for The Toledo Edison Company electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
12/10/2012Tariff reflecting adjustment to Rider DSE2 PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.3
12/03/2012Tariff Revised PUCO No. 8, update to Riders DRR, DSM, LEX and RER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.20
12/03/2012Tariff Revised PUCO No. 8, update to Riders DUN, GCR, PUR, NDU, and EDR electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.12
12/03/2012Tariff Revised PUCO No. 8, updates to Rider DSE electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M5
12/03/2012Tariff Revised PUCO No. 8, update to Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M5
12/03/2012Revised Tariff PUCO No. 8, changes to Rider AER electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
11/01/2012In the matter of the application/tariff quarterly pricing update of Rider DCR for The Toledo Edison Company electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.74
10/02/2012Updated Residential Generation Credit Rider PUCO No. 8 electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.5
08/31/2012Revised tariff pages of The Toledo Edison Company, PUCO No. 8, for changes to Riders GCR and EDR electronically filed by Ms. Tamera J. Singleton on behalf of Mikkelsen, Eileen M.9
08/31/2012Revised Tariff PUCO No.08 changes to Riders AER, DRR, DUN, LEX, PUR and NDU electronically filed by Ms. Tamera J Singleton on behalf of The Toledo Edison Company and Mikkelsen, Eileen M.10
08/31/2012Revised tariff pages of The Toledo Edison Company for PUCO tariff No. 8 to the Advanced Metering Infrastructure / Modern Grid Rider (AMI)electronically filed by Ms. Tamera J Singleton.5
07/31/2012Tariff Quarterly pricing update of Rider DCR for The Toledo Edison Company electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.71
07/05/2012Tariff pages PUCO No. 8 in response to and compliance with the Order of July 2, 2012 for The Toledo Edison Company electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.6
06/29/2012Revised tariff PUCO No. 8 changes to Rider AMI to correct effective date previously filed in error. electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.3
06/29/2012Revised tariff PUCO No.8 changes to Rider GCR to correct effective date previously filed in error. electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.3
06/29/2012Tariff page of The Toledo Edison Company, PUCO No. 8, to correct effective date previously filed in error, electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.3
06/29/2012Tariff pages of The Toledo Edison Company, PUCO No. 8, to correct effective date previously filed in error. electronically filed by Ms. Tamera J. Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.7
06/29/2012Tariff pages of Toledo Edison Company, PUCO No. 8, to correct effective date previously filed in error. electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.3
06/01/2012Revised Tariff PUCO No. 08 changes to Rider AMI electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.5
06/01/2012Revised Tariff PUCO No.08 changes to Riders GCR and EDR electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.9
06/01/2012Revised Tariff PUCO No.08 changes to Rider RER electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.5
06/01/2012Revised Tariff PUCO No. 08 changes to Rider DSE electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.5
06/01/2012Revised Tariff PUCO No.08 changes to Riders AER, DRR, DUN, LEX, PUR and NDU electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.10
06/01/2012Revised tariff pages PUCO tariff No. 08 to Demand Side Management Rider (DSM) electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.5
05/01/2012Revised Tariff PUCO No. 8 for Pricing updates of Riders RTP, CPP, GEN, and NMB for The Toledo Edison Company electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.10
05/01/2012Quarterly pricing update of Rider DCR for The Toledo Edison Company electronically filed by Ms. Tamera J. Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.71
03/23/2012Notice of withdrawal of application for approval of modifications to existing partial service schedule electronically filed by Ms. Kathy J Kolich on behalf of The Toledo Edison Company.3
03/23/2012Notice of withdrawal of application for approval of a new optional standby service rider electronically filed by Ms. Kathy J Kolich on behalf of The Toledo Edison Company.3
03/06/2012Tariff page to correct and supplant the tariff page filed in error on February 3, 2012. electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M3
03/01/2012Revised Tariff PUCO No.8 changes to Riders AER, DRR, DUN, LEX, PUR and NDU on behalf of The Toledo Edison Company. electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.10
03/01/2012Revised Tariff PUCO No. 8, changes to Riders GCR and EDR on behalf of The Toledo Edison Company electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.9
03/01/2012Revised tariff pages PUCO tariff No. 8 to the Advanced Metering Infrastructure / Modern Grid Rider (AMI) on behalf of The Toledo Edison Company electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M5
02/28/2012Notice Pertaining to Errata Items in Delivery Capital Recovery Rider (DCR) schedules filed on February 3, 2012 in Ohio Edison Company Case No. 12-522-EL-RDR electronically filed by Ms. Tamera J Singleton on behalf of Mikkelsen, Eileen M.3
02/03/2012In the matter of the application of The Toledo Edison Company’s Delivery Capital Recovery Rider (DCR) Quarterly Filing for April 1, 2012 electronically filed by Ms. Tamera J. Singleton on behalf of Mikkelsen, Eileen M.69
12/19/2011Tariff PUCO No. 8 Adjustments to the Universal Service Fund Rider on behalf of TheToledo Edison Company electronically filed by Ms. Tamera J Singleton on behalf of FirstEnergy Corp and Mikkelsen, Eileen M.5
12/01/2011Revised Tariff PUCO No.8 changes to Demand Side Management and Energy Efficiency Rider (DSE) on behalf of The Toledo Edison Company electronically filed by Mr. George A Yurchisin on behalf of FirstEnergy Corp. and Mikkelsen, Eileen M.5
12/01/2011Revised Tariff PUCO No.8 changes to Riders AER, DRR, DUN, LEX, PUR and NDU on behalf of The Toledo Edison Company electronically filed by Mr. George A Yurchisin on behalf of FirstEnergy Corp. and Mikkelsen, Eileen M.10
12/01/2011Revised Tariff PUCO No. 8 changes to Riders GCR and EDR on behalf of The Toledo Edison Company electronically filed by Mr. George A Yurchisin on behalf of FirstEnergy Corp. and Mikkelsen, Eileen M.9
12/01/2011Revised tariff pages PUCO tariff No.8 to the Residential Electric Heating Recovery Rider (RER) on behalf of The Toledo Edison Company electronically filed by Mr. George A Yurchisin on behalf of FirstEnergy Corp. and Mikkelsen, Eileen M.5
12/01/2011Revised tariff pages PUCO tariff No. 8 to Demand Side Management Rider (DSM) on behalf of The Toledo Edison Company electronically filed by Mr. George A Yurchisin on behalf of FirstEnergy Corp. and Mikkelsen, Eileen M.5
12/01/2011Revised tariff pages PUCO tariff No. 8 to the Advanced Metering Infrastructure / Modern Grid Rider (AMI) on behalf of The Toledo Edison Company electronically filed by Mr. George A Yurchisin on behalf of FirstEnergy Corp. and Mikkelsen, Eileen M..5
12/01/2011Revised tariff pages PUCO tariff No.8 to the Delivery Service Improvement Rider (DSI) behalf of The Toledo Edison Company electronically filed by Mr. George A Yurchisin on behalf of FirstEnergy Corp. and Mikkelsen, Eileen M..5
12/01/2011Revised tariff pages PUCO tariff No. 8 to the Residential Deferred Distribution Cost Recovery Rider (RDD) and Non-Residential Deferred Distribution Cost Recovery Rider (NDD) on behalf of The Toledo Edison Company electronically filed by Mr. George A Yurchisin on behalf of FirstEnergy Corp. and Mikkelsen, Eileen M..6
11/01/2011Tariff Compliance filing for 2012 Rider DCR for The Toledo Edison Company electronically filed by Ms. Meghan C. Moreland on behalf of FirstEnergy and Ms. Eileen M. Mikkelsen.42
09/01/2011Tariff pages reflect changes to the Advanced Metering Infrastructure / Modern Grid Rider (AMI) and its associated pages, PUCO No. 8 on behalf of The Toledo Edison Company electronically filed by Mr. George A Yurchisin on behalf of FirstEnergy Corp. and Mikkelsen, Eileen M.5
09/01/2011Tariff pages reflect changes to Riders GCR and EDR and their associated pages, PUCO No. 8 on behalf of The Toledo Edison Company electronically filed by Mr. George A Yurchisin on behalf of FirstEnergy Corp. and Mikkelsen, Eileen M.9
09/01/2011Tariff pages reflect changes to Riders AER, DRR, DUN, PUR, and NDU and their associated pages, PUCO No. 8 on behalf of The Toledo Edison Company electronically filed by Mr. George A Yurchisin on behalf of FirstEnergy Corp. and Mikkelsen, Eileen M.9
08/31/2011Revised tariff PUCO No. 8 filed on behalf of The Toledo Edison Company by E. Mikkelsen. (FAX)5
08/02/2011Revised tariff PUCO No. 8 changes to the Residential Deferred Distribution Cost Recovery Rider (RDD) and Non-Residential Deferred Distribution Cost Recovery Rider (NDD) due to reconciliation, and associated pages on behalf of The Toledo Edison Company electronically filed by Mr. George A Yurchisin on behalf of FirstEnergy Corp. and Mikkelsen, Eileen M.6
06/23/