Date FiledSummaryPages
10/16/2000ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates.13
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates 7
10/16/2000ICN #0102 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.)6
11/04/1991ICN #0100 Letter stating that Inland-Lake Shore Trans- mission Line field construction activities were completed on October 21, 1991, line was energized on October 25, 1991, for testing purposes, and commercial operation is anticipated to begin later this year, filed on behalf of applicant by M. Ams.0
03/22/1991ICN #0099 Letter to Mr. M. J. Ams, Centerior Energy, stating that applicant may proceed with construction of the portion of the plan and profile drawings which were submitted March 12, 1991, filed on behalf of OPSB staff by J. Kennedy.0
03/21/1991ICN #0098 Memorandum contra to the request for reconsidera- tion and re-opening of hearing procedures filed by Gallo Display, Inc., et. al., filed on behalf of CEI by C. Smith.0
03/18/1991ICN #0097 Set of engineering drawings for the single circuit section of the transmission line and for grade construction at the Inland and Lake Shore stations filed on behalf of applicant by W. Ams.0
03/11/1991ICN #0096 Request for reconsideration and reopening of hearing procedures filed on behalf of Gallo Displays, Inc.; Beverage Distributors, Inc.; Milner Electric Company; G.R.Z. Properties Company; and Hexagraphics, Inc. by R. Siegel.0
02/20/1991ICN #0095 Letter notifying the Commission that measures have been developed to deal with possible interference with existing radio antennas owned by the Ohio Department of Transportation and Boothe Broadcasting adjacent to the subject transmission line, filed on behalf of applicant by M. Ams.0
02/14/1991ICN #0094 Letter stating that construction of the portion of the project represented on the drawing may proceed, filed on behalf of OPSB staff by J. Kennedy.0
02/01/1991ICN #0093 One set of engineering drawings for the double circuit section of the transmission line and for the circuit breaker foundations at Inland, filed on behalf of applicant by J. Ams.0
10/31/1990ICN# 0092 Letter filed on behalf of the OPSB stating that the engineering drawings are consistent with the description of the certificated project filed by J. Kennedy.0
10/31/1990ICN# 0091 Drawings of the proposed construction filed on behalf of the applicant by A. Ams.0
10/29/1990ICN #0090 Opinion, Order, and Certificate issued approving the joint stipulation submitted on the amended application and ordering the certificate of Environmental Compatibility and Public Need be issued. (OPSB)0
09/27/1990ICN #0089 Transcript filed for hearing held 9/18/90, (RG) l0 pgs., Submitted.0
09/27/1990ICN #0088 Transcript filed for hearing held 9/17/90, (RG), 5 pgs., Continued.0
09/18/1990ICN #0087 Joint stipulation filed on behalf of applicant by C. Smith, the City of Cleveland by C. Glazer, and the OPSB by M. Malone.0
08/31/1990ICN #0086 Staff report filed.0
08/13/1990ICN #0085 Letter stating that the transmission line will be located entirely within the boundaries of the City of Cleveland and they will defer to their judgement concerning this project, filed on behalf of Cuyahoga County Planning Commission by R. Sicha.0
07/30/1990ICN #0084 Proof of publication filed on behalf of applicant by C. Smith. (Cuyahoga County)0
06/29/1990ICN #0083 Entry scheduling local public hearing be held on 9/17/90 at 7:00 p.m. at the Lausche State Office Building, Cleveland, Ohio and the adjudicatory hearing on 9/18/90 at l0:00 a.m. at the offices of the Commission; notice of the hearings be published by CEI as set forth in Finding 3. (OPSB)0
06/22/1990ICN #0082 Letter sent to companies of the amended application filed on behalf of the applicant by C. Smith.0
06/22/1990ICN #0083 Certificate of service filed on behalf of CEI by C. Smith.0
06/13/1990ICN #0081 Letter stating that the amended application for the l38 kV Inland-Lakeshore Transmission Line project received May 15, l990, has today been certified as complete in accordance with Ohio Administrative Code Rule 4906-l-l4 (A)(l), filed on behalf of the OPSB by Chair Butler.0
05/15/1990ICN# 0080 Amended application filed on behalf of the applicant by L. Phillips.0
05/15/1990ICN# 0079 Memorandum filed on behalf of the applicant by C. Smith.0
05/01/1990ICN #0078 Entry extending "negotiation period" set forth in the stipulation until 5/16/90. (OPSB)0
04/30/1990ICN #0077 Joint motion for extension of the negotiating period filed on behalf of the City of Cleveland by C. Glazer and CEI by C. Smith.0
03/20/1990ICN #0076 Entry extending "negotiation period" set forth in the stipulation until 5/1/90. (AE)0
03/15/1990ICN# 0075 Joint motion for extension of the negotiating period by CEI and the City of Cleveland filed by C. Smith and C. Glazer.0
02/02/1990ICN #0074 Entry extending "negotation period" set forth in the stipulation until 3/15/90. (AE)0
01/29/1990ICN# 0073 Jointly submitted report of the City of Cleveland and CEI, and request for extension of the negotiating period filed by C. Smith and C. Glazer.0
12/28/1989ICN #0072 Entry ordering joint stipulation be amended to reflect change set forth in paragraph 3 of this entry. (AE)0
12/15/1989ICN# 0071 Clarification of joint stipulation filed on behalf of the parties by W. Gruber, C. Smith and P. Malone.0
10/30/1989ICN# 0070 Entry approving the joint stipulation in its entirety and that in the event that the CEI and the City of Cleveland do not agree to a joint facility, they must file excptions within twenty days following expiration of the negotiation period. (OPSB)0
09/21/1989ICN. #0069 Entry ordering that the time for filing exception to the Report and Recommendation shall be continued to 11/20/89. (AE)0
09/18/1989ICN #0068 Joint stipulation, further request for extension of time to file exceptions and request to reopen proceedings filed on behalf of CEI by C. Smith, Staff by M. Malone, and City of Cleveland by W. Gruber.0
09/18/1989ICN 0067 Request of parties for an additional extension of time for filing exceptions filed on behalf of CEI by C. Smith, Staff by M. Malone, and City of cleveland by W. Gruber.0
09/11/1989ICN #0066 Entry ordering that time for filing exceptions to the Report and Recommendation be extended until 9/18/89.0
09/11/1989ICN #0065 Request of parties for an extension of time for filing exceptions filed on behalf of parties by C. Smith, C. Walker, & W. Gruber.0
08/22/1989ICN. #0064 Letter filed by I. Chudner on behalf of West Park Community Council.0
08/21/1989ICN. #0063 Adminstrative Law Judge's Report and Recommenda- tion issued.0
08/09/1989ICN. #0062 Letter filed by B. Krumhansl on behalf of St. Clair-Superior Coalition, informing the OPSB of their disapproval of the plans of the applicant to construct an underground transmission line.0
06/27/1989ICN. #0058 Reply Brief by applicant, The Cleveland Electric Illuming Company, filed by C. Smith.0
06/27/1989ICN. #0061 Reply Brief of The Staff of Ohio Power Siting Board filed by C. Walker.0
06/27/1989ICN. #0060 Unreported decision supplement of intervenor Mayor George V. Voinovich, filed by C. Glazer on behalf of City of Cleveland, Ohio.0
06/27/1989ICN. #0059 Reply Brief of Intervenor Mayor George V. Voinovich filed by C. Glazer on behalf of City of Cleveland.0
06/15/1989ICN# 0054 Unreported decisions supplement of intervenor Mayor George V. Voinovich filed by G. Glazer.0
06/15/1989ICN# 0053 Initial brief of intervenor Mayor George V. Voinovich filed by C. Glazer.0
06/15/1989ICN. #0057 Post-Hearing Brief of The Staff of The Ohio Power Siting Board, filed by C. Walker.0
06/15/1989ICN. #0056 Staff's proposed Findings of Fact and Conclusions of Law filed by M. Malone.0
06/15/1989INC. #0055 Initial Brief by applicant The Cleveland Electric Illuminating Company filed by C. Smith.0
06/09/1989ICN. #0052 Letter filed by C. Glazer on behalf of the City of Cleveland, to; R. Gooden/OSPB.0
06/08/1989ICN. #0051 Entry granting the city of Cleveland a 48-hour extension of time for the filing of initial briefs to be filed on 6/15/89; The 6/27/89 due date for reply briefs is unaffected by this ruling. (AE)0
06/07/1989ICN. #0050 Request for 48 hour extension of time to file briefs filed by Wm. Gruber and C. Glazer on behalf of intervenor, Mayor George V. Voinovich.0
05/30/1989ICN #0049 Trans for hearing held on May 16, 1989, submitted (RG) 58 pgs, Vol V0
05/30/1989ICN #0048 Trans. for hearing of May 12, 1989 (RG) con't 170 pgs, Vol IV0
05/25/1989ICN. #0047 Trans., for hearing held on 5/11/89, (RG) Con't. Vol. III 1-151 pages.0
05/24/1989ICN. #0046 Trans., for hearing held on 5/10/89, (RG) Con't. Vol. II, 1-179 pages.0
05/23/1989ICN. #0045 Trans., for hearing held on 5/9/89, (RG) Con't. Vol. I, 1-159 pages.0
05/16/1989ICN. #0044 Prehearing Conference held on 5/1/89, (RG) Con't. Vol. I, 1-21 pages with exhibits.0
05/12/1989ICN. #0043 Errata sheets and signature pages for the deposition transcripts of Bruce Barrett and George Pofok filed on 5/9/89 on behalf of applicant.0
05/10/1989ICN. #0042 Exhibit List of the staff of the OPSB filed by M. Malone.0
05/09/1989ICN. #0041 Deposition of Raymond L. Knight, Jr., on behalf of applicant.0
05/09/1989ICN. #0040 Deposition of John Weber on behalf of applicant0
05/09/1989ICN. #0039 Deposition of Donald Jankura, on behalf of applicant.0
05/09/1989ICN. #0038 Deposition of Bruce Barrett and George Pofok filed by C. Spencer on behalf of applicant.0
05/09/1989ICN. #0037 Appearance of Counsel filed by C. Smith on behalf of applicant,0
05/01/1989ICN. #0036 Appearance of Counsel filed by Wm. Gruber and C. Glazer on behalf of City of Cleveland,0
04/27/1989ICN. #0035 OPSB Staff's memorandum in reply to brief of Cleveland in opposition to motion in limine filed by C. Walker.0
04/26/1989ICN. #0034 Response by The Cleveland Electric Illuminating Company to motion for a continuance by City of Cleveland filed by C. Smith.0
04/26/1989ICN. #0033 Letter filed by C. Smith on behalf of applicant, informing the Commission that the deposition of applicant will be on 4/28/89.0
04/24/1989ICN. #0032 Request for issuance of subpoenas filed by C. Glazer and Wm. Gruber on behalf of City of Cleveland.0
04/24/1989ICN. #0031 Brief of The Mayor of The City of Cleveland in opposition to motion in limine filed by C. Glazer.0
04/21/1989ICN. #0030 Notice of Deposition and request for production of documents filed by C. Glazer on behalf of the City of Cleveland, Ohio0
04/21/1989ICN. #0029 Notice of deposition and request for production of documents filed by C. Smith on behalf of applicant.0
04/21/1989ICN. #0028 Intervenor City of Cleveland Mayor George V. Voinovich's motion for continuance of adjudicatory hearings, filed by P. Janis and C. Galzer.0
04/10/1989ICN. #0027 Motion in Limine filed by C. Walker on behalf of OPSB.0
03/22/1989ICN. #0026 Entry ordering that the adjudicatory hearing in this matter be rescheduled for May 1, 1989, at 10:00 a.m. at the offices of the Commission. (AE)0
03/10/1989ICN# 0025 Letter filed on behalf of the applicant requesting that the hearing be held some time in May filed by C. Smith.0
02/27/1989ICN. #0024 Filing of correspondence and certificate of service filed by C. Smith on behalf of applicant.0
02/08/1989ICN# 0023 Trans., for hearing held on 1/31/89, (EC) Submitte Vol. 1, 1-14 pages.0
02/02/1989ICN. #0022 Letter filed by B. Krumhansl on behalf of St. Clair-Superior Coalition, opposing the construction of applicant.0
01/30/1989ICN # 0021 Entry stating that at the adjudicatory hearing scheduled for February 2, 1989 should be continued to a date to be determined prior to the adjournment of the public hearingj on January, 31, 1989. (OPSB)0
01/25/1989ICN. #0020 Reply to Joint motion for continuance filed by C. A. Walker on behalf of The Staff and Cleveland Electric Illuminating Company.0
01/19/1989ICN# 0019 Joint motion for continuance of the adjudicatory hearings filed on behalf of CEI and the City of Cleveland by C. Smith and P. Janis.0
01/13/1989ICN. #0018 Staff Report issued.0
12/16/1988ICN# 0017 Entry stating that the Mayor of Cleveland's intervention be granted and deem a party in this case (OPSB)0
11/28/1988ICN# 0016 Proof of publication filed on behalf of the applicant by C. Smith.0
11/22/1988ICN. #0015 Letter filed by G. Cantrall on behalf of The Cleveland Electric Illuminating Company, RE: to application fee.0
11/10/1988ICN# 0014 Letter filed on behalf of the OPSB Board requiring the applicant to publish the legal notice.0
11/03/1988ICN. #0013 Notice of Intervention filed by Wm. Gruber and P. Janis on behalf of The City of Cleveland.0
11/02/1988ICN# 0012 Letter to C. Smith stating that the draft public notice is in compliance with board rules filed by J.Kennedy.0
10/28/1988ICN. #0011 Certified Application - 132kV Inland Lake Shore Underground Transmission Line, by C. Smith on behalf of applicant.0
10/26/1988ICN. #0010 Notice of Appearance by M. Malone on behalf of the staff,0
10/24/1988ICN# 0009 Motion and memorandum in support thereof to strike notice of intervention filed on behalf of the applicant by C. Smith.0
10/17/1988ICN. #0007 Letter filed by Chairman Chema on behalf of the PUCO staff, to; Mr. William K. McClung, The Cleveland Electric Illuminating Company.0
10/17/1988ICN. #0008 Notice of Intervention filed by WM. Gruber and P. Janis on behalf of City of Cleveland.0
09/22/1988ICN. #0006 Letter filed by C. Smith on behalf of applicant, RE: publication notice.0
08/31/1988ICN. #0005 Letter filed by J. Kennedy on behalf of OPSB, to; C. Smith on behalf of applicant, RE: granting CEI a waiver of the one year filing requirement.0
08/30/1988ICN. #0004 Certificate Application for the 132KV Inland-Lake Shore Underground Circuit, filed on behalf of applicant.0
07/22/1988ICN. #0003 Application of The Cleveland Electric Illuminat- ing Company for a waiver of the one year requirement, by C. Smith.0
07/21/1988ICN# 0001 Application of the Centerior Energy Corp for a pre application conference for 10:00 a.m. on Thursday July 21, 1988 for the Inland-Lake Shore Line 132 kv.0
07/21/1988ICN# 0002 Letter filed on behalf of the applicant requesting that the pre-application conference be withdrawn filed by C. Smith.0