DIS - Case Record for 22-1125-EL-BNR Skip to main content
      
      
CASE NUMBER: 22-1125-EL-BNR
CASE DESCRIPTION: East Akron-Evans 138 kV Transmission Line Switches Installation Project
DOCUMENT SIGNED ON: 4/24/2024
DATE OF SERVICE: ________________________________________
05/09/2023 Notice of Construction Completion electronically filed by Ms. Devan K. Flahive on behalf of AmericanTransmission Systems Incorporated.
03/10/2023 Notice of Construction Start for East Akron-Evans 138 kV Transmission Line Switches Installation Project electronically filed by Mr. Christopher K. Riedel on behalf of American Transmission Systems Incorporated.
02/16/2023 Service Notice - Staff Report.
02/16/2023 Staff Report of Investigation electronically filed by Mr. Matt Butler on behalf of Staff of OPSB.
01/18/2023 Response to First Set of Data Requests from Staff electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.
12/16/2022 Construction Notice Application for the East Akron-Evans 138kV Transmission Line Switches Installation Project electronically filed by Mr. Christopher K. Riedel on behalf of American Transmission Systems Incorporated.
12/06/2022 In the Matter of the Pre-Application Notification Letter for the East Akron-Evans 138 kV Transmission Line Switches Installation Project electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.