DIS - Case Record for 18-1059-EL-BNR Skip to main content
      
      
CASE NUMBER: 18-1059-EL-BNR
CASE DESCRIPTION: Mt. Vernon-South Kenton Structure Raise Project
DOCUMENT SIGNED ON: 4/26/2024
DATE OF SERVICE: ________________________________________
05/24/2021 Notice of Start of Construction and In-Service Date for the Mt. Vernon-South Kenton Structure Raise Project electronically filed by Tanner Wolffram on behalf of AEP Ohio Transmission Company, Inc.
11/14/2018 Staff Report of Investigation electronically filed by Mr. Matt Butler on behalf of Staff of OPSB.
11/14/2018 Service Notice
09/28/2018 Notice (proof of compliance with the service and public distribution requirements set forth in Rule 4906-6-07 of the Ohio Administrative Code) electronically filed by Ms. Christen M. Blend on behalf of AEP Ohio Transmission Power Company, Inc.
08/22/2018 Construction Notice Application electronically filed by Ms. Christen M. Blend on behalf of AEP Ohio Transmission Power Company, Inc.
06/28/2018 In the matter of the Application (Pre-Application Notification Letter) electronically filed by Ms. Christen M. Blend on behalf of AEP Ohio Transmission Power Company, Inc.