DIS - Case Record for 11-3534-GA-BTX Skip to main content
      
      
CASE NUMBER: 11-3534-GA-BTX
CASE DESCRIPTION: COLUMBIA GAS OF OHIO
DOCUMENT SIGNED ON: 11/21/2024
DATE OF SERVICE: ________________________________________
03/24/2015 Memo closing case with an effective date of 3/24/15.
11/17/2014 Notice of Withdrawal of Counsel electronically filed by Mrs. Tonnetta Y Scott on behalf of Mr. Devin D Parram.
11/17/2014 Letter of Notification of Business Change of Address electronically filed by Cheryl A MacDonald on behalf of Columbia Gas of Ohio, Inc.
09/16/2013 Notice of withdrawal of Counsel submitted by Assistant Attorney General Stephen A. Reilly on behalf of the Staff of the Ohio Power Siting Board. electronically filed by Kimberly L Keeton on behalf of Ohio Power Siting Board.
10/05/2012 Notice Regarding Completion of Construction electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc. and Schraff, Christopher R. Mr.
06/27/2012 Correspondence filed by Columbia Gas of Ohio, Inc. regarding certain adjustments to the pipeline location for the Ackerman Road Natural Gas Pipeline Project electronically filed by Ms. Christen M Moore on behalf of Mr. Christopher R. Schraff and Columbia Gas of Ohio, Inc.
04/27/2012 Response letters mailed to Mr. A. Lin, and Ms. Lindsay Nelson regarding the Ackerman Road Pipeline Project from K. Wissman, OPSB.
04/24/2012 Public Comment regarding Columbia Gas of Ohio's high-pressure gas line location filed by Ms. Lindsay Nelson.
04/24/2012 Public Comment regarding Columbia Gas of Ohio's proposed high-pressure gas line location filed by Mr.Andrew Lin.
04/11/2012 Notice of approval to commence construction electronically filed by PUCO Staff.
04/02/2012 Columbia Gas of Ohio, Inc.'s Notice of Filing Corps of Engineers Nationwide Permit (NWP), Stormwater Discharge Permit, and City of Columbus Correspondence Approving Construction in a Floodplain for Certified Route electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc.
03/27/2012 Letter in opposition to the Ackerman Pipeline project filed by L. Tecca.
03/26/2012 Opinion and Order, that the Stipulation filed by the parties is approved and adopted. It is, further, ordered, that a certificate be issued to Columbia for construction, operation, and maintenance of the pipeline project as proposed along the alternate route, subject to the conditions set forth in the stipulation and this order. It is further, ordered, that the certificate contain the 32 conditions set forth in the Stipulation.
03/26/2012 Service Notice
03/19/2012 Public comment concerning Ohio State's Wetlands- Ackerman Pipeline project filed by Diane Wood.
03/09/2012 Letter expressing concern over Columbia Gas proposed 20 inch high pressure Natural Gas Transmission pipeline that runs through Ohio State University's Olentangy River Wetland Research Park filed by B.Carroll.
03/05/2012 Letter objecting to plans to locate gas lines through the Ohio State wetlands field by Dr. J. Shaver.
02/27/2012 Public Comment in regard to plans by Columbia Gas to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University filed by various consumers.
02/22/2012 Public comment in regard to the plans of Columbia Gas to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University filed by Mr. W. Easton on behalf of the Sierra Club.
02/21/2012 Public comment in objection to the plans for Columbia Gas to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University filed by S. Allen.
02/08/2012 Transcript of Columbia Gas of Ohio, Inc. hearing held on 01/23/12 Volume II before AE M. Willey electronically filed by Mrs. Jennifer Duffer on behalf of Armstrong & Okey, Inc. and Anderson, Rosemary Foster Mrs.
02/06/2012 Correspondence opposing the Ackerman Pipeline filed by M. Baker.
02/02/2012 Transcript of Columbia Gas of Ohio, Inc. for hearing held on 01/18/12 before Mandy Willey at the Public Utilities Commission of Ohio, 180 East Broad St., Room 11-A, Columbus, OH 43215 electronically filed by Mrs. Jennifer Duffer on behalf of Armstrong & Okey, Inc. and Anderson, Rosemary Foster Mrs.
01/26/2012 Letter of concern regarding the Ackerman Pipeline project filed by Ms. Stephanie Ebel.
01/25/2012 Exhibits for transcript of proceedings held on Tuesday, January 10, 2012 at the Whetstone Park of Roses Shelter House, 3901 North High Street, Columbus, Ohio before Ms. Mandy L. Willey.
01/24/2012 Transcript of Columbia Gas of Ohio, Inc. Public Hearing held on 01/10/12, before Administrative Law Judge M. Willey, electronically filed by Mrs. Jennifer Duffer on behalf of Armstrong & Okey, Inc. and Jones, Maria DiPaolo Mrs.
01/18/2012 Joint Stipulation and recommended finding of fact and conclusions of law filed by Stephen A. Reilly on behalf of the staff of the Ohio Power Siting Board, filed by Clint R. White on behalf Ohio Attorney General, filed by Christopher R. Schraff on behalf of Columbia Gas of Ohio, Inc, filed by M. Howard Petricoff on behalf of Ohio State University, filed by Stephen J. Smith on behalf of American Chemical Society, filed by Harold J Anderson III on behalf of Franklin Soil and Water Conservation District, filed by Richard C. Sabli on behalf of The Sierra Club.
01/17/2012 Notice The Ohio State University Issues List electronically filed by M HOWARD PETRICOFF on behalf of The Ohio State University.
01/17/2012 Direct Testimony of Gary L. Estep on Behalf of Columbia Gas of Ohio, Inc. in Support of Joint Stipulation of the Parties electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc.
01/17/2012 American Chemical Society's Statement in Lieu of Issues List electronically filed by Mr. Christopher L. Miller on behalf of The American Chemical Society.
01/13/2012 Notice of Appearance on Behalf of The American Chemical Society electronically filed by Mr. Christopher W. Michael on behalf of The American Chemical Society.
01/12/2012 Entry ordered, that OSU's motion for extension of the procedural schedule be granted pursuant to Finding (6). ( MLW)
01/12/2012 Public comment letter opposing the Ohio State's Wetlands -Ackerman Pipeline project filed by Mr Tarun Bansal.
01/12/2012 Motion for Extension of Deadlines electronically filed by M HOWARD PETRICOFF on behalf of The Ohio State University.
01/12/2012 Service Notice
01/06/2012 Service Notice
01/06/2012 Applicant Columbia Gas Of Ohio, Inc.'s Statement in Lieu of Issues List electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc.
01/06/2012 Entry ordering that the procedural schedule be modified as set forth in Finding (5); that the ALJ finds that Columbia's request for extension of these deadlines is reasonable and should be granted. Therefore, the deadline for each party's filing of a list of issue(s) shall be extended from January 6, 2012, to January 12, 2012, and the deadline for Columbia's filing of expert and factual testimony shall be extended from January 10, 2012, to January 13, 2012. All other deadlines and hearings shall remain as previously scheduled. (MLW)
01/06/2012 Proof of publication. (Franklin County)
01/05/2012 Applicant Columbia Gas Of Ohio, Inc.'s Motion for Extension of Time to File Issues Lists and to File Applicant’s Testimony electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc.
12/23/2011 Service Notice
12/22/2011 Staff Report of Investigation electronically filed by Mr. Christopher K Cunningham on behalf of Staff of the Ohio Power Siting Board.
12/22/2011 Service Notice
12/22/2011 Entry ordered that OSU's motion for extension of deadlines be granted, that the procedural schedule be modified as set forth in Findings (7) and (8).
12/21/2011 Statement concerning the motion of the Ohio State University for an extension of deadlines submitted on behalf of the Ohio Power Siting Board filed by Staff.
12/21/2011 Service Notice
12/21/2011 Entry ordering that the motion to intervene filed by OSU, FSWCD, ACS, and the Sierra Club are granted. (MLW)
12/20/2011 Memorandum in response of Columbia Gas of Ohio, Inc.’s Memorandum in Response to Motion for Extension of Deadlines of The Ohio State University electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc.
12/20/2011 Request The Ohio State University First Set of Interrogatories and Requests for Production of Documents to Columbia Gas of Ohio electronically filed by M HOWARD PETRICOFF on behalf of The Ohio State University
12/20/2011 Notice of Appearance on Behalf of Columbia Gas of Ohio, Inc. electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc.
12/19/2011 Motion and memorandum in support for extension of deadlines on behalf of The Ohio State University and M H. Petricoff filed by S. Howard.
12/19/2011 Memorandum in Response of Columbia Gas of Ohio, Inc. to Motions to Intervene of The Ohio State University, Franklin Soil and Water Conservation District, American Chemical Society, and Sierra Club electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc.
12/08/2011 Petition for Leave to Intervene and memorandum in support submitted by The Sierra Club filed by R. Sahli, Esq.
12/08/2011 Public Comment filed by W. Resch on behalf of the US National Ramsar Committee in regard to concern over the proposed gas lines under the Internationally Designated Olentangy River Wetland Research Park.
12/07/2011 Public comment opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by Sierra Swanson.
12/05/2011 Letters opposing the proposed Columbia Gas Ackerman Pipeline Project filed by Ms. J. Johnson and. Ms. P. Unger.
12/02/2011 American Chemical Society's motion to intervene, memorandum in support and request for hearing filed by C. Miller.
12/02/2011 Motion to intervene and memorandum in support by the Franklin Soil and Water Conservation District filed by H.J. Anderson III.
12/02/2011 Motion for leave to intervene and memorandum in support filed by M.H.Petricoff on behalf of The Ohio State University.
11/17/2011 Proof of publication; Franklin and Delaware counties filed by C. Schraff on behalf of Columbia Gas of Ohio, Inc..
11/15/2011 Columbia Gas of Ohio, Inc.'s responses to Staff interrogatories and data requests filed by C. Schraff.
11/15/2011 Letter of concern regarding the proposed Ackerman Pipeline Project filed by R. Pint.
11/14/2011 Letters of opposition regarding the proposed Columbia Gas Ackerman Pipeline Project filed by various consumers.
11/09/2011 Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by Miss Arlette Roeper.
11/08/2011 Letter in opposition to the proposed Ackerman Road Pipeline project filed by M. Peppe.
11/07/2011 Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by K. Paugh.
11/07/2011 Letter in opposition to the proposed Ackerman Pipeline project filed by numerous consumers.
11/04/2011 Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by K. DeLembo.
11/04/2011 Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by A. Wooten-Cherry.
11/03/2011 Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by Debra Gamble.
11/03/2011 Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by Pamela Cramer.
10/31/2011 Service Notice
10/31/2011 Entry ordered, that Staff file its Staff Report pursuant to Finding (3) it is, further, ordered, that all parties filed their issue(s) lists, an expert an factual testimony in accordance with Finding (3). (MLW)
10/31/2011 Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by William Vernon.
10/31/2011 Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by Michelle Rice.
10/31/2011 Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by Vanessa Scocchera.
10/31/2011 Public comments opposing the proposed plans to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University filed by Steve Kay.
10/26/2011 Service Notice
10/26/2011 Entry ordering that the hearings in this matter be scheduled at the times and places designated in finding (6). It is further, ordered that notices of the application and hearing be published by Columbia in accordance with finding (7) and (8) . It is further ordered, that Staff file its Staff Report pursuant to finding (9). It is further order that all parties file their issue(s) lists, and expert and factual testimony in accordance with finding (9). (MLW)
10/25/2011 Public comment opposing the Ackerman Pipeline project filed by J. Beamer.
10/25/2011 Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf various consumers.
10/24/2011 Letter in regards to the high-pressure gas line project filed by Ms. Tamara Dunaeff.
10/24/2011 Letter expressing concern over Columbia Gas plans to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University; and the university intends to allow it filed by various consumers.
10/20/2011 Letters from various consumers in opposition to the proposed Columbia Gas Ackerman Road Pipeline Project.
10/19/2011 Letter concerning Columbia Gas plans to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University; and the university intends to allow it filed by Concerned Citizens.
10/19/2011 Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers.
10/18/2011 Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers.
10/18/2011 Concerned citizens expressing concern over Columbia's Gas plans to locate a high-pressure gas line through the Wilma H. Schlermeier Olentangy River Wetland Research Park at The Ohio State University; and the university intends to allow it.
10/17/2011 Letters expressing concern over Columbia Gas plans to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University; and the university intends to allow it filed by Concerns Citizens.
10/14/2011 Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers.
10/14/2011 Letter concerning Columbia Gas plans to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University filed by Concern Citizens.
10/13/2011 Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers.
10/13/2011 Letters in opposition to the proposed Columbia Gas Ackerman Pipeline project filed by various consumers.
10/12/2011 Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers.
10/12/2011 Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers.
10/12/2011 Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers.
10/04/2011 Affidavit of Proof of Service of certified application on Public Officials pursuant to OAC. filed by Christopher Schraff on behalf of Columbia Gas of Ohio Inc.
09/19/2011 Letter to C. Schraff regarding the Ackerman Road Natural Gas Pipeline Application from Chariman T. Snitchler.
08/29/2011 Service notice.
08/29/2011 Entry ordering Columbia's motion for a waiver is granted.(MW)
08/25/2011 Supplement to the application for a Certificate of Environmental Compatibility and Public Need for the Construction of the Ackerman Road Natural Gas Pipeline Project. on behalf Columbia Gas Ohio Inc.
08/16/2011 OPSB Staff's response to the applicant's motion for waiver not objecting to the proposal filed by Staff, S. Reilly.
07/29/2011 Application for a certificate of Environmental Compatibility and Public need for the construction of the Ackerman Road Natural Gas Pipeline Project filed by C.R. Schraff.
07/22/2011 Motion and memorandum in support by applicant Columbia Gas of Ohio, Inc. for waiver filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff.
06/10/2011 Notice on behalf of Columbia Gas of Ohio regarding the Ackerman Road Project filed by C. Schraff.
06/10/2011 In the matter of the notice to file an application of Columbia Gas of Ohio, Inc. for a certificate of environmental compatibility and public need for the Ackerman Road Natural Gas Pipeline Project.