03/24/2015
|
Memo closing case with an effective date of 3/24/15. |
11/17/2014
|
Notice of Withdrawal of Counsel electronically filed by Mrs. Tonnetta Y Scott on behalf of Mr. Devin D Parram. |
11/17/2014
|
Letter of Notification of Business Change of Address electronically filed by Cheryl A MacDonald on behalf of Columbia Gas of Ohio, Inc. |
09/16/2013
|
Notice of withdrawal of Counsel submitted by Assistant Attorney General Stephen A. Reilly on behalf of the Staff of the Ohio Power Siting Board. electronically filed by Kimberly L Keeton on behalf of Ohio Power Siting Board. |
10/05/2012
|
Notice Regarding Completion of Construction electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc. and Schraff, Christopher R. Mr. |
06/27/2012
|
Correspondence filed by Columbia Gas of Ohio, Inc. regarding certain adjustments to the pipeline location for the Ackerman Road Natural Gas Pipeline Project electronically filed by Ms. Christen M Moore on behalf of Mr. Christopher R. Schraff and Columbia Gas of Ohio, Inc. |
04/27/2012
|
Response letters mailed to Mr. A. Lin, and Ms. Lindsay Nelson regarding the Ackerman Road Pipeline Project from K. Wissman, OPSB. |
04/24/2012
|
Public Comment regarding Columbia Gas of Ohio's high-pressure gas line location filed by Ms. Lindsay Nelson. |
04/24/2012
|
Public Comment regarding Columbia Gas of Ohio's proposed high-pressure gas line location filed by Mr.Andrew Lin. |
04/11/2012
|
Notice of approval to commence construction electronically filed by PUCO Staff. |
04/02/2012
|
Columbia Gas of Ohio, Inc.'s Notice of Filing Corps of Engineers Nationwide Permit (NWP), Stormwater Discharge Permit, and City of Columbus Correspondence Approving Construction in a Floodplain for Certified Route electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc. |
03/27/2012
|
Letter in opposition to the Ackerman Pipeline project filed by L. Tecca. |
03/26/2012
|
Opinion and Order, that the Stipulation filed by the parties is approved and adopted. It is, further, ordered, that a certificate be issued to Columbia for construction, operation, and maintenance of the pipeline project as proposed along the alternate route, subject to the conditions set forth in the stipulation and this order. It is further, ordered, that the certificate contain the 32 conditions set forth in the Stipulation. |
03/26/2012
|
Service Notice |
03/19/2012
|
Public comment concerning Ohio State's Wetlands- Ackerman Pipeline project filed by Diane Wood. |
03/09/2012
|
Letter expressing concern over Columbia Gas proposed 20 inch high pressure Natural Gas Transmission pipeline that runs
through Ohio State University's Olentangy River Wetland Research Park filed by B.Carroll. |
03/05/2012
|
Letter objecting to plans to locate gas lines through the Ohio State wetlands field by Dr. J. Shaver. |
02/27/2012
|
Public Comment in regard to plans by Columbia Gas to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University filed by various consumers. |
02/22/2012
|
Public comment in regard to the plans of Columbia Gas to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University filed by Mr. W. Easton on behalf of the Sierra Club. |
02/21/2012
|
Public comment in objection to the plans for Columbia Gas to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University filed by S. Allen. |
02/08/2012
|
Transcript of Columbia Gas of Ohio, Inc. hearing held on 01/23/12 Volume II before AE M. Willey electronically filed by Mrs. Jennifer Duffer on behalf of Armstrong & Okey, Inc. and Anderson, Rosemary Foster Mrs. |
02/06/2012
|
Correspondence opposing the Ackerman Pipeline filed by M. Baker. |
02/02/2012
|
Transcript of Columbia Gas of Ohio, Inc. for hearing held on 01/18/12 before Mandy Willey at the Public Utilities Commission of Ohio, 180 East Broad St., Room 11-A, Columbus, OH 43215 electronically filed by Mrs. Jennifer Duffer on behalf of Armstrong & Okey, Inc. and Anderson, Rosemary Foster Mrs. |
01/26/2012
|
Letter of concern regarding the Ackerman Pipeline project filed by Ms. Stephanie Ebel. |
01/25/2012
|
Exhibits for transcript of proceedings held on Tuesday, January 10, 2012 at the Whetstone Park of Roses Shelter House, 3901 North High Street, Columbus, Ohio before Ms. Mandy L. Willey. |
01/24/2012
|
Transcript of Columbia Gas of Ohio, Inc. Public Hearing held on 01/10/12, before Administrative Law Judge M. Willey, electronically filed by Mrs. Jennifer Duffer on behalf of Armstrong & Okey, Inc. and Jones, Maria DiPaolo Mrs. |
01/18/2012
|
Joint Stipulation and recommended finding of fact and conclusions of law filed by Stephen A. Reilly on behalf of the staff of the Ohio Power Siting Board, filed by Clint R. White on behalf Ohio Attorney General, filed by Christopher R. Schraff on behalf of Columbia Gas of Ohio, Inc, filed by M. Howard Petricoff on behalf of Ohio State University, filed by Stephen J. Smith on behalf of American Chemical Society, filed by Harold J Anderson III on behalf of Franklin Soil and Water Conservation District, filed by Richard C. Sabli on behalf of The Sierra Club. |
01/17/2012
|
Notice The Ohio State University Issues List electronically filed by M HOWARD PETRICOFF on behalf of The Ohio State University. |
01/17/2012
|
Direct Testimony of Gary L. Estep on Behalf of Columbia Gas of Ohio, Inc. in Support of Joint Stipulation of the Parties electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc. |
01/17/2012
|
American Chemical Society's Statement in Lieu of Issues List electronically filed by Mr. Christopher L. Miller on behalf of The American Chemical Society. |
01/13/2012
|
Notice of Appearance on Behalf of The American Chemical Society electronically filed by Mr. Christopher W. Michael on behalf of The American Chemical Society. |
01/12/2012
|
Entry ordered, that OSU's motion for extension of the procedural schedule be granted pursuant to Finding (6). ( MLW) |
01/12/2012
|
Public comment letter opposing the Ohio State's Wetlands -Ackerman Pipeline project filed by Mr Tarun Bansal. |
01/12/2012
|
Motion for Extension of Deadlines electronically filed by M HOWARD PETRICOFF on behalf of The Ohio State University. |
01/12/2012
|
Service Notice |
01/06/2012
|
Service Notice |
01/06/2012
|
Applicant Columbia Gas Of Ohio, Inc.'s Statement in Lieu of Issues List electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc. |
01/06/2012
|
Entry ordering that the procedural schedule be modified as set forth in Finding (5); that the ALJ finds that Columbia's request for extension of these deadlines is reasonable and should be granted.
Therefore, the deadline for each party's filing of a list of issue(s) shall be extended from January 6, 2012, to January 12, 2012, and the deadline for Columbia's filing of expert and factual testimony shall be extended from
January 10, 2012, to January 13, 2012. All other deadlines and hearings shall remain as previously scheduled. (MLW) |
01/06/2012
|
Proof of publication. (Franklin County) |
01/05/2012
|
Applicant Columbia Gas Of Ohio, Inc.'s Motion for Extension of Time to File Issues Lists and to File Applicant’s Testimony electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc. |
12/23/2011
|
Service Notice |
12/22/2011
|
Staff Report of Investigation electronically filed by Mr. Christopher K Cunningham on behalf of Staff of the Ohio Power Siting Board. |
12/22/2011
|
Service Notice |
12/22/2011
|
Entry ordered that OSU's motion for extension of deadlines be granted, that the procedural schedule be modified as set forth in Findings (7) and (8). |
12/21/2011
|
Statement concerning the motion of the Ohio State University for an extension of deadlines submitted on behalf of the Ohio Power Siting Board filed by Staff. |
12/21/2011
|
Service Notice |
12/21/2011
|
Entry ordering that the motion to intervene filed by OSU, FSWCD, ACS, and the Sierra Club are granted. (MLW) |
12/20/2011
|
Memorandum in response of Columbia Gas of Ohio, Inc.’s Memorandum in Response to Motion for Extension of Deadlines of The Ohio State University electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc. |
12/20/2011
|
Request The Ohio State University First Set of Interrogatories and Requests for Production of Documents to Columbia Gas of Ohio electronically filed by M HOWARD PETRICOFF on behalf of The Ohio State University |
12/20/2011
|
Notice of Appearance on Behalf of Columbia Gas of Ohio, Inc. electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc. |
12/19/2011
|
Motion and memorandum in support for extension of deadlines on behalf of The Ohio State University and M H. Petricoff filed by S. Howard. |
12/19/2011
|
Memorandum in Response of Columbia Gas of Ohio, Inc. to Motions to Intervene of The Ohio State University, Franklin Soil and Water Conservation District, American Chemical Society, and Sierra Club electronically filed by Ms. Christen M Moore on behalf of Columbia Gas of Ohio, Inc. |
12/08/2011
|
Petition for Leave to Intervene and memorandum in support submitted by The Sierra Club filed by R. Sahli, Esq. |
12/08/2011
|
Public Comment filed by W. Resch on behalf of the US National Ramsar Committee in regard to concern over the proposed gas lines under the Internationally Designated Olentangy River Wetland Research Park. |
12/07/2011
|
Public comment opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by Sierra Swanson. |
12/05/2011
|
Letters opposing the proposed Columbia Gas Ackerman Pipeline Project filed by Ms. J. Johnson and. Ms. P. Unger. |
12/02/2011
|
American Chemical Society's motion to intervene, memorandum in support and request for hearing filed by C. Miller. |
12/02/2011
|
Motion to intervene and memorandum in support by the Franklin Soil and Water Conservation District filed by H.J. Anderson III. |
12/02/2011
|
Motion for leave to intervene and memorandum in support filed by M.H.Petricoff on behalf of The Ohio State University. |
11/17/2011
|
Proof of publication; Franklin and Delaware counties filed by C. Schraff on behalf of Columbia Gas of Ohio, Inc.. |
11/15/2011
|
Columbia Gas of Ohio, Inc.'s responses to Staff interrogatories and data requests filed by C. Schraff. |
11/15/2011
|
Letter of concern regarding the proposed Ackerman Pipeline Project filed by R. Pint. |
11/14/2011
|
Letters of opposition regarding the proposed Columbia Gas Ackerman Pipeline Project filed by various consumers. |
11/09/2011
|
Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by Miss Arlette Roeper. |
11/08/2011
|
Letter in opposition to the proposed Ackerman Road Pipeline project filed by M. Peppe.
|
11/07/2011
|
Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by K. Paugh. |
11/07/2011
|
Letter in opposition to the proposed Ackerman Pipeline project filed by numerous consumers. |
11/04/2011
|
Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by K. DeLembo. |
11/04/2011
|
Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by A. Wooten-Cherry. |
11/03/2011
|
Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by Debra Gamble. |
11/03/2011
|
Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by Pamela Cramer. |
10/31/2011
|
Service Notice |
10/31/2011
|
Entry ordered, that Staff file its Staff Report pursuant to Finding (3) it is, further, ordered, that all parties filed their issue(s) lists, an expert an factual testimony in accordance with Finding (3). (MLW) |
10/31/2011
|
Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by William Vernon. |
10/31/2011
|
Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by Michelle Rice. |
10/31/2011
|
Public comments opposing the proposed plans to locate a high-pressure gas line through the William H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University by Vanessa Scocchera. |
10/31/2011
|
Public comments opposing the proposed plans to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University filed by Steve Kay. |
10/26/2011
|
Service Notice |
10/26/2011
|
Entry ordering that the hearings in this matter be scheduled at the times and places designated in finding (6). It is further, ordered that notices of the application and hearing be published by Columbia in accordance with finding (7) and (8) . It is further ordered, that Staff file its Staff Report pursuant to finding (9). It is further order that all parties file their issue(s) lists, and expert and factual testimony in accordance with finding (9). (MLW) |
10/25/2011
|
Public comment opposing the Ackerman Pipeline project filed by J. Beamer. |
10/25/2011
|
Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf various consumers. |
10/24/2011
|
Letter in regards to the high-pressure gas line project filed by Ms. Tamara Dunaeff. |
10/24/2011
|
Letter expressing concern over Columbia Gas plans to locate a high-pressure gas line through the Wilma H. Schiermeier
Olentangy River Wetland Research Park at The Ohio State University; and the university intends to allow it filed by various consumers. |
10/20/2011
|
Letters from various consumers in opposition to the proposed Columbia Gas Ackerman Road Pipeline Project. |
10/19/2011
|
Letter concerning Columbia Gas plans to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University; and the university intends to allow it filed by Concerned Citizens. |
10/19/2011
|
Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers. |
10/18/2011
|
Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers. |
10/18/2011
|
Concerned citizens expressing concern over Columbia's Gas plans to locate a high-pressure gas line through the Wilma H. Schlermeier
Olentangy River Wetland Research Park at The Ohio State University; and the university intends to allow it. |
10/17/2011
|
Letters expressing concern over Columbia Gas plans to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University; and the university intends to allow it filed by Concerns Citizens. |
10/14/2011
|
Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers. |
10/14/2011
|
Letter concerning Columbia Gas plans to locate a high-pressure gas line through the Wilma H. Schiermeier Olentangy River Wetland Research Park at The Ohio State University filed by Concern Citizens. |
10/13/2011
|
Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers. |
10/13/2011
|
Letters in opposition to the proposed Columbia Gas Ackerman Pipeline project filed by various consumers. |
10/12/2011
|
Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers. |
10/12/2011
|
Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers. |
10/12/2011
|
Public comments concerning the location of Columbia Gas of Ohio's proposed high-pressure gas line project filed on behalf of various concerned consumers. |
10/04/2011
|
Affidavit of Proof of Service of certified application on Public Officials pursuant to OAC. filed by Christopher Schraff on behalf of Columbia Gas of Ohio Inc. |
09/19/2011
|
Letter to C. Schraff regarding the Ackerman Road Natural Gas Pipeline Application from Chariman T. Snitchler. |
08/29/2011
|
Service notice. |
08/29/2011
|
Entry ordering Columbia's motion for a waiver is granted.(MW) |
08/25/2011
|
Supplement to the application for a Certificate of Environmental Compatibility and Public Need for the Construction of the Ackerman Road Natural Gas Pipeline Project. on behalf Columbia Gas Ohio Inc. |
08/16/2011
|
OPSB Staff's response to the applicant's motion for waiver not objecting to the proposal filed by Staff, S. Reilly. |
07/29/2011
|
Application for a certificate of Environmental Compatibility and Public need for the construction of the Ackerman Road Natural Gas Pipeline Project filed by C.R. Schraff. |
07/22/2011
|
Motion and memorandum in support by applicant Columbia Gas of Ohio, Inc. for waiver filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff. |
06/10/2011
|
Notice on behalf of Columbia Gas of Ohio regarding the Ackerman Road Project filed by C. Schraff. |
06/10/2011
|
In the matter of the notice to file an application of Columbia Gas of Ohio, Inc. for a certificate of environmental compatibility and public need for the Ackerman Road Natural Gas Pipeline Project. |