08/10/2009
|
Notice that Duke Energy line F9482 138kV Electric Transmission Line Loop through Wards Corner Substation was completed and made operational on May 12, 2009 filed by S. Lane. |
02/05/2009
|
Staff investigation report and recommendation of Duke Energy Corporation. |
12/31/2008
|
In the matter of the letter of notification of Duke Energy for Line F9482 138 KV Electric Transmission Line Loop through Wards Corner Substation. |
|