Date Filed | Summary | Pages |
08/10/2009 | Notice that Duke Energy line F9482 138kV Electric Transmission Line Loop through Wards Corner Substation was completed and made operational on May 12, 2009 filed by S. Lane. | 1 |
02/05/2009 | Staff investigation report and recommendation of Duke Energy Corporation. | 1 |
12/31/2008 | In the matter of the letter of notification of Duke Energy for Line F9482 138 KV Electric Transmission Line Loop through Wards Corner Substation. | 15 |
|