Date Filed | Summary | Pages |
08/10/2009 | Notice that Duke Energy line F5680 138kV Electric Transmission Line Loop through Nickel Substation was completed and made operational on June 5, 2009 filed by S. Lane. | 1 |
01/02/2009 | Staff investigation report and recommendation filed by J. O'Dell. | 1 |
11/24/2008 | In the matter of the notification of Duke Energy for the Line F5680 138 kV electric transmission line loop through Nickel Substation. | 21 |
|