Case Record For: 22-0677-EL-BNR File a Public Comment Case Title: Broadview-Clark 138 kV Transmission Line Structure Replacement Project Status: OPEN-OPEN Industry Code: EL-ELECTRIC Purpose Code: BNR-Construction notification report Date Opened: 7/12/2022 Date Closed: Case Documents Public Comments Parties of Record Related Cases Printable Docket Card Service List View All 1 - 9 of 9 documents 1 / 1 Date FiledSummaryPages 12/14/2022Notice of Construction Completion electronically filed by Mr. Christopher K. Riedel on behalf of American Transmission Systems Incorporated.2 10/07/2022Supplemental Information for Conditions (3) and (4): Three-Birds Orchid Survey and Floodplain Permit electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.10 09/07/2022Notice Construction Start electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.2 09/01/2022Service Notice. Staff Report2 09/01/2022Staff Report of Investigation electronically filed by Mr. Matt Butler on behalf of Staff of OPSB.5 08/26/2022Response to Third Set of Data Requests From OPSB Staff electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.3 08/10/2022Responses to First and Second Sets of Data Requests from Staff electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.3 07/20/2022Construction Notice electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.52 07/12/2022In the Matter of the Pre-Application Notification Letter electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.2 1 / 1 Attorney General: Attorney Examiner: