Case Title: BELLARD SUBSTATION PROJECT
Status: OPEN-OPEN
Industry Code: EL-ELECTRIC
Purpose Code: BNR-Construction notification report
Date Opened: 3/4/2021
Date Closed:
Printable Docket Card Service List
View All
1 - 15 of 16 documents 1 /  2 
Date FiledSummaryPages
10/20/2022Notice of Construction Completion and In-Service Date electronically filed by Errin C. Harris on behalf of AMP Transmission, LLC.6
10/28/2021Building Permit Issued electronically filed by Errin C. Harris on behalf of AMP Transmission, LLC.3
10/13/2021Permit Issued - Curb Cut/Drive/Culvert Permit Issued electronically filed by Errin C. Harris on behalf of AMP Transmission, LLC.4
09/14/2021Notice of Approved Excavation Permit Application electronically filed by Errin C. Harris on behalf of AMP Transmission, LLC.2
08/19/2021Notice of Commencement of Construction electronically filed by Errin C. Harris on behalf of AMP Transmission, LLC.4
08/17/2021Notice of Approved Application for a Zoning Certificate electronically filed by Errin C. Harris on behalf of AMP Transmission, LLC.3
06/03/2021Service Notice.2
06/03/2021Staff Report of Investigation electronically filed by Mr. Matt Butler on behalf of Staff of OPSB.5
06/02/2021Ohio EPA Construction Site Stormwater General Permit Issued for the Bellard Substation electronically filed by Errin C. Harris on behalf of AMP Transmission, LLC.2
03/31/2021Notice of Correspondence from the Federal Aviation Administration - Determination of No Hazard to Air Navigation (2 of 2) electronically filed by Errin C. Harris on behalf of AMP Transmission, LLC.6
03/31/2021Notice of Correspondence from the Federal Aviation Administration - Determination of No Hazard to Air Navigation (1 of 2) electronically filed by Errin C. Harris on behalf of AMP Transmission, LLC.6
03/18/2021Notice Proof of Compliance with O.A.C. 4906-6-07 and 4906-6-08 electronically filed by Errin C Harris on behalf of AMP Transmission, LLC.25
03/11/2021Construction Notice Application for the Bellard Substation (Part 3 of 3) electronically filed by Errin C. Harris on behalf of AMP Transmission, LLC.109
03/11/2021Construction Notice Application for the Bellard Substation (Part 2 of 3) electronically filed by Errin C. Harris on behalf of AMP Transmission, LLC.261
03/11/2021Construction Notice Application for the Bellard Substation (Part 1 of 3) electronically filed by Errin C. Harris on behalf of AMP Transmission, LLC.99
 