Date Filed | Summary | Pages |
11/12/2020 | Commencement of Construction Notice for
case #20-1204-GA-BNR electronically filed by Mr. Don C Wheeler on behalf of NGO Transmission Inc. and Wheeler, Don C. | 5 |
09/29/2020 | Service Notice (Staff Rpt) | 3 |
09/28/2020 | Staff Report of Investigation electronically filed by Mr. Matt Butler on behalf of Staff of OPSB. | 5 |
07/07/2020 | Application Part 3 - Construction Notice for the State Route 13 (Line 3-C) Replacement Project located in Thorn Township, Perry County, Ohio electronically filed by Mr. Michael A Krokonko on behalf of The Energy Cooperative (NGO Transmission). | 9 |
07/06/2020 | Application Part 4 - Construction Notice for the State Route 13 (Line 3-C) Replacement Project located in Thorn Township, Perry County, Ohio electronically filed by Mr. Michael A. Krokonko on behalf of The Energy Cooperative (NGO Transmission). | 15 |
07/06/2020 | Application Part 2 - Construction Notice for the State Route 13 (Line 3-C) Replacement Project located in Thorn Township, Perry County, Ohio electronically filed by Mr. Michael A Krokonko on behalf of The Energy Cooperative (NGO Transmission). | 20 |
07/06/2020 | In the matter of the Construction Notice for the State Route 13 (Line 3-C) Replacement Project located in Thorn Township, Perry County, Ohio electronically filed by Mr. Michael A Krokonko on behalf of The Energy Cooperative (NGO Transmission). (Part 1) | 15 |