Date Filed | Summary | Pages |
01/22/2015 | Proof of publication of Notice of Proposed Major Utility Facility in the Times-Reporter filed on behalf of American Transmission Systems, Inc. by R. Schmidt, Jr. | 3 |
11/24/2014 | Letter of notification Burger-Knox 138 kV Transmission Line
Tap to Polo Road Substation Project filed by J. Thacker on behalf of FirstEnergy Service Company. | 1 |
08/11/2014 | Letter of Notification that project will start on 8/11/2014 filed by J. Toth on behalf of First Energy. | 1 |
07/24/2014 | Staff Report of Investigation electronically filed by Mr. Matt Butler on behalf of Staff of OPSB. | 3 |
07/03/2014 | In the matter of the letter of notification for the Burger-Knox 138kV Transmission Line Tap to the Polo Road Subsation Project electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc. | 22 |