Date Filed | Summary | Pages |
07/20/2015 | Notice of construction completion filed by J. Thacker on behalf of FirstEnergy Service Corporation. | 1 |
02/25/2014 | Notice of Acceptance of Staff's Proposed Conditions on Certificate electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc. | 3 |
02/18/2014 | Report of investigation electronically filed by Mr. Adam S Bargar on behalf of Staff of OPSB. | 5 |
02/11/2014 | Supplement to construction notice electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc. | 4 |
02/04/2014 | In the matter of the notice of Construction of the Boardman – Sammis 138 kV Transmission Line Loop to Nevada Substation Project electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc. | 19 |