Case Title: LEMOYNE MIDWAY 345 KV CHRYSLER LEVIS PARK 138 KV AND LEMOYNE MIDWAY 138 KV TRANSMISSION LINE EXTENSION TO DOWLING SUBSTATION PROJECT
Status: OPEN-OPEN
Industry Code: EL-ELECTRIC
Purpose Code: BLN-letter of notification
Date Opened: 1/14/2013
Date Closed:
Printable Docket Card Service List
View All
1 - 10 of 10 documents 1 /  1 
Date FiledSummaryPages
08/05/2015Notice that project was complete and placed into operation May 15, 2015 filed by T. Krauss on behalf of First Energy Service Company.1
03/19/2015Letter of Notification that the project is expected to begin on approximately March 18, 2015 filed by J. Thacker on behalf of FirstEnergy.1
11/13/2014Revised access maps. electronically filed by Ms. Jessica L Thacker on behalf of FirstEnergy Service Company and Ms. 5
12/23/2013Notice of Acceptance of Staff's Proposed Conditions and Supplement to Application electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.3
12/18/2013Report of investigation electronically filed by Mr. Adam S Bargar on behalf of Staff of OPSB5
10/17/2013Proof of Pub in the Toledo Blade and the Sentinel-Tribune for the Fulton - Lemoyne 345 kV, Chrysler - Levis Park 138 kV and Lemoyne - Midway 138 kV Transmission Line Extensions to, and installation of, Dowling Substation Project electronically filed by Ms. Shana L Eiselstein on behalf of American Transmission Systems, Inc. and Schmidt, Robert J. Mr.5
09/26/2013In the matter of the application to the Ohio Power Siting Board for a Certificate of Environmental Compatibility and Public Need of the Fulton - Lemoyne 345 kV, Chrysler - Levis Park 138 kV and Lemoyne - Midway 138 kV Transmission Line Extensions to, and installation of, Dowling Substation Project.125
09/26/2013Letter of Notification service notices regarding the Fulton-Lemoyne 345 kV, Chrysler-Levis Park 138 kV and Lemoyne-Midway 138 kV Transmission Line Extensions to, and installation of, Dowling Substation Project filed by J. Thacker.21
01/30/2013Proof of Pub of County of Lucas, Toledo Blade and Bowling Green Sentinel-Tribune.5
01/14/2013In the matter of the Pre Application Notification Letter electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc.3
 