Date Filed | Summary | Pages |
08/05/2015 | Notice that project was complete and placed into operation May 15, 2015 filed by T. Krauss on behalf of First Energy Service Company. | 1 |
03/19/2015 | Letter of Notification that the project is expected to begin on approximately March 18, 2015 filed by J. Thacker on behalf of FirstEnergy. | 1 |
11/13/2014 | Revised access maps. electronically filed by Ms. Jessica L Thacker on behalf of FirstEnergy Service Company and Ms. | 5 |
12/23/2013 | Notice of Acceptance of Staff's Proposed Conditions and Supplement to Application electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc. | 3 |
12/18/2013 | Report of investigation electronically filed by Mr. Adam S Bargar on behalf of Staff of OPSB | 5 |
10/17/2013 | Proof of Pub in the Toledo Blade and the Sentinel-Tribune for the Fulton - Lemoyne 345 kV, Chrysler - Levis Park 138 kV and Lemoyne - Midway 138 kV Transmission Line Extensions to, and installation of, Dowling Substation Project electronically filed by Ms. Shana L Eiselstein on behalf of American Transmission Systems, Inc. and Schmidt, Robert J. Mr. | 5 |
09/26/2013 | In the matter of the application to the Ohio Power Siting Board for a Certificate of Environmental Compatibility and Public Need of the Fulton - Lemoyne 345 kV, Chrysler - Levis Park 138 kV and Lemoyne - Midway 138 kV Transmission Line Extensions to, and installation of, Dowling Substation Project. | 125 |
09/26/2013 | Letter of Notification service notices regarding the Fulton-Lemoyne 345 kV, Chrysler-Levis Park 138 kV and Lemoyne-Midway 138 kV Transmission Line Extensions to, and installation of, Dowling Substation Project filed by J. Thacker. | 21 |
01/30/2013 | Proof of Pub of County of Lucas, Toledo Blade and Bowling Green Sentinel-Tribune. | 5 |
01/14/2013 | In the matter of the Pre Application Notification Letter electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc. | 3 |