Case Record For: 04-1542-GA-BTX File a Public Comment Case Title: DEL-MAR PIPELINE COMPANY, LLC Status: AR-Archived Industry Code: GA-GAS Purpose Code: BTX-Application for a Certificate/ Gas or Electric Date Opened: 10/8/2004 Date Closed: Case Documents Public Comments Parties of Record Related Cases Printable Docket Card Service List View All 1 - 15 of 48 documents 1 / 4 Date FiledSummaryPages 09/11/2009Memo reopening case effective 09/11/09.1 08/10/2009Memo automatically closing and archiving case with an effective date of 8/10/09.1 01/11/2008Notice of the withdrawal and substitution of counsel filed by J. Bentine on behalf of DEL-MAR Pipeline, Col, LLC.2 08/11/2006Correspondence stating that the drawings for the Del-Mar pipeline have been submitted filed by H. Griset.1 10/21/2005Letter advising that the construction of the 12 inch DEL-MAR pipeline was completed on September 28, 2005 and was put into commercial operation on September 29, 2005 filed by H. Griset on behalf of Utility Technologies International Corporation.1 07/15/2005Del-Mar Suburban Pipeline Frac-Out Contingency Plan filed on behalf of applicant.4 07/01/2005Response to Mr. Geist regarding letter sent June 30, 2005 from Christina Svoboda of Environmental Design Group explaining the frac-out issues that occurred, filed on behalf of Ohio Power Siting Board by K. Lambeck, Chief.1 07/01/2005Letter summarizing inspection and remediation recommendations for the frac-out that occurred on June 29, 2005 during directional drilling of the wooded wetland area north of Bethlehem Road, filed C. Svoboda-Enveronmental Scientist.1 05/26/2005Letter regarding commencement of construction filed by K. Lambeck.1 05/24/2005Correspondence stating that construction of pipeline is scheduled to begin on May 26, 2005 filed by B. Singh.1 05/23/2005Opinion, order and certificate ordering that the stipulation filed March 9, 2005 is approved and adopted in this matter, that a certificate be issued to DEL-MAR for the construction, operation, and maintenance of the project as proposed along the preferred route modified(ARS)(BEJ)(SES)(NB,MD)(JK)(FD).20 05/23/2005Service Notice1 04/20/2005Archaeology Survey filed by B. Singh on behalf of Del-Mar- Pipeline Co. LLC.57 03/14/2005Public hearing transcript held March 8, 2005; examiner G. See.62 03/14/2005Transcript and exhibits;hearing held March 9, 2005; Examiner G. See.14 1 / 4 Attorney General: Margard III, Werner Attorney Examiner: See, Greta