Summary: |
In the matter of the Notification of Construction (Construction Notice) for the Avon-Beaver No 1 and No 2 345 kv Transmission Line Extensions to Lake Avenue Substation electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc. |
|