Summary: |
ICN #0051 Opinion, Order and Certificate adopting the stip- ulation in its entirety; that a certificate of environmental compatibility and public need is hereby issued for the con- struction, operation, and maintenance of the Pawnee 138 kV transmission line along the preferred route; that the certi- ficate shall contain the conditions set forth in Section III of this order, except that CEI shall be required to submit a copy of all permits and authorization within 14 days. (26 pgs.) |
|