Summary: |
Entry ordering that public hearings shall be conducted in these matters consistent with the findings herein at the time specified; Eastern Natural Gas 10/24/95, Pike Natural Gas 10/24/95, Ohio Gas 10/3/95, CG&E 11/21/95, East Ohio Gas 12/12/95, DP&L 09/19/95, West Ohio Gas 10/17/95, National Gas & Oil 11/7/95, Columbia Gas of Ohio 12/19/95; that the companies and the auditors shall observe the requirement set forth herein. (6 pgs.) |
|