02-2418-EL-BNRFIRST ENERGY CORP/CITY OF MENTOR IN LAKE COUNTY, OHIO09/18/2002 
02-2552-EL-BNRCINCINNATI GAS & ELECTRIC COMPANY10/04/2002 
02-2553-EL-BNRCINCINNATI GAS & ELECTRIC COMPANY10/04/2002 
02-3127-EL-BNRMCCOMB-CENTRAL-GAY 138KV LINE RELOCATION11/26/2002 
02-3339-EL-BNRFIRSTENERGY CORP./EMILY-FOX PROJECT12/23/2002 
03-0256-EL-BNRAMERICAN ELECTRIC POWER/SOUTH PEMBERVILLE-FREMONT 138kV/SANDUSKY COUNTY01/29/2003 
03-0935-EL-BNRAMERICAN ELECTRIC POWER COMPANY04/07/2003 
04-0733-EL-BNRCINCINNATI GAS & ELECTRIC COMPANY05/13/2004 
05-0845-EL-BNRMONTGOMERY ROAD 138KV TRANSMISSION LINE RELOCATION PROJECT/CINERGY CORP.07/01/2005 
06-1252-EL-BNRAMERICAN TRANSMISSION SYSTEMS, INC./RICHLAND-ROBINSON PARK/US 24 & CARPENTER ROAD10/13/2006 
06-1488-EL-BNRAEP/COLUMBUS SOUTHERN POWER / BIXBY-MARION LSII 138KV LINE12/20/2006 
07-0146-EL-BNRDUKE ENERGY/PIERCE SUBSTATION EXPANSION PROJECT02/12/2007 
07-0627-EL-BNRCOLUMBUS SOUTHERN POWER/ CONSTRUCTION NOTICE FOR THE HYATT-GENOA 138 KV TEMPORARY LINE RELOCATION05/23/2007 
07-0925-EL-BNRAMERICAN TRANSMISSION SYSTEMS INC / ANGOLA MIDWAY 138KV TRANSMISSION LINE RELOCATION FOR I 475 SALISBURY ROAD/DUSSEL DRIVE INTERCHANGE IMPROVEMENTS08/16/2007 
07-1259-EL-BNRAMERICAN TRANSMISSION SYSTEMS, INC. (FOWLES GROUP 138 KV TRANSMISSION LINE RELOCATION NEAR EASTLAND AND SHELDON ROADS)12/10/2007 
07-1269-EL-BNRDUKE ENERGY OHIO/MONTGOMERY ROAD12/17/2007 
07-1271-EL-BNRDUKE ENERGY OHIO/TODHUNTER TO AK STEEL12/17/2007 
09-0111-EL-BNRAMERCIAN TRANSMISSION SYSTEMS INC/ EMILY-FOX 138 KV TRANSMISSION LINE RELOCATION02/17/2009 
11-1117-EL-BNRDUKE ENERGY OHIO03/01/2011 
11-5562-EL-BNRPoston-Ross 138k V Line (Reconductor/Rebuild Project Section 2)10/28/2011 
12-1052-EL-BNRCorridor Station Expansion03/22/2012 
12-1847-EL-BNRNorth Proctorville Station Expansion06/15/2012 
12-2112-EL-BNRWAVERLY ADAMS SEAMAN 138 kV TAP WARE ROAD STATION PROJECT07/18/2012 
12-2208-EL-BNRHANNA-WEST RAVENNA #1 & #2 138 KV DOUBLE CIRCUIT TRANSMISSION LINE RECONDUCTOR PROJECT08/01/2012 
12-2453-EL-BNRREPUBLIC STEEL INC 138 KV TRANSMISSION LINE09/05/2012 
12-2481-EL-BNRWEST LANCASTER-BIXBY 138 kV LINE RECONDUCTOR/REBUILD PROJECT09/10/2012 
12-2639-EL-BNRIRWIN SIMPSON/SNIDER ROAD WIDENING TRANSMISSION LINE RELOCATION09/28/2012 
12-2781-EL-BNRAMERICAN TRANSMISSION SYSTEMS INCORPORATED10/24/2012 
12-3301-EL-BNRAVON CRESTWOOD Q1 138 kV RECONDUCTORING PROJECT12/27/2012 
13-0027-EL-BNRMELDAHL DAM TRANSMISSION TAP LINE01/03/2013 
13-0554-EL-BNRPOSTON ELLIOTT 138KV RECONDUCTOR REBUILD PROJECT02/28/2013 
13-0669-EL-BNRAEP OHIO/WAGENHALS WEST CANTON03/14/2013 
13-1011-EL-BNRWEST BELLAIRE BRUES 138 KV LINE04/29/2013 
13-1018-EL-BNRWADSWORTH MUNI SILVERCREST WEST AKRON04/24/2013 
13-1033-EL-BNRDUKE ENERGY WEST END SUBSTATION RELOCATION PROJECT04/25/2013 
13-1158-EL-BNRWEST LANCASTER BIXBY 138 KV LINE RECONDUCTOR/REBUILD PROJECT PHASE 205/10/2013 
13-1243-EL-BNRAMERICAN TRANSMISSION SYSTEMS INC ALLEN JUNCTION SUBSTATION EXPANSION PROJECT05/23/2013 
13-1533-EL-BNRAEP TRANSCO06/28/2013 
13-1611-EL-BNRBABB EAST AKRON 138kV TRANSMISSION LINE RELOCATION FOR SEIBERLING STREET RECONSTRUCTION PROJECT07/11/2013 
13-1706-EL-BNRNORTH FINDLAY STATION EXPANSION08/16/2013 
13-1707-EL-BNRFINDLAY CENTER STATION EXPANSION08/16/2013 
13-1797-EL-BNRBAYSHORE SUBSTATION PROJECT08/16/2013 
13-1835-EL-BNRTANGY SUBSTATION EXPANSION 08/23/2013 
13-1934-EL-BNRMASURY SHENANGO RECONDUCTORING PROJECT09/16/2013 
13-2234-EL-BNRAngola-Eber-Vulcan 138 kV Transmission Line Relocation for Dorr Street Expansion Project12/02/2013 
13-2350-EL-BNRBeaver to Brownhelm Junction 345kV Transmission Line Temporary Transmission Line Extension Project12/05/2013 
14-0024-EL-BNRAEP OHIO TRANSMISSION COMPANY01/08/2014 
14-0099-EL-BNRAVON-BEAVER #1 & #2 345 kV TRANSMISSION LINE STRUCTURE REPLACEMENT FOR STATE ROUTE 2 BRIDGE CONSTRUCTION01/17/2014 
14-0108-EL-BNRCloverdale-Harmon #2 69 kV Transmission Line Construction Project02/06/2014 
14-0132-EL-BNRAmerican Transmissions Inc/Boardman – Sammis 138 kV Loop Transmission Line Loop to Nevada Substation 02/04/2014 
14-0267-EL-BNRBluebell-Niles 138 kV Transmission Line Loop To Berlin Lake Substation03/10/2014 
14-0560-EL-BNRCLARK SUBSTATION EXPANSION04/07/2014 
14-0930-EL-BNRBrookside-Howard 138 kV Transmission Line Reconductoring Project06/05/2014 
14-1085-EL-BNRAmerican Transmission Systems, Incorporated/Avon-Fowles Q1 and Q3 138 kV Transmission Lines Dual Tap to Bentley Substation Project06/18/2014 
14-1086-EL-BNRBarberton-West Akron 138 kV Transmission Line Reconductoring Project06/24/2014 
14-1177-EL-BNRLemoyne Substation Expansion07/09/2014 
14-1399-EL-BNRSouth Canton 345-kV Transformer Lead Transmission Line Reconductoring Project08/22/2014 
14-1405-EL-BNRLeroy Center Substation Transmission Lines Reconfiguration Project09/22/2014 
14-1422-EL-BNRWadsworth Muni Silvercrest-West Akron 138 kV Transmission Line By-Pass at Pine Sub09/09/2014 
14-1512-EL-BNRLake Shore SVC 138 kV Transmission Line Project 10/27/2014 
14-1547-EL-BNRHazelton 138 kV Transmission Line Tap Project09/11/2014 
14-1772-EL-BNRNiles-Niles 138 kV Transmission Line Project11/10/2014 
15-0054-EL-BNRJuniper-Jennings & Juniper-Newburgh 138 kV Underground Reconductor Project01/23/2015 
15-0283-EL-BNRAvon-Crestwood Q-3 138 kV Reconductor Project02/11/2015 
15-0288-EL-BNRAvon-Beaver No1 and No2 345kV Transmission Line Extensions to Lake Avenue Substation03/31/2015 
15-1446-EL-BNR Duke Energy Ohio /Fields Ertel Relocation 138,000 (138 kV) Electric Transmission Line Project.08/18/2015 
15-1574-EL-BNRWest Milton Substation Expansion09/09/2015 
15-1713-EL-BNRChrysler-Dowling 138 kV Transmission Line Relocation for Roachton Road Roundabout10/19/2015 
15-1760-EL-BNRJackman-Westgate 138 kV Transmission Line Relocation Project10/26/2015 
15-1819-EL-BNRUNITED STATES STEEL CORPORATION CUSTOMER-SPECIFIC 138-kV TRANSMISSION LINE10/27/2015 
15-1962-EL-BNRBluebell-Canton Central 138 kV Transmission Line Reconductor Project11/25/2015 
16-0280-EL-BNRInland Substation Expansion Project02/03/2016 
16-0297-EL-BNRAvon Lake Substation Expansion Project 02/08/2016 
16-0509-EL-BNRPidgeon-Sammis 138 kV Transmission LineTap to Guilford Mod Sub Project03/02/2016 
16-1258-EL-BNRFlag City 138kV Transmission Line Project08/19/2016 
16-1509-EL-BNRPhilo-Canton 138kV Transmission Line Relocation Project06/30/2016 
16-1532-EL-BNRBritton-Davidson 138kV Transmission Line Project09/23/2016 
16-1667-EL-BNRNorth Proctorville Expansion Project08/08/2016 
16-1777-EL-BNRBolton T-Line Cut-In 12/13/2016 
16-1930-EL-BNRLondon-Tangy 138 kV Transmission Line Tap to National Substation Project09/26/2016 
16-2122-EL-BNRDublin-Davidson 138 kV Transmission Line Extension10/26/2016 
16-2211-EL-BNRSOUTH CANTON-WEST CANTON 138KV TRANSMISSION LINE EXTENSION11/16/2016 
16-2212-EL-BNR138 kV Transmission Line Extensions to Holloway Substation Structure Replacement Project11/17/2016 
16-2312-EL-BNRDelta-Wauseon 138 kV Transmission Line Structure Replacement for Gerald Grain Project 12/05/2016 
16-2393-EL-BNRTrent-Delaware 138kV Transmission Line Extension12/19/2016 
17-0367-EL-BNRLevis Park-Midway 138 kV Transmission Line Structure Relocation and Replacement Project02/16/2017 
17-1098-EL-BNRWillow Island – Mill Creek 138kV Transmission Line Extension Project05/08/2017 
17-1151-EL-BNREmily-Fox Q-14 138 kV Transmission Line Relocation Project05/02/2017 
17-1211-EL-BNRGlencoe Station Expansion Project Part II07/27/2017 
17-1240-EL-BNRDP&L MIDDLEBORO METERING POINT RELOCATION PROJECT05/16/2017 
17-1288-EL-BNRLondon-Tangy 138 kV Transmission Line Relocation and Tangy Substation Expansion Project 05/25/2017 
17-1352-EL-BNREast Broad Street-Kirk 138kV Transmission Line Extension Project09/15/2017 
17-1395-EL-BNRChamberlin-Hudson Muni East 138kV Transmission Line Structure Addition Project06/14/2017 
17-1666-EL-BNRBEAVER-DAVIS BESSIE 345KV TRANSMISSON LINE STRUCTURE ADDITION07/31/2017 
17-1674-EL-BNRCHRYSLER-DOWLING 138KV TRANSMISSION LINE TAP EXTENSION TO NEW FIRST SOLAR SUBSTATION PROJECT07/26/2017 
17-1783-EL-BNRFormer Burger 138 kV Transmission Lines Structure Addition Project08/15/2017 
17-1808-EL-BNRPhilo-Howard 138kV Transmission Line Project08/18/2017 
17-1904-EL-BNRWest Fremont Substation Expansion Project09/01/2017 
17-1954-EL-BNRBrookside-Longview West 138 kV Transmission Line Temporary Bypass Project09/08/2017 
17-1997-EL-BNRLongview-Nottingham 138 kV Transmission Line Structure Replacement Project 09/18/2017 
17-2013-EL-BNRJuniper-Newburgh, Juniper-Jennings, and Juniper-Pleasant Valley 138 kV Transmission Lines Structure Replacement Project09/22/2017 
17-2015-EL-BNRHarper-West Akron 138kV & West Akron-Pleasant Valley East 138kV T-Line Structure Replacement Project09/29/2017 
17-2076-EL-BNRBuckley Road-Fostoria Central 138kV Transmission Line Extension Project10/13/2017 
17-2077-EL-BNRSoftail Switch 138kV Transmission Line Extension Project10/13/2017 
17-2312-EL-BNRChrysler-Dowling 138 kV Transmission Line Tap Final Span Installation to New First Solar Substation Project11/07/2017 
17-2473-EL-BNRAetna (West Akron) 138kV & Babb-West Akron 138kV T-Line Structure Replacement Project12/14/2017 
18-0100-EL-BNRClark-Urbana 138kV Loop Eastern Connection Centerline Adjustment to Broadview Substation Project01/17/2018 
18-0202-EL-BNRBabbitt Extension 138kV Project02/01/2018 
18-0253-EL-BNRPoston-Lick 138 kV Transmission Line Extension Project02/21/2018 
18-0256-EL-BNREast Lima-Marysville 345kV Transmission Line Extension Project02/09/2018 
18-0683-EL-BNRThe City of New Albany's Beech Road Duct Bank Project04/23/2018 
18-0694-EL-BNR138kV Hutchings to College Corner Tower Relocation Project04/18/2018 
18-0735-EL-BNRTangy Substation Expansion Project04/20/2018 
18-0848-EL-BNRSterling Station Line Extension Project05/09/2018 
18-0864-EL-BNRCardington-Galion 138 kV Transmission Line Raising Project05/22/2018 
18-0879-EL-BNRNorth Medina-West Medina 138 kV Transmission Line Structure Replacement Project05/21/2018 
18-0926-EL-BNRDobbins-Toronto 138 kV Transmission Line Structure Replacement Project05/29/2018 
18-1047-EL-BNRSeville-Star 138 kV Transmission Line Structure Replacement Project06/22/2018 
18-1059-EL-BNRMt. Vernon-South Kenton Structure Raise Project06/28/2018 
18-1333-EL-BNRSouthwest Lima 345kV Transmission Line Extension Project08/27/2018 
18-1386-EL-BNRHyatt-Genoa 138kV Structure Relocation Project09/07/2018 
18-1396-EL-BNRBrookside-Leaside 138kV T-Line Switch Structure Addition Project12/24/2018 
18-1401-EL-BNRDelta-Wauseon 138 kV Transmission Line Tap to Metal X Project (ATSI)09/14/2018 
18-1402-EL-BNRDelta-Wauseon 138 kV Transmission Line Tap to Metal X Project (TE) 09/14/2018 
18-1465-EL-BNRMorse Road Station Expansion Project09/26/2018 
18-1495-EL-BNRDuke Energy Ohio, Inc.10/05/2018 
18-1523-EL-BNRDuke Energy Ohio, Inc.11/20/2018 
18-1534-EL-BNRConesville – Kirk 138 kV Transmission Line Extension Project10/17/2018 
18-1559-EL-BNRHyatt Station 138 kV Transmission Line Extension Project10/17/2018 
18-1571-EL-BNRDuke Energy Ohio, Inc. Columbia Substation Project11/09/2018 
18-1572-EL-BNRDuke Energy Ohio, Inc. Ebenezer Substation Project10/24/2018 
18-1593-EL-BNRDuke Energy Ohio, Mill Creek Remediation Relocation10/24/2018 
18-1594-EL-BNRAshtabula 138kV Substation Expansion Project10/23/2018 
18-1650-EL-BNRMorgan 1689 Separation Project11/01/2018 
18-1661-EL-BNR138 kV Transmission Line Relocations at Richland Substation Project11/13/2018 
18-1710-EL-BNRMuskingum River Re-conductor Project11/20/2018 
18-1799-EL-BNRDevola-Gorsuch 138kV Transmission Line Extension Project12/14/2018 
19-0161-EL-BNREast Lima-Marysville 345kV Transmission Line Extension Project II01/22/2019 
19-0398-EL-BNRDuke Energy Ohio, Inc / Blue Ash Road Project02/08/2019 
19-0448-EL-BNRCentral-East Lima Pole Installation03/15/2019 
19-0580-EL-BNRAshtabula Substation 138kV T-Lines Relocation03/12/2019 
19-0798-EL-BNRWest Millersport Station Expansion Project 04/09/2019 
19-0799-EL-BNRBixby Station Expansion Project04/09/2019 
19-0802-EL-BNRLordstown-Sammis 345kV Loop to Wellsville Substation06/05/2019 
19-0845-EL-BNREast Lima Station Expansion Project #204/09/2019 
19-0865-EL-BNRWagenhals-West Canton 138kV Transmission Line Project”.04/22/2019 
19-0955-EL-BNRBixby-Shannon 138kV Transmission Line Pole Installation Project04/22/2019 
19-0956-EL-BNRWillow Island-Mill Creek 138kV Transmission Line Extension Project04/22/2019 
19-0960-EL-BNRHyatt 345kV Station Expansion Project04/22/2019 
19-0971-EL-BNRAdjustment #2 to Heppner-Rhodes 138 KV Transmission Line Rebuild Project05/14/2019 
19-1114-EL-BNRDuke Energy Ohio, Inc., Beckjord Structure Relocation05/22/2019 
19-1142-EL-BNRThe Dayton Power and Light Company06/19/2019 
19-1273-EL-BNRKirk-Jug Street 345 kV Pole Installation Project06/06/2019 
19-1277-EL-BNRDuke Energy Ohio, Inc.05/31/2019 
19-1345-EL-BNRDayton Power & Light - Bath Substation Expansion08/16/2019 
19-1346-EL-BNRDayton Power & Light - West Milton Substation Expansion08/16/2019 
19-1347-EL-BNRDayton Power & Light - Miami to New Carlisle 138kV Tap11/01/2019 
19-1383-EL-BNRNorth Proctorville Station Expansion Project06/26/2019 
19-1384-EL-BNRDuke Energy Ohio, Inc/ St. Annes Avenue Towner Replacement06/28/2019 
19-1388-EL-BNRLallendorf-Monroe 345 kV Transmission Line Reconductor07/03/2019 
19-1423-EL-BNRAEP Ohio Transmission, Inc.07/15/2019 
19-1453-EL-BNRGalion-Roberts South 138kV Line Switch Replacement07/22/2019 
19-1469-EL-BNRIn the Matter of the Application of Duke Energy Ohio, Inc. for the Zimmer Substation Separation Project07/25/2019 
19-1476-EL-BNRAEP Ohio Transmission Company, Inc. 07/23/2019 
19-1551-EL-BNROttawa-W Fremont #2 138 kV & Groton-W Fremont 138 kV T-Lines Structure Addition Project08/09/2019 
19-1618-EL-BNREvergreen-Highland #3 138kV Switch Replacement08/28/2019 
19-1636-EL-BNROhio Power Company09/03/2019 
19-1775-EL-BNRAEP Ohio Transmission Company, Inc. 09/12/2019 
19-1830-EL-BNRFostoria-East Lima 138kV Transmission Line Prop Pole Installation Project10/10/2019 
19-1919-EL-BNRDuke Energy Ohio, Inc.10/21/2019 
19-2011-EL-BNRMayfield-Eastlake Q-3 & Q-4 138 kV Transmission Lines Tap to Nathan Substation Project11/18/2019 
19-2034-EL-BNRBuell 138 kV Extension Structure Change Project12/06/2019 
19-2134-EL-BNRJuniper-Pleasant Valley Q1 & Q2 138kV Transmission Lines Structure Replacement Project12/10/2019 
19-2138-EL-BNRCloverdale-Torrey 138 kV Transmission Line Tap to Legend Mod Substation Project12/23/2019 
20-0006-EL-BNRDevola-Gorsuch 138 kV Transmission Line Project #201/09/2020 
20-0008-EL-BNRIn the Matter of the Application of Duke Energy Ohio, Inc., for a Construction Notice for the 13803 Line GLT Phase 3 Project01/03/2020 
20-0031-EL-BNRDayton Power and Light - Hutchings to Sugarcreek 138kV Tap01/21/2020 
20-0064-EL-BNRIn the Matter of the Duke Energy Ohio, Inc. Mitchell Ave. Pole Replacement Project01/16/2020 
20-0135-EL-BNROttawa-West Fremont 138 kV Switch Replacement Project08/04/2020 
20-0262-EL-BNRPierce Substation Expansion Project02/07/2020 
20-0347-EL-BNRIn the Matter of the Application of Duke Energy Ohio, Inc.- Maineville08/13/2020 
20-0365-EL-BNRShawtown Switch-Hancock Wood Co-Op 138 kV Transmission Line Project02/18/2020 
20-0377-EL-BNRVine-City of Columbus West 138 kV Pole Replacement Project03/03/2020 
20-0598-EL-BNRCrissinger-Tangy 138 kV Transmission Line Switch Replacement Project03/25/2020 
20-0614-EL-BNRHillcrest Solar I, LLC03/18/2020 
20-0668-EL-BNRBeatty Station Expansion Project04/15/2020 
20-0709-EL-BNRConesville Transmission Station Expansion Project 04/06/2020 
20-0710-EL-BNREast Lima-Maddox Creek 345 kV Transmission Line Project04/06/2020 
20-0787-EL-BNRKammer-Dumont 765 kV Transmission Line Cut In05/28/2020 
20-0845-EL-BNRDayton Power and Light - Millcreek 138kV Extension04/20/2020 
20-0938-EL-BNRIn the Matter of the Duke Energy Ohio, Inc. Hillcrest Solar Project04/27/2020 
20-0955-EL-BNRPhilo-Torrey 138kV Transmission Line05/06/2020 
20-1075-EL-BNRJuniper-Jennings 138 kV Q-15 and Juniper-Newburgh 138 kV Q-18 Transmission Lines Structure Addition Project06/15/2020 
20-1136-EL-BNRBell Ridge 138kV Switch Project06/18/2020 
20-1142-EL-BNRMorse Road - Genoa 138 kV Line (Structures 1-4) 07/16/2020 
20-1183-EL-BNRHyatt - Genoa 138 kV Line (Structures 71-72) 07/02/2020 
20-1275-EL-BNRConstruction Notice for the Waverly-Lick 138kV Pole Replacement 07/15/2020 
20-1351-EL-BNRCity of Hamilton, Substation 5, New Pole Placement08/04/2020 
20-1353-EL-BNRApple Valley 138 kV Switch Project08/17/2020 
20-1373-EL-BNRLevis Park-Midway 138 kV Transmission Line Switch Replacement Project08/17/2020 
20-1414-EL-BNRHarrison Station Expansion Project09/03/2020 
20-1436-EL-BNRDefiance SW (Richland) 138 kV Transmission Line Relocation Project08/27/2020 
20-1449-EL-BNRMarysville – Peoria 345kV Transmission Line Project09/29/2020 
20-1457-EL-BNRDixie Substation Expansion Project09/09/2020 
20-1473-EL-BNRWakatomika 138kV Switch Project09/15/2020 
20-1474-EL-BNRLicking Co-Op Extension – Bladensburg 138kV Transmission Line Project09/15/2020 
20-1487-EL-BNRIn the Matter of the Application of Duke Energy Ohio, Inc.09/17/2020 
20-1516-EL-BNRHannibal-Ormet North 138 kV Transmission Line Project10/01/2020 
20-1551-EL-BNRClark-East Springfield 138 kV Transmission Line Switch Replacement Project09/29/2020 
20-1555-EL-BNRBabb-Evans 138 kV Transmission Line Loop to Aetna Substation Project09/25/2020 
20-1600-EL-BNRDefiance SW (Richland) 138 kV Transmission Line Switch Replacement Project10/15/2020 
20-1608-EL-BNRSporn-Kyger Creek 345 kV Pole Installation Project10/30/2020 
20-1609-EL-BNRBethel-Sawmill 138 kV Pole Installation Project10/30/2020 
20-1611-EL-BNRIn the Matter of the Duke Energy Ohio, Inc, 2381 GLT project 11/06/2020 
20-1647-EL-BNRJuniper-Newburgh/Juniper-Jennings & Juniper-Pleasant Valley Q1 & Q2 138 kV Transmission Line Structure Replacement Project10/29/2020 
20-1654-EL-BNRAngola-Midway 138 kV Transmission Line Relocation Project11/02/2020 
20-1663-EL-BNRLockbourne – South Central Power 138 kV Bus Tie Project11/16/2020 
20-1710-EL-BNRChamberlin Substation 138kV Strain Bus Structure Addition Project11/23/2020 
20-1741-EL-BNRIn the Matter of the Construction Notice Application for the Angelina Solar I, LLC Transmission Interconnect11/25/2020 
20-1747-EL-BNRHarper-West Akron 138 kV Transmission Line Switch Replacement Project12/09/2020 
21-0151-EL-BNRDayton Power and Light - Sugarcreek 138kV Reactor Expansion 03/08/2021 
21-0179-EL-BNRAnguin Extension No. 4 138 kV Transmission Line03/01/2021 
21-0194-EL-BNRBELLARD SUBSTATION PROJECT03/04/2021 
21-0250-EL-BNRDuke Energy Ohio, Inc. Miami Fort Generation Separation04/16/2021 
21-0251-EL-BNRDuke Energy Ohio, Inc. 1782 GLT Project04/09/2021 
21-0266-EL-BNRHarmar Hill 138 kV Switch Install04/26/2021 
21-0348-EL-BNRDuke Energy Ohio, Inc. Half Acre Substation04/07/2021 
21-0489-EL-BNRDavidson-Dublin 138 kV Underground Relocation Project05/27/2021 
21-0591-EL-BNRWAVERLY-LICK 138-kV TRANSMISSION LINE RELOCATION AND LICK STATION EXPANSION05/19/2021 
21-0606-EL-BNRSolida 138 kV Switch Project06/22/2021 
21-0613-EL-BNRBuckeye Co-Op Extension-Fayette 138 kV Line Rebuild Project06/22/2021 
21-0678-EL-BNRSalerno 138 kV Line Extension Project06/09/2021 
21-0731-EL-BNRDuke Energy Ohio, Inc. / 5781 Emergent.07/16/2021 
21-0795-EL-BNRIn the Matter of Duke Energy Ohio, Inc. 5781 GLT Project07/30/2021 
21-0819-EL-BNRAdjustment to Viking 138kV Switch Project07/26/2021 
21-0893-EL-BNRSouthwest Lima-West Moulton and St Mary’s-West Moulton 138 kV Transmission Line Adjustment Project10/01/2021 
21-0899-EL-BNRFostoria Central Station Expansion09/01/2021 
21-0927-EL-BNRDuke Energy Ohio, Inc. Stuart Substation Expansion Project.09/17/2021 
21-0974-EL-BNRWest Lancaster-Bixby 138 kV Extension 09/21/2021 
21-0975-EL-BNRSifford-Ruble 138 kV Tie Lines Project09/21/2021 
21-0976-EL-BNRPhilo-Howard 138 kV Mid-Span Structure Project09/21/2021 
21-0979-EL-BNRFostoria – East Lima 138 kV Transmission Line Tie-Ins to North Woodcock Station Project09/21/2021 
21-0985-EL-BNRDuke Energy Ohio, Inc.11/05/2021 
21-1033-EL-BNRDuke Energy Ohio, Inc.10/26/2021 
21-1043-EL-BNRWillowbrook Solar I, LLC 138kV Overhead Transmission Gen-Tie Line10/08/2021 
21-1057-EL-BNRHartman Farms 138 kV Extension No. 5 and No. 6 Project10/27/2021 
21-1085-EL-BNRHeppner-Lick 138 kV Transmission Line Adjustment Project11/22/2021 
21-1086-EL-BNRLinworth 138 kV Extension Relocation Project11/05/2021 
21-1111-EL-BNRBiers Run – Circleville 138kV Line Cut-In Project12/14/2021 
21-1113-EL-BNRCannelsville-Guernsey-Muskingum Co-Op 138 kV Transmission Line Rebuild Project11/22/2021 
21-1168-EL-BNRCartwright 138 kV Switch Project11/29/2021 
21-1170-EL-BNRBuckeye Co-Op Extension-Addison 138 kV Transmission Line Rebuild Project12/10/2021 
21-1178-EL-BNRGreenfield-Lakeview 138 kV Transmission Line Reconductor and Rebuild Project12/03/2021 
21-1227-EL-BNRAllen Junction-Westgate 138 kV Transmission Line Relocation Project12/08/2021 
22-0011-EL-BNRDuke Energy Ohio, Inc01/10/2022 
22-0012-EL-BNRDuke Energy Ohio, Inc01/10/2022 
22-0039-EL-BNRAngola-Midway 138 kV Transmission Line Relocation at Monclova Road Project02/22/2022 
22-0090-EL-BNRBeatty-Canal Street 138 kV Cut-In Project02/11/2022 
22-0153-EL-BNRSifford-Ruble 138 kV Tie Lines Project03/02/2022 
22-0155-EL-BNRWest Lancaster-Bixby 138 kV Extension 03/02/2022 
22-0173-EL-BNRBlendon Extension 138 kV Pole Replacement Project03/04/2022 
22-0175-EL-BNRWest Moulton-Amsterdam 138 kV Transmission Line Project03/29/2022 
22-0403-EL-BNRBuckeye Co-Op Extension-Fayette 138 kV Pole Installation Project05/13/2022 
22-0445-EL-BNRDuke Energy Ohio, Inc. 04/22/2022 
22-0451-EL-BNRDuke Energy Ohio, Inc.05/05/2022 
22-0468-EL-BNRDuke Energy Ohio, Inc.05/06/2022 
22-0512-EL-BNRCyprus 138 kV Extension Adjustment Project05/11/2022 
22-0515-EL-BNRDuke Energy Ohio, Inc.07/22/2022 
22-0553-EL-BNRDuke Energy Ohio, Inc.07/15/2022 
22-0563-EL-BNRCanton Central Station Expansion and Line Adjustment Project06/28/2022 
22-0564-EL-BNRLima – Fort Wayne 138 kV Transmission Tie-Lines into Gomer Station Project06/02/2022 
22-0567-EL-BNRMarion Road-Mound Street 138 kV Transmission Line Underground Project – East Fulton Street Adjustment 06/03/2022 
22-0574-EL-BNREast Amsterdam-Carroll Co-Op 138 kV Line08/08/2022 
22-0577-EL-BNRDelano Station Expansion 07/21/2022 
22-0579-EL-BNRDelano-Salt City Solar 138 kV Line Project06/21/2022 
22-0641-EL-BNRNottingham-Nottingham Solar 138 kV09/21/2022 
22-0648-EL-BNRAnguin Extension No.4 Transmission Line Project07/11/2022 
22-0677-EL-BNRBroadview-Clark 138 kV Transmission Line Structure Replacement Project 07/12/2022 
22-0725-EL-BNRFairfield 43 T-Pole Replacement09/08/2022 
22-0727-EL-BNRFinneytown 44 T-Pole Relocation09/09/2022 
22-0746-EL-BNRDuke Energy Ohio, Inc.08/08/2022 
22-0779-EL-BNREast Lima 345kV Transmission Line Cut-In Project08/17/2022 
22-0801-EL-BNRDuke Energy Ohio, Inc. 09/02/2022 
22-0831-EL-BNRDuke Energy Ohio, Inc.09/02/2022 
22-0832-EL-BNRPolaris – Westar 138kV Line Upgrades09/09/2022 
22-0943-EL-BNRIn the Matter of Duke Energy Ohio, Inc.10/13/2022 
22-0954-EL-BNRBeatty – Greene IPP 345kV Cut-in Project10/24/2022 
22-1009-EL-BNRBiers Run – Circleville 138kV Cut-in (Westfall Station) Project11/01/2022 
22-1027-EL-BNROhio Central-Fostoria 345 kV Transmission Line Adjustment Project 11/04/2022 
22-1028-EL-BNRHoward – Fostoria 138 kV Mid-Span Structure Project11/04/2022 
22-1086-EL-BNRSouth Coshocton – Wooster 138 kV Transmission Line Cut-Ins and Salt Creek Switch Project12/08/2022 
22-1125-EL-BNREast Akron-Evans 138 kV Transmission Line Switches Installation Project12/06/2022 
22-1134-EL-BNRFostoria-East Lima 138 kV Hard Tap Project12/08/2022 
23-0011-EL-BNRBeatty-Canal Street 138 kV Transmission Line Re-Termination (White Road) Project01/31/2023 
23-0012-EL-BNRFlatlick 765 kV Station Expansion Project01/18/2023 
23-0016-EL-BNRDuke Energy Ohio, Inc.01/13/2023 
23-0017-EL-BNRBroadview-Tangy 138 KV Transmission Line Loop to Finley Substation03/15/2023 
23-0030-EL-BNRWestfall – South Central Power 138kV Tie Line Project01/12/2023 
23-0042-EL-BNROhio Power Company - Adkins Station Expansion Project03/09/2023 
23-0064-EL-BNRHarding-Jennings 138 kV Transmission Line Structure Replacement01/27/2023 
23-0076-EL-BNRConesville - Slate 138 kV Transmission Line Project01/24/2023 
23-0094-EL-BNRDuke Energy Ohio, Inc.02/10/2023 
23-0099-EL-BNRMarysville-Cadence Solar 345 kV Transmission Line11/06/2023 
23-0122-EL-BNRFiddlestix Switch & Poston Ross 138-kV Cut-In Project02/13/2023 
23-0153-EL-BNRKileville-Shire 138 kV Tie Lines Project03/03/2023 
23-0167-EL-BNRNorth Intertie Station Expansion Project03/06/2023 
23-0188-EL-BNRDuke Energy Ohio, Inc.04/27/2023 
23-0203-EL-BNRLongview-Ontario 138 kV Transmission Line Switch Replacement Project03/17/2023 
23-0306-EL-BNROPSB Dimmick Substation08/15/2023 
23-0308-EL-BNROPSB Columbia and Davis Road Roundabout Relocation06/30/2023 
23-0343-EL-BNRAnguin 138 kV Extension No. 1 Transmission Line Project04/12/2023 
23-0483-EL-BNRHighland-Magellan No. 1 138 kV Structure Relocation Project05/16/2023 
23-0538-EL-BNRKammer – Dumont 765kV Transmission Line Raise05/31/2023 
23-0558-EL-BNRF7481 Phase 206/15/2023 
23-0564-EL-BNRHillsboro-Millbrook Park 138 kV Line Adjustment 2 Project05/19/2023 
23-0569-EL-BNRHedding Road-Morrow Co-op 138 kV Transmission Line Relocation Project06/01/2023 
23-0576-EL-BNRSouth Point – Portsmouth 138-kV Transmission Line Tie-in Project05/23/2023 
23-0584-EL-BNRSpickard-Dodson Creek Solar 138 kV Generation Tie Line Project07/20/2023 
23-0611-EL-BNRSidney-Franklin 138kV Transmission Line Adjustment Project- AES Ohio06/09/2023 
23-0632-EL-BNRAnguin - Babbitt 138 kV Transmission Line Adjustment Project06/08/2023 
23-0646-EL-BNRBuckeye Co-Op Extension Fayette 138kV Pole Installation Adjustment Project06/07/2023 
23-0694-EL-BNRSpeidel-Barnesville 138 kV Cut-in to Pumpkin Station Project06/28/2023 
23-0705-EL-BNRHartman Farms 138 kV Extension No. 6 Transmission Line Project (Phase 2)06/29/2023 
23-0785-EL-BNRBeaver-Black River 138 kV Transmission Line Tap to Serve AMPT Project08/22/2023 
23-0795-EL-BNRCosgray-Rivendell No. 1 and No. 2 345 kV Tie Lines Project08/01/2023 
23-0812-EL-BNRBrookside-Henrietta 138 kV Transmission Line Switch Replacement Project08/14/2023 
23-0829-EL-BNRBroadview – Tangy 138 kV Transmission Line Switch Replacement Project09/07/2023 
23-0851-EL-BNRE. Broad St. – Bexley 138 kV Transmission Line Cut-In Project09/19/2023 
23-0852-EL-BNRJug Street – Corridor 345 kV Transmission Line Cut-in to Badger Station Project09/13/2023 
23-0872-EL-BNRATSI’s Sammis Star 345kV Transmission Line and Sammis Wellsville 345kV Transmission Line Structure Replacement Project10/04/2023 
23-0886-EL-BNRChrysler-Maclean 138 kV Transmission Line Tap to First Solar PGT-4 Substation Project. 10/23/2023 
23-0919-EL-BNRHarrison Extension 138 kV Pole Replacement Project10/05/2023 
23-0920-EL-BNRThree Creeks 138 kV Switch Bypass Pole Project10/02/2023 
23-0937-EL-BNRAnguin 138 kV Extension No. 1 (Phase 2) Transmission Line Project10/13/2023 
23-0951-EL-BNRAmerican Transmission Systems, Incorporated London-Tangy 138 kV Transmission Line Tap Project11/06/2023 
23-0952-EL-BNRAmerican Transmission Systems, Incorporated London-Tangy 138 kV Transmission Line Tap Project12/01/2023 
23-0961-EL-BNRConesville-Corridor 345 kV Cut-in and Innovation-Mordor 138 kV Tie Lines #1 & #2 Project10/20/2023 
23-0965-EL-BNRLemoyne-Midway 138 kV Tranmission Line Structure Addition Project11/02/2023 
23-0970-EL-BNRKileville-Shire No. 3 and No. 4 138 kV Tie Lines Project10/20/2023 
23-0986-EL-BNRElk - Vinton 138kV Extension Project12/06/2023 
23-1021-EL-BNRWest Van Wert – Delphos Center 138kV Line Adjustment Project11/15/2023 
23-1046-EL-BNRBixby-Marion Road 138 kV Prop Pole Project11/17/2023 
23-1053-EL-BNRMount Perry 138 kV Extension Project12/06/2023 
23-1054-EL-BNRMount Perry 138 kV Switch Project12/06/2023 
23-1133-EL-BNRAnguin 138 kV Extension No. 5 Transmission Line Project12/13/2023 
24-0034-EL-BNRBeatty – Canal Street 138 kV (Beatty Road – White Road) Pole Installation Project01/18/2024 
24-0066-EL-BNRJerome-Rohan 138 kV Tie Lines Project02/05/2024 
24-0079-EL-BNRChamberlain-West Akron 138 kV Transmission Line Switch Replacement Project02/27/2024 
24-0082-EL-BNRMelmore-Tiffin Center 138 kV Transmission Line Replacement Project02/07/2024 
24-0091-EL-BNRCorridor-Morse 138 kV Pole Installation Project02/07/2024 
24-0131-EL-BNRMorse - Clinton 138 kV Pole Installation Project02/20/2024 
24-0152-EL-BNRBrie - Voltron 138 kV Transmission Line Project02/23/2024 
24-0173-EL-BNRNewcomerstown – South Coshocton 138 kV Transmission Line Structure Adjustment Project03/08/2024 
24-0334-EL-BNRLammer-Powell Creek Solar 138 kV Transmission Line and East Leipsic-Richland 138 kV Cut-in Project04/08/2024 
24-0433-EL-BNRSouth Coshocton – Wooster 138 kV Transmission Line Rebuild Project Phase 104/16/2024 
24-2384-EL-BNRSifford-Ruble 2A 138 kV Transmission Tie-Lines Project04/10/2024