12/13/2000 Letter of notification stating construction was completed 11/24/00 filed by T. Krauss on behalf of ATSI.
10/12/1999 ICN #0010 Response filed on behalf of FirstEnergy Corp. by G. Cunningham. (6 pgs.)
10/01/1999 ICN #0009 Preliminary general plant layout drawing Number #SK-WLC-S3219 filed on behalf of applicant by G. Cunningham.
09/22/1999 ICN #0008 Entry ordering that the applicants' motion for Staff to resume their review of the application filed in 99-540 and the notification filed in 99-736 is granted; that the applicants' motion to indefinitely suspend review of the application filed in 99-541 is granted until the Board specifically orders otherwise. (AE) (2 pgs.)
09/21/1999 ICN #0007 Corrected certificate of service filed on behalf of applicant by C. Schraff. (2 pgs.)
09/13/1999 ICN #0006 Corrected certificate of service filed on behalf of applicant by C. Schraff. (2 pgs.)
09/10/1999 Motion for Continuance and extension of time pursuant to Ohio Edison/West Lorain Comustion. file by C. Schraff (6pgs)
08/06/1999 ICN #0004 Entry ordering that FirstEnergy's request for Staff to suspend their review of the applications and notification is granted. (AE) (2 pgs.)
08/02/1999 ICN #0002 Investigation report approving the Letter of Notification, filed by L. Winget, PUCO staff. (1 pg.)
08/02/1999 ICN #0003 Motion for continuance and extension of time pursuant to OAC 4906-7-13 and memorandum in support filed on behalf of applicants by C. Schraff and M. Beiting. (4 pgs.)
08/02/1999 ICN #0005 Motion for continuance and extension of time pursuant to OAC 4906-7-13 and memorandum in support filed on behalf of applicants by C. Schraff and M. Beiting. (4 pgs.)
06/16/1999 ICN #0001 In the matter of the Letter of Notification of The Ohio Edison Company involving the construction of a 0.4 mile single circuit 345 kV transmission line from a proposed combustion turbine installation at the existing West Lorain Generation Plan, to the existing Beaver 345- 138 kV Substation. (16 pgs.)