DIS - Case Record for 95-0527-EL-BTX Skip to main content
      
      
CASE NUMBER: 95-0527-EL-BTX
CASE DESCRIPTION: TOLEDO EDISON/NORTH STAR STEEL
DOCUMENT SIGNED ON: 4/19/2024
DATE OF SERVICE: ________________________________________
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates.
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates
10/16/2000 ICN #0035 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.)
08/13/1996 Letter stating the construction line is complete filed on behalf of applicant by M. Kempic. (1 pg.)
02/05/1996 ICN #0033 Letter to K. Wissman, PUCO staff, regarding the final study performed in this case, filed on behalf of applicant by M. Kempic. (1 pg.)
01/04/1996 ICN #0032 Final Construction drawing concerning the above-stated siting project filed on behalf of applicant by M. Kempic. (1 pg.)
12/20/1995 ICN #0031 Letter to K, Wissman, PUCO staff, concerning the final study performed in this case, filed on behalf of applicant by M. Kempic. (1 pg.)
11/01/1995 ICN #0030 Cultural Resource Survey filed on behalf of applicant by M. Kempic. (5 pgs.)
10/25/1995 ICN #0029 Construction Storm Water Pollution Prevention Plan and a letter and the permit from the Ohio EPA in regards to coverage under Ohio EPA storm water construction general permit No. OHR103892, filed on behalf of applicant by M. Kempic. (36 pgs.)
10/24/1995 ICN #0028 Letter to Mr. Mark Kempic, Centerior Energy, stating that they may proceed with construction of the project depicted by the drawings submitted on October 19, 1995, filed by K. Wissman, PUCO staff. (1 pg.)
10/02/1995 Opinion, Order, and Certificate ordering that the stipulation of findings, conclusions, and recommendations is approved and that a certificate of environmental compatibi- lity and public need is hereby issued to Toledo Edison Com- pany for the construction, operation, and maintenance of the North Star Steel 345 kV transmission line using the preferred route in accordance with the conditions set forth in section V of this opinion.
09/15/1995 ICN #0026 Transcript filed for hearing held 9/6/95, (DB), 14 pgs., Submitted.
09/06/1995 ICN #0025 Joint stipulation of findings and recommendations filed on behalf of applicant by M. Kempic; North Star Steel by K. Betts; and the OPSB staff by M. Malone and G. Rocco. (15 pgs.)
09/06/1995 ICN #0024 Investigation report, site visit conducted 29 August, 1995, filed on behalf of the OPSB staff by R. Yerian. (3 pgs.)
08/31/1995 Transcript for hearing held 8/24/95, Delta, Ohio, (CG), (RB) (JB), 49 pgs. sub.
08/30/1995 ICN #0022 Transcript filed for hearing held 8/28/95, (RB), 37 pgs., Submitted.
08/30/1995 ICN #0022 Transcript filed for hearing held 8/28/95, (RB), 37 pgs., Submitted.
08/29/1995 Correspondence letter opposing transmission line filed by W. Saeger. (2 pgs.)
08/28/1995 Toledo Edison's Grand Trunk RailRoad Report filed by T. R. Krauss. (20 pgs.)
08/08/1995 ICN #0019 Staff Report Filed. (29 pgs.)
08/04/1995 Table 05-01 which was inadvertently omitted from Toledo Edison's Response to Ohio Power Siting Board Staff's combin- ed request for production of document and interrogatories filed by M. Kempic. (2 pgs.)
08/01/1995 ICN #0017 Response to Ohio Power Siting Board Staff's combined requests for production of documents and inter- rogatories, filed on behalf of applicant by M. Kempic. (66 pgs.)
07/27/1995 ICN #0016 Correspondence letter regarding the application, filed by Robert B. and Lois L. Falor. (1 pg.)
07/27/1995 ICN #0015 Correspondence letter regarding the application, filed by Mr. & Mrs. Roger Thierry, Ms. Janet Falor, and Jane A. Tierry. (1 pg.)
07/27/1995 ICN #0014 Correspondence regarding the application, filed by Ms. Randy J. Falor. (1 pg.)
07/27/1995 ICN #0013 Response letter to Ms. Randy J. Falor, filed on behalf of the OPSB staff. (1 pg.)
07/27/1995 ICN #0012 Response letter to Ms. Janet Falor, filed on behalf of the OPSB staff. (1 pg.)
07/27/1995 ICN #0011 Response letter to Mr. & Mrs. Roger Thierry, filed on behalf of the OPSB staff. (1 pg.)
07/25/1995 ICN #0009 Petition for leave to intervene filed on behalf of Shawn Ferguson by S. Ferguson. (4 pgs.)
07/21/1995 Petition for leave to intervene filed on behalf of North Star Steel Ohio by J. Barker. (5 pgs.)
07/12/1995 ICN #0007 Combined requests for production of documents and interrogatories filed on behalf of the OPSB staff by J. Jackson-Forbes. (21 pgs.)
07/07/1995 ICN #0006 Notice of appearance filed on behalf of the PUCO staff by J. Jackson-Forbes. (2 pgs.)
07/03/1995 ICN #0005 Proofs of publication filed on behalf of applicant by M. Kempic. (7 pgs.) (Fulton, Fayette, Lucas Counties)
06/14/1995 ICN #0004 Entry ordering that the effective date for filing of the application is June 19, 1995 and that a local public hearing be held on Thursday, August 24, 1995, at 7:15 p.m., at the Delta High School, 605 Taylor Street, Delta, Ohio, and the adjudicatory hearing will commence on August 28, 1995, at 10:00 a.m. at the Commission. (AE) (3 pgs.)
06/09/1995 ICN #0003 Proof of service filed on behalf of applicant by M. Regulinski. (3 pgs.)
06/01/1995 ICN #0002 Letter to Mr. Terrance G. Linnert, Esq. stating that the application has been certified as being complete in accordance with Ohio Administrative Code Rule 4906-5-05, filed by the OPSB staff. (2 pgs.)
05/31/1995 ICN #0001 In the matter of the application of The Toledo Edison Company for a certificate of environmental compati- bility and public need for The Toledo Edison Company - North Star Steel 345 kV Transmission Line Project. (264 pgs.)