05/28/1999 Amended Notice of Completion and Commercial Operation. Submitted by: J. Small. (3 pgs.)
05/26/1999 ICN #0022 Notice of completion and commercial operations filed on behalf of applicant by J. Small. (2 pgs.)
06/10/1996 ICN #0021 Letter to Mr. Phillip E. Meier stating that the engineering drawings for the Belleville 138 project sub- mitted on May 6, 1996, have been reviewed by the staff, and they may proceed with construction of the project as de- picted by the drawings, filed by K. Wissman, PUCO staff. (1 pg.)
05/06/1996 ICN #0020 FERC license and license agreement; Ohio DOT highway crossing permits; Ohio EPA, storm water pollution prevention plan and national pollutant dischange elimina- tion system permit; W.V. Public Lands Corporation - Ohio River Crossing permit; and engineering drawings, filed on behalf of applicant by P. Meier. (107 pgs.)
02/12/1996 ICN #0019 Opinion, Order, and Certificate that the joint stipulation of findings and recommendations is hereby approved in its entirety, including the additional stipu- lated term outlined in this order; that a certificate of environmental compatibility and public need is hereby issued for the contruction, operation, and maintenance of a 138kV transmission line along the preferred route; that the certificate shall contain the conditions set forth in Section IV of the order. (21 pgs.) Additional Concurring Opinion of Chairman Craig A. Glazer and Ohio Director of Development Donald E. Jakeway. (2 pgs.)
02/09/1996 ICN #0018 Additional information filed on behalf of appli- cant by K. Hegemann. (2 pgs.)
01/12/1996 ICN #0017 Additional information filed on behalf of appli- cant by J. Small. (2 pgs.)
12/28/1995 ICN #0016 Transcript filed for hearing held 12/14/95, (GP), 12 pgs., Submitted.
12/20/1995 ICN #0015 Transcript filed for hearing held 12/13/95, (GP), 11 pgs., Con't. (Pomeroy, Ohio)
12/18/1995 ICN #0014 Correction to Proof of Public Notice filed on November 29, 1995, filed on behalf of applicant by J. Small. (1 pg.)
12/14/1995 ICN #0013 Notice of filing joint stipulation filed on behalf of applicant by J. Small, and the PUCO staff by M. Malone. (15 pgs.)
11/29/1995 ICN #0012 Proof of public notice filed on behalf of appli- cant by J. Small. (12 pgs.)
11/28/1995 ICN #0011 Staff Report filed. (33 pgs.)
11/03/1995 ICN #0010 First set of interrogatories and requests for production of documents filed on behalf of the OPSB staff by G. Rocco. (19 pgs.)
11/01/1995 ICN #0009 Notice of appearance filed on behalf of the PUCO staff by M. Malone and G. Rocco. (2 pgs.)
10/24/1995 ICN #0008 Notice of appearance filed on behalf of applicant by J. Bentine. (1 pg.) (FILED 10/23/95)
10/06/1995 Entry ordering that the hearing in this matter be scheduled at the times and places designated in finding (5). (AE) (3 pgs.)
09/12/1995 ICN #0006 Proof of service filed on behalf of applicant by K. Hegemann. (21 pgs.) (FILED 9/11/95)
09/01/1995 Letter stating the application has been certified as being complete filed on behalf of the PUCO staff. (2 pgs.)
07/05/1995 ICN #0004 Additions/deletions volume of application filed on behalf of applicant by K. Hegemann.
07/05/1995 ICN #0003 New application filed on behalf of applicant by K. Hegemann.
11/08/1994 ICN #0002 Request for extension of time for completeness review filed on behalf of applicant by E. Daggett. (2 pgs.)
09/14/1994 ICN # 0001 In the matter of the application for Certificate of environmental compatibility and public need for the Belleville Hydroelectric Project Transmission Facilities.