CASE NUMBER: 94-1212-EL-BTX
CASE DESCRIPTION: OHIO EDISON/CRISSINGER SUBSTATION
DOCUMENT SIGNED ON: 4/25/2024
DATE OF SERVICE: ________________________________________
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates.
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates
10/16/2000 ICN #0032 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be tranferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.)
05/21/1996 ICN #0031 Letter stating that construction for the Crissinger-Roberts portion of the subject project was completed and placed in service on April 8, 1996; con- struction for the Kirby-Roberts portion of the subject was completed and placed in service on May 8, 1996; the Kirby 138-69 kV Substation construction was completed on April 15, 1996; the 138 kV bus equipment and the 138-69 kV transformer at Kirby Substation were placed in service on May 8, 1995; the 69 kV portion of Kirby will be energized upon completion of remaining 69 kV transmission line work, filed on behalf of applicant by T. Burgess. (1 pg.)
03/15/1996 ICN #0030 Letter to Mr. T. C. Burgess stating that Ohio Edison may proceed with construction of the portion of the project depicted by the drawings, filed by K. Wissman, PUCO staff. (1 pg.)
03/14/1996 ICN #0029 Revised sheet 7 of Plan and Profile drawing TZ-375-F of the Kirby-Roberts portion of the Crissinger- Tangy 138 kV project, filed on behalf of applicant by T. Burgess. (2 pgs.)
01/26/1996 ICN #0028 Letter to Mr. T. C. Burgess approving the drawings submitted on January 3, 1996, filed by K. Wissman, PUCO staff. (1 pg.)
01/25/1996 ICN #0027 Plan and profile drawings TZ-376-F, Sheets 1 & 2, filed on behalf of applicant by T. Burgess. (2 pgs.)
01/04/1996 Letter stating that the portion of the project depicted by the drawings may proceed with construction filed by K. Wissman, PUCO staff. (1 pg.)
01/04/1996 Revised sheets 3, Rev. C and 4, Rev. B of plan and profile drawing TZ-374-F of the Kirby-Tangy portion, and revised sheets 3, Rev. A;4, Rev. A; and 5, Rev. A of the Kirby- Roberts portion of the Crissinger-Tangy 138 kV project filed on behalf of applicant by T. C. Burgess. (7 pgs.)
12/22/1995 ICN #0024 Required highway crossing permits for two loca- tions on the Kirby-Roberts portion of the Crissinger-Tangy 138 kV transmission line project, and letter from the Department of the Army, filed on behalf of applicant by T. Burgess. (4 pgs.)
12/11/1995 Letter stating construction may proceed filed by K. Wissman, PUCO staff. (1 pg.)
12/07/1995 Sheets 6 through 9 Plan & Profile drawing TZ-375-F of the Kirby-Roberts portion of the Crissinger-Tangy 138 kV project filed on behalf of applicant by R. M. Doncaster. (2 pgs.)
11/08/1995 ICN #0021 Response letter to Mr. T. C. Burgess, filed by K. Wissman, OPSB staff. (1 pg.)
11/08/1995 ICN #0020 Route and property drawing TZ-1530-E, Sheet 1, Revision 1, of the Crissinger-Roberts portion of certified route, as amended, filed on behalf of applicant by R. Don- caster. (3 pgs.)
10/24/1995 ICN #0019 Letter to Mr. T. C. Burgess, Ohio Edison Company, stating that they may proceed with construction of those portions of the project depicted by the drawings submitted on October 3 and October 17, 1995, filed by K. Wissman, PUCO staff. (1 pg.)
10/23/1995 ICN #0018 Plan and profile drawing TZ-375-F, sheets 1 through 5, filed on behalf of applicant by T. Burgess. (2 pgs.)
10/23/1995 ICN #0017 Route and property drawings filed on behalf of applicant by T. Burgess. (2 pgs.)
08/10/1995 ICN #0016 Each concurrence letter from the ODNR and USF&WS, and aerial drawings and the June 9, 1995 letter to the ODNR and USF&WS describing the potential bat habitat areas, filed on behalf of applicant by T. Burgess. (2 pgs.)
08/10/1995 ICN #0015 Copy of OE's June 29, 1995 coordination letter with OHPO, and letter dated July 21, 1995 from OHPO con- curring with the survey results, filed on behalf of applicant by T. Burgess. (4 pgs.)
08/01/1995 ICN #0014 Letter in response to the June 16, 1995 request for additional information, filed on behalf of applicant by T. Burgess. (9 pgs.)
06/14/1995 ICN #0013 Letter stating that the engineering drawings for this project have been reviewed by the staff and found to be consistent with the description of the facility certifiecated; therefore, applicant may proceed with construction of the portion of the project depicted by the drawings, filed by K. Wissman, OPSB staff. (1 pg.)
05/17/1995 ICN #0012 Route and property drawings filed on behalf of applicant by T. Burgess. (29 pgs.)
03/16/1995 ICN #0011 Route and property drawings as listed on Exhibit OE-1, filed on behalf of applicant by T. Burgess. (3 pgs.)
03/15/1995 ICN #0010 Letter stating that the route and property draw- ings for the Crissinger-Tangy project, submitted on 2/21/95, have been reviewed by the staff, and Ohio Edison may pro- ceed with construction of the portion of the project depicted by the drawings, filed by K. Wissman, OPSB staff. (1 pg.)
12/19/1994 ICN #0009 Opinion & Order that the Certficate issued to Ohio Edison on 9/20/93 is hereby amended to reflect the amended line route set forth in the amendment application. (OPSB) (5 pgs.)
12/14/1994 ICN #0008 Letter in response to the November 22, 1994 inquiry, filed on behalf of applicant by T. Burgess. (1 pg.)
10/05/1994 ICN #0007 Affidavit of service filed on behalf of applicant by T. Burgess. (6 pgs.)
09/29/1994 ICN #0006 Supplemental filing submitted on behalf of applicant by M. Beiting. (2 pgs.)
08/29/1994 ICN# 0003 Proof of service of amendment to the certificate for Crissinger-Tangy 138 kV Transmission Line Project filed on behalf of Ohio Edison Company by T.C. Burgess.
08/29/1994 ICN #0005 Affidavit of service of Donald P. Morrison, Jr. filed on behalf of applicant by T. Burgess. (2 pgs.)
08/22/1994 ICN #0004 Proofs of publication filed on behalf of applicant by T. Burgess. (Delaware, Marion, Union Counties) (13pgs.)
07/20/1994 ICN #0003 Entry ordering that all further filings made regarding the Crissinger Substation, Tawa Road, Brindle Road, and Smart Road amendments be filed under the appropriate case docket identified in Finding No. 3. (OPSB)
07/20/1994 ICN #0002 Entry ordering that applicant serve and publish notice of the proposed approval of the amendment within 15 days of this entry. (OPSB)
07/20/1994 Entry ordering that all further filings made regarding the Crissinger Substation, Tawa Road, Brindle Road, and Smart Road amendments be filed under the appropriate case docket identified in Finding 3. (SF)
07/15/1994 ICN #0001 In the matter of the application for amendment to the certificate of environmental compatibility and public need for the Crissinger-Tangy 138 kV Transmission Line Project, Crissinger Substation Area Realignment, Marion County.