CASE NUMBER: 92-1945-EL-BTX
CASE DESCRIPTION: OEC & DP&L/CLARK-URBANA
DOCUMENT SIGNED ON: 4/23/2024
DATE OF SERVICE: ________________________________________
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates.
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates
10/16/2000 ICN #0037 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.)
12/04/1995 ICN #0036 Letter stating that construction for the trans- mission line portion of the Clark-Urbana 138 kV Project was completed on October 17, 1995, filed on behalf of Ohio Edison by T. Burgess. (1 pg.)
09/06/1995 ICN #0035 Copy of previously provided permits with the new expiration dates, filed on behalf of applicant by T. Bur- gess. (3 pgs.)
08/01/1995 ICN #0034 Letter regarding a recent evaluation of permitting requirements for Ohio Edison's portion the Blue Jacket-Kirby 138 kV Transmission Line Porject, filed on behalf of appli- cant by T. Burgess. (3 pgs.)
05/24/1995 ICN# 0033 Letter stating drawings have been reviewed and that the construction of the portion of the project depicted by the drawings may proceed filed on behalf of PUCO staff by K. Wissman. (1 pgs.)
05/23/1995 ICN #0032 Set of drawings TZ-371-F, Sheet 4, Revision A; and drawing TZ-371-F, Sheet 9, Revision A filed on behalf of applicant by T. Burgess. (3 pgs.)
03/16/1995 ICN #0031 Additional information filed on behalf of applicant by T. Burgess. (8 pgs.)
03/02/1995 ICN # 0030 Required highway crossing permits for three locations S.R. 334, S.R. 41 and U.S. 40 filed on behalf of Ohio Edison by T. C. Burgess. (4 pgs.)
02/27/1995 ICN #0029 Additional information filed on behalf of Ohio Edison and DP&L by T. Burgess. (2 pgs.)
02/24/1995 ICN #0028 Additional information filed on behalf of Ohio Edison Co. by T. Burgess. (21 pgs.)
02/13/1995 ICN #0026 Detailed engineering construction drawings filed on behalf of Ohio Edison by T. Burgess. (18 pgs.)
02/13/1995 ICN #0027 Letter stating that the engineering/construction drawings have been reviewed by the staff, and that the company may proceed with the construction of the project, filed on behalf of the OPSB staff by K. Wissman. (1 pg.)
02/10/1995 ICN #0025 Letter stating that the construction for the Clark-Urbana 138 kV project is scheduled to begin on March 1, 1995, filed on behalf of applicant by T. Burgess. (1 pg.)
12/19/1994 ICN #0024 Order on Certificate of Amendment that the Certi- ficate of Environmental Compatibility and Public Need for the 138 kV Clark-Urbana Transmission Line is hereby amended to permit construction, operation, and maintenance of a six-mile realignment. (OPSB) (5 pgs.)
12/02/1994 ICN #0023 Proofs of publication filed on behalf of applicant by T. Burgess. (12 pgs.)
11/04/1994 ICN #0022 Entry ordering that Ohio Edison serve copies of the amendment application and give public notice in accordance with Finding 4. (OPSB) (3 pgs.)
10/19/1994 ICN #0021 Correspondence letter supporting the application filed by M. Kridler, City of Springfield. (2 pgs.)
10/18/1994 ICN #0020 Affidavit of service filed on behalf of Ohio Edison by T. Burgess. (4 pgs.)
09/29/1994 ICN #0019 Additional information filed on behalf of applicant by M. Beiting and T. Burgess. (2 pgs.)
09/27/1994 ICN #0018 Application for amendment to the certificate filed on behalf of applicant by B. Miller. (51 pgs.)
07/08/1993 ICN #0017 Transcript filed for hearing held 6/17/93, (GL), 10 pgs., Submitted.
06/28/1993 ICN #0016 Opinion & Order approving the joint stipulation of findings and recommendations in its entirety. (OPSB)
06/17/1993 ICN #0015 Joint stipulation of findings and recommendations filed on behalf of DP&L by E. Rizer, Ohio Edison by M. Beiting, and the OPSB staff by G. Kelly.
06/08/1993 ICN #0014 Entry ordering that the adjudicatory hearing resume at 10:00 a.m. on 6/17/93 at the Commission offices. (OPSB)
05/24/1993 ICN #0013 Transcript filed for hearing held 5/3/93, (GL), 7 pgs., Con't.
05/18/1993 ICN #0012 Transcript filed for hearing held 4/29/93, (CG), 8 pgs., Submitted. (Springfield, Ohio)
04/16/1993 ICN#0011 Response to staff request for production of documents and interrogatories filed on behalf of the applicant by M. Beiting.
04/13/1993 ICN #0010 Staff Report filed.
04/08/1993 ICN #0009 Response to the Siting Board Staff's combined request for production of documents and interrogatories, filed on behalf of applicant by M. Beiting.
03/17/1993 ICN #0008 Letter notifying the Administrative Law Judge that the Ohio Power Siting Board has served its first set of requests for production of documents and inter- rogatories upon the applicants, Ohio Edison and Dayton Power & Light, filed by G. Kelly.
02/26/1993 ICN #0007 Notice of appearance, filed on behalf of the OPSB staff by G. Kelly.
02/19/1993 ICN #0006 Proofs of publication filed on behalf of applicant by T. Burgess. (Montgomery, Clark, and Champaign Counties)
01/28/1993 ICN #0005 Entry scheduling local hearing at 7:00 p.m. on 4/29/93 at City Hall, Springfield, Ohio; scheduling the adjudicatory hearing on 5/3/93 at 10:00 a.m. at the offices of the Commission. (OPSB)
01/25/1993 ICN #0004 Notice of appearance filed on behalf of DP&L by E. Rizer.
01/11/1993 ICN #0003 Affidavit of service filed on behalf of applicant by B. Miller.
12/30/1992 ICN #0002 Letter to Mr. B. M. Miller stating that the application for the Clark-Urbana 138 kV project has today been certified as being complete in accordance with Ohio Administrative Code Rule 4905-1-14(A)(1), filed by C. Glazer, PUCO staff.
10/30/1992 ICN #0001 In the matter of the application of Ohio Edison Company and The Dayton Power & Light Company for certifica- tion of the Clark (OE)-Urbana (DP&L) 138 kV Project, Clark and Champaign Counties, Ohio.