Date FiledSummaryPages
10/16/2000ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates.13
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates 7
10/16/2000ICN #0223 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.)6
12/16/1996Letter stating the completed date for the project filed on behalf of applicant by G. L. Cunningham. (1 pg.)1
06/04/1996ICN #0221 Letter to Mr. T. C. Burgess stating that the engineering drawings for this project submitted on May 13, 1996, have been reviewed by the staff, and construction of the portion of the project depicted by the drawing may be started, filed on behalf of the PUCO staff by K. Wissman. (1 pg.)1
05/30/1996ICN #0220 Revised Sheet 6 of Plan and Profile drawing TZ-374-F of the Kirby-Tangy portion of the Crissinger- Tangy 138 kV project, filed on behalf of applicant by T. Burgess. (2 pgs.)2
05/21/1996ICN #0219 Letter stating that construction for the Crissinger-Roberts portion of the subject project was completed and placed in service on April 8, 1996; construc- tion for the Kirby-Roberts portion was completed and placed in service on May 8, 1996; the Kirby 138-69 kV Substation construction was completed on April 15, 1996; the 138 kV bus equipment and the 138-69 kV transformer at Kirby Sub- station were placed in service on May 8, 1995; the 69 kV portion of Kirby will be energized upon completion of re- maining 69 kV transmission line work, filed on behalf of applicant by T. Burgess. (1 pg.)1
04/18/1996ICN #0218 Letter to Mr. T. C. Burgess, Ohio Edison, stating that they may proceed with construction of the portion of the project depicted by the drawing submitted on March 22, 1996, filed by K. Wissman, PUCO staff. (1 pg.)1
04/18/1996ICN #0217 Revised Sheet 8 of Plan & Profile drawing TZ-374-F of the Kirby-Tangy portion of the Crissinger- Tangy 138 kV project, filed on behalf of applicant by T. Burgess. (1 pg.)1
03/26/1996Final archaeological survey report filed on behalf of applicant by T. C. Burgess. (6 pgs.)6
03/15/1996ICN #0215 Letter to Mr. T. C. Burgess, Ohio Edison, stating that Ohio Edison may proceed with construction of the portion of the project depicted by the drawings, filed by K. Wissman, PUCO staff. (1 pg.)1
03/14/1996ICN #0214 Revised sheet 7 of Plan and Profile drawing TZ-375-F of the Kirby-Roberts portion of the Crissinger- Tangy 138 kV project, filed on behalf of applicant by T. Burgess. (2 pgs.)2
01/26/1996ICN #0213 Letter to Mr. T. C. Burgess approving the drawings submitted on January 3, 1996, filed by K. Wissman, PUCO staff. (1 pg.)1
01/25/1996ICN #0212 Plan and profile drawings TZ-376-F, Sheets 1 & 2, filed on behalf of applicant by T. Burgess. (2 pgs.)2
01/04/1996Letter stating that the portion of the project depicted by the drawings may proceed with construction filed by K. Wissman, PUCO staff. (1 pg.)1
01/04/1996Revised sheets 3, Rev. C and 4, Rev. B of plan and profile drawing TZ-374-F of the Kirby Tangy portion, and revised sheets 3, Rev. A;4, Rev. A; and 5, Rev. A of the Kirby- Roberts portion of the Crissinger-Tangy 138 kV project filed on behalf of applicant by T. C. Burgess. (7 pgs.)2
01/04/1996Highway crossing permit for S.R. 257 with the new expiration date filed on behalf of applicant by T. C. Burgess. (3 pgs)3
12/22/1995ICN #0208 Required highway crossing permits for two loca- tions on the Kirby-Robers portion of the Crissinger-Tangy 138 kV transmission line, and letter from the Department of the Army, filed on behalf of applicant by T. Burgess. (4 pgs.)4
12/11/1995Letter stating construction may proceed filed by K. Wissman, PUCO staff. (1 pg.)1
12/07/1995Sheets 6 through 9 of Plan & Profile drawing TZ-375-F of the Kirby-Roberts portion of the Crissinger-Tangy 138 kV project filed on behalf of applicant by R. M. Doncaster. (2 pgs.)2
12/07/1995Letter stating that Ohio Edison's 11/14/95 coordination letter with OHPO and a letter dated 11/15/95 from OHPO concurring with the survey results and the company's proposed minimum impact during line construction is enclosed filed on behalf of applicant by T. C. Burgess. (6 pgs.)6
12/01/1995Letter stating drawing has been reviewed and construction may proceed filed by K. Wissman, PUCO staff. (1 pg.)1
11/30/1995Revised Kirby-Tangy plan & profile drawing TZ-374-F, sheet 8 filed on behalf of applicant by T. C. Burgess. (2 pgs.)2
11/21/1995ICN #0202 OE's November 3, 1995 coordination letter with OHPO, and letter dated November 13, 1995, from OHPO con- curring with the survey results and the Company's proposal to minimize impact during line construction, filed on behalf of applicant by T. Burgess. (5 pgs.)5
11/08/1995ICN #0201 Copy of previously provided permit with the new expiration date, filed on behalf of applicant by T. Burgess. (2 pgs.)2
11/08/1995ICN #0200 Response letter to Mr. T. C. Burgess, filed by K. Wissman, OPSB staff. (1 pg.)1
11/08/1995ICN #0199 Map of Drawing TZ-1268-B which was inadvertently omitted from the materials previously submitted, filed on behalf of applicant by T. Burgess. (3 pgs.)3
11/08/1995ICN #0198 Route and Property drawing TZ-1530-E, Sheet 1, Revision 1, of the Crissinger-Roberts portion of certified route, as amended, filed on behalf of applicant by R. Doncaster. (3 pgs.)3
11/06/1995ICN #0197 Materials documenting the activities undertaken in compliance with the indicated certificate conditions, and request for an expedited review and response, filed on behalf of applicant by T. Burgess. (9 pgs.)9
10/24/1995ICN #0196 Letter to Mr. T. C. Burgess, Ohio Edison, stating that they may proceed with construction of those portions of the project depicted by the drawings submitted on October 3 and October 17, 1995, filed by K. Wissman, PUCO staff. (1 pg.)1
10/23/1995ICN #0195 Plan and profile drawing TZ-375-F, sheets 1 through 5, filed on behalf of applicant by T. Burgess. (2 pgs.)2
10/23/1995ICN #0194 Route and property drawings filed on behalf of applicant by T. Burgess. (2 pgs.)2
10/04/1995INC #0030 Revised Kirby-Tangy Plan & Profile drawings TZ- 374-F, Sheets 5A, 7B, 9A & 10A, filed on behalf of applicant by T. Burgess. (1 pg.)1
10/04/1995ICN #0038 Revised Kirby-Tangy Plan & Profile drawings TZ- 374-F, Sheets 5A, 7B, 9A & 10A, filed on behalf of applicant by T. Burgess. (1 pg.)1
10/04/1995ICN #0029 Revised Kirby-Tangy Plan & Profile drawings TZ- 374-F, Sheets 5A, 7B, 9A & 10A, filed on behalf of applicant by T. Burgess. (1 pg.)1
10/04/1995ICN #0193 Revised Kirby-Tangy Plan & Profile drawings TZ- 374-F, Sheets 5A, 7B, 9A & 10A, filed on behalf of applicant by T. Burgess. (1 pg.)1
10/04/1995ICN #0029 Revised Kirby-Tangy Plan & Profile drawings TZ- 374-F, Sheets 6 & 7, filed on behalf of applicant by T. Burgess. (1 pg.)1
10/04/1995ICN #0039 Revised Kirby-Tangy Plan & Profile drawings TZ- 374-F, Sheets 6 & 7, filed on behalf of applicant by T. Burgess. (1 pg.)1
10/04/1995ICN #0037 Revised Kirby-Tangy Plan & Profile drawings TZ- 374-F, Sheete 6 & 7, filed on behalf of applicant by T. Burgess. (1 pg.)1
10/04/1995ICN #0028 Revised Kirby-Tangy Plan & Profile drawings TZ- 374-F, Sheete 6 & 7, filed on behalf of applicant by T. Burgess. (1 pg.)1
10/04/1995ICN #0192 Revised Kirby-Tangy Plan & Profile drawings TZ- 374-F, Sheets 6 & 7, filed on behalf of applicant by T. Burgess. (1 pg.)1
10/03/1995ICN #0028 Letter to Mr. T. C. Burgess stating that he may proceed with construction of those portions of the project depicted by the drawings submitted on September 11 and September 26, 1995, filed by K. Wissman, OPSB staff. (1 pg.)1
10/03/1995ICN #0191 Letter to Mr. T. C. Burgess stating that he may proceed with construction of those portions of the project depicted by the drawings submitted on September 11, and September 26, 1995, filed by K. Wissman, OPSB staff. (1 pg.)1
09/21/1995ICN #0190 Regional permit for the existing Scioto River crossing of DP&L's Delaware-Darby 138 kV transmission line filed on behalf of applicant by T. Burgess. (6 pgs.)6
09/06/1995ICN #0189 Coordination letters received from the Marion County Engineer's Office and the Marion Soil and Water Conservation District. filed on behalf of applicant by T. Burgess. (3 pgs.)3
08/16/1995ICN #0188 Correspondence letter to T. C. Burgess, Ohio Edison, stating that they may proceed with the construction of those portions of the project depicted by the drawings, filed by K. Wissman, OPSB staff. (1 pg.)1
08/16/1995ICN #0187 Required highway crossing permits filed on behalf of applicant by T. Burgess. (2 pgs.)2
08/16/1995ICN #0186 Plan and profile drawings filed on behalf of applicant by T. Burgess. (3 pgs.)3
08/10/1995ICN #0185 Each concurrence letter from the ODNR and USF&WS, and aerial drawings and the June 9, 1995 letter to the ODNR and USF&WS describing the potential bat habitat areas, filed on behalf of applicant by T. Burgess. (2 pgs.)2
08/10/1995ICN #0184 Letter to Mr. Rich Doncaster, Ohio Edison, stating that they have no additional comments regarding the Crissinger-Tangy 138 kV Transmission Line Project, filed by John H. Marshall, Ohio Department of Natural Resources. (3 pgs.)3
08/10/1995ICN #0183 Copy of OE's June 29, 1995 coordination letter with OHPO, and letter dated July 21, 1995 from OHPO con- curring with the survey results, filed on behalf of applicant by T. Burgess. (4 pgs.)4
08/01/1995ICN #0182 Letter in response to the June 16, 1995 request for additional information, filed on behalf of applicant by T. Burgess. (9 pgs.)9
08/01/1995ICN #0181 Copy of Department of the Army regional permit for crossing the Scioto River on the Kirby-Tangy 138 kV portion of the Crissinger-Tangy 138 kV transmission line project, filed on behalf of applicant by T. Burgess. (10 pgs.)10
06/20/1995ICN #0180 Correspondence letter to Mr. T. C. Burgess stat- ing that the engineering drawings for this project have been reviewed and construction of the project may begin, filed by K. Wissman, OPSB staff. (1 pg.)0
06/16/1995ICN #0179 Letter in response to transmittal dated May 3, 1995 referencing that the National Pollutant Discharge Elimination System (NPDES) Permit - Storm Water General Permit for Construction Activity is not required for this project, filed by K. Wissman, OPSB staff. (1 pg.)0
06/14/1995ICN #0178 Letter stating that the engineering drawings for this project have been reviewed by the staff and found to be consistent with the description of the facility certifiecated; therefore, applicant may proceed with construction of the portion of the project depicted by the drawings, filed by K. Wissman, OPSB staff. (1 pg.)0
06/13/1995ICN #0177 One set of three Plan and Profile drawings for the captioned 138 kV transmission line relocations at Tangy Substation, filed on behalf of applicant by T. Bur- gess. (2 pgs.)0
06/13/1995ICN #0176 OE's May 18, 1995 coordination letter with OHPO, and letter dated May 24, 1995 from OHPO concurring with survey results, filed on behalf of applicant by T. Burgess. (6 pgs.)0
06/13/1995ICN #0175 Copy of three of the Union County permits for work within road rights-of-way of Township 355, County Road 265 (Hoskins Road), and County Road 264; and copy of blanket permit 95-22 covering work within road rights-of- way of Union County, filed on behalf of applicant by T. Burgess. (6 pgs.)0
05/31/1995ICN #0174 Schedule for the Glade Mallow Coordination, filed on behalf of applicant by T. Burgess. (5 pgs.)0
05/17/1995ICN #0173 Route and property drawings filed on behalf of applicant by T. Burgess. (29 pgs.)0
05/17/1995ICN #0172 Management Summary which provides a description of the survey associated with this project, filed on behalf of applicant by T. Burgess. (6 pgs.)0
05/17/1995ICN #0171 Required highway crossing permits for three locations on the Kirby-Tangy 138 kV portion of the Crissinger_Tangy lineproject, filed on behalf of applicant by T. Burgess. (6 pgs.)0
05/17/1995ICN #0170 OE's April 20, 1995 coordination letter with OHPO, and letter dated May 3, 1995 from OHPO concurring with the survey, filed on behalf of applicant by T. Burgess. (4 pgs.)0
05/17/1995ICN #0169 Response letter to Mr. Thomas C. Burgess regarding the project, filed on behalf of applicant by T. Burgess. (5 pgs.)0
05/17/1995ICN #0168 Letter clarifying the correct designation (33-DL- 868) of the potentially significant site, filed on behalf of applicant by T. Burgess. (2 pgs.)0
04/14/1995ICN #0167 Information, including routes and property maps, filed for review in this matter on behalf of applicant by R. Doncaster (20 pgs)0
04/14/1995ICN# 0166 Concurrence letter from the ODNR and USF&WS. Also aerial drawings and January 19, 1995 letter to the ODNR and USF&WS describing the potential bat habitat areas filed on behalf of Ohio Edison Company by T. V. Burgess. (5 pgs)0
04/14/1995INC# 0165 Materials describing the results of the archaeo- logy field survey and OHPO review of the first segment, including the management summary, filed on behalf of Ohio Edison by T. C. Burgess. (19 pgs)0
03/23/1995ICN #0164 Ohio Edison's March 20, 1995 letter to Mr. Hooper which provides a copy of the February 3, 1995 material filed with the Board staff, filed by T. Burgess. (16 pgs.)0
03/16/1995ICN #0163 Route and property drawings as listed on Exhibit OE-1, filed on behalf of applicant by T. Burgess. (3 pgs.)0
03/15/1995ICN #0162 Letter stating that the route and property draw- ings for the Crissinger-Tangy project, submitted on 2/21/95, have been reviewed by the staff, and Ohio Edison may pro- ceed with construction of the portion of the project depicted by the drawings, filed by K. Wissman, OPSB staff. (1 pg.)0
02/27/1995ICN #0161 Letter to Bernard and Phyllis Casto in response to their letter dated January 27, 1995, filed on behalf of applicant by T. Burgess. (2 pgs.)0
02/24/1995ICN #0159 Correspondence letter regarding the application, filed by T. Henschen. (1 pg.)0
02/24/1995ICN #0160 Response letter to Mr. Tye Henschen, filed by K. Wissman, OPSB staff. (2 pgs.)0
11/10/1994ICN #0158 Response letter to Alan and Shari Hooper filed on behalf of the OPSB staff. (2 pgs.)0
11/10/1994ICN #0157 Response letter to Duncan Borland D.O. filed on behalf of the OPSB staff. (2 pgs.)0
09/29/1994ICN #0156 Crissinger Substation Area amendment as supple- mented September, 1994, filed on behalf of applicant. (57 pgs.)0
07/20/1994ICN #0155 Entry ordering that all further filings made regarding the Crissinger Substation, Tawa Road, Brindle Road, and Smart Road amendments be filed under the appropriate case docket identified in Finding No. 3. (OPSB)0
07/20/1994Entry ordering that all further filings made regarding the Crissinger Substation, Tawa Road, Brindle Road, and Smart Road amendments be filed under the appropriate case docket identified in Finding 3. (SF)2
07/07/1994ICN #0154 Revised pages to the application for the Criss- inger Substation Area Amendment, filed on behalf of applicant by M. Beiting.0
06/23/1994ICN # 0153 Application for Amendment to the Certificate of Environmental Compatibility and Public Need for the Crissin- ger-Tangy 138 kV transmission line project Tawa Road area realignment Union County filed on behalf of applicant by M. Beiting, T. Burgess.0
06/23/1994ICN # 0152 Application for Amendment to the Certificate of Environmental Compatibility and Public Need for the Crissin- ger-Tangy 138 kV transmission line project Crissinger Subst- ation area realignment Marion County filed on behalf of applicant by M. Beiting, T. Burgess.0
06/23/1994ICN # 0151 Application for Amendment to the Certificate of Environmental Compatibility and Public Need for the Crissin- ger-Tangy 138 kV transmission line project Smart Road Area realignment Delaware County filed on behalf of applicant by M. Beiting, T. Burgess.0
06/23/1994ICN # 0150 Application for Amendment to the Certificate of Environmental Compatibility and Public Need for Crissinger- Tangy 138 kV transmission line project Brindle Road Area realignment Delaware County filed on behalf of applicant by M. Beiting, T. Burgess.0
06/23/1994ICN # 0149 Letter stating four separate amendments to the Certificate of Environmental Compatibility and Public Need and a map which shows the location of these four amendments filed on behalf of applicant by M. Beiting, T. Burgess.0
06/23/1994Exhibit OE #7- map, filed by M. Burgess and M. Beiting.3
06/15/1994Application for amendment to the certificate of environmental compatibility and public need for the Crissinger-Tangy 138 kV Transmission Line Project Brindle Road Area Realignment, Delaware County filed on behalf of Ohio Edison Company by B. Miller.61
04/18/1994ICN #0148 Letter advising of the change of designation of Richwood Substation, filed on behalf of applicant by T. Burgess.0
10/25/1993ICN #0147 Entry dening the application to file the application for rehearing and the application for reheaing are both denied. (OPSB)0
10/20/1993ICN #0146 Affidavit of due notice and service filed by John Richard Anderson and Kevin Guy Anderson.0
10/20/1993ICN #0145 Application for rehearing filed by John Richard Anderson and Kevin Guy Anderson.0
10/20/1993ICN #0144 Application for leave to file application for rehearing, filed by John Richard Anderson and Kevin Guy Anderson.0
10/18/1993ICN #0142 Letter to Mr. Kevin Guy Anderson in response to his letter of September 20, 1993, filed by C. Glazer, PUCO staff.0
10/18/1993ICN #0143 Open letter to the Goveror concerning the voices of Ohioans asking to be heard, filed by K. Anderson.0
09/20/1993ICN #0141 Opinion & Order that the Certificate of Environ- mental Compatibility and PUblic Need for the Crissinger- Tangy electric transmission line project is hereby issued to Ohio Edison to allow the construction, operation, and maintenance of such facility along the route set forth in Finding15; that the certificate shall contain the staff recommended conditions as modified by the Board's findings, as well as those additional conditions set forth in the conclusion of this Opinion. (OPSB) Concurring in part and dissenting in part Opinion of the Ohio Department of Agriculture.0
05/17/1993ICN #0140 Response letter to Gale and Janice Price, filed by C. Glazer, PUCO staff.0
04/28/1993ICN #0139 Correspondence letter opposing the application, filed by Gale and Janice Price.0
04/22/1993ICN #0138 Letter stating that a reply brief will not be filed on behalf of Duan Stinemetz, filed by M. Christen- sen.0
04/21/1993ICN #0137 Post hearing response brief of the Staff of The OPSB filed by L. Angell.0
04/21/1993ICN #0136 Reply brief filed on behalf of applicant by M. Beiting.0
04/13/1993ICN #0135 Reply letter to Mr. Kevin Guy Anderson, with attached summary of objections from him, filed by Craig Glazer PUCO staff.0
04/09/1993ICN #0131 Correspondence letter opposing the application, filed by R. Belville.0
04/09/1993ICN #0132 Correspondence letter opposing the application, filed by J. Moore.0
04/09/1993ICN #0133 Correspondence letter opposing the application, filed by D. Foos.0
04/09/1993ICN #0130 Correspondence letter opposing the application, filed by J. Robinson.0
04/09/1993ICN #0134 Correspondence letter opposing the application, filed by R. Beightler.0
04/09/1993ICN #0129 Correspondence letter opposing the application, filed by Chuck and Sherryl Sheets.0
04/09/1993ICN #0128 Correspondence letter opposing the application, filed by F. Sampson.0
04/07/1993ICN #0127 Brief filed on behalf of applicant by M. Beiting.0
04/07/1993ICN #0126 Amicus brief filed on behalf of The Dayton Power & Light Company by E. Rizer.0
04/07/1993ICN #0125 Motion for leave to file amicus brief and memor- andum in support filed on behalf of The Dayton Power & Light Company by E. Rizer.0
04/07/1993ICN #0124 Letter filed in lieu of an initial post hearing brief, filed by M. Christensen.0
04/05/1993ICN #0123 Post hearing brief filed on behalf of the OPSB staff by L. Angell.0
04/01/1993ICN #0118 Correspondence letters from various consumers, submitted by J. Rupert, Ohio Department of Natural Resources.0
04/01/1993ICN #0122 Correspondence letters opposing the application, filed by Brad Foreman and Kimberly Foreman.0
04/01/1993ICN #0121 Response letter to Mr. Bill Lowe, Union County Farm Bureau, filed by Mary Bearden, Union County Community Improvement Corp.0
04/01/1993ICN #0120 Correspondence letters opposing the application, filed by S. McBean and various consumers.0
04/01/1993ICN #0119 Response and correspondence letters filed by R. Suppes, D. Foos, and R. Beightler.0
03/31/1993ICN #0117 Correspondence letters opposing the application, filed by various consumers.0
03/22/1993ICN #0116 Correspondence letter filed by Robert Beightler and response from Chairman Glazer.0
03/17/1993ICN #0115 Reply letter to Senator John Glenn, with attached letter from him, filed by C. Glazer, PUCO staff.0
03/17/1993ICN #0114 Reply letter to Mr. Dan Foos, with attached letter from him, filed by C. Glazer, PUCO staff.0
03/17/1993ICN #0113 Reply letter to Mr. James R. Conway, Marion Steel Company, with attached letter from him, filed by C. Glazer, PUCO staff.0
03/17/1993ICN #0112 Reply letter to Mr. Kenneth J. Lengieza, Marion County Regional Planning Commission, with attached letter from him, filed by C. Glazer, PUCO staff.0
03/17/1993ICN #0111 Reply letter to Mayor Jack Kellogg, City of Marion, with attached letter from him, filed by C. Glazer, PUCO staff.0
03/09/1993ICN #0110 Transcript filed for hearing held 4/3/93, (SF), 91 pgs., Con't., Volume II.0
03/09/1993ICN #0109 Transcript filed for hearing held 3/1/93, (SF), 75 pgs., Con't., Volume I.0
03/09/1993ICN #0108 Reply letters from C. Glazer, PUCO staff; and various correspondence letters filed.0
03/05/1993ICN #0107 Joint motion and memorandum in support filed on behalf of Ohio Edison Company by M. Beiting; Duane Stinemetz by M. Christensen; and the OPSB staff by L. Angell.0
03/04/1993ICN #0106 Correspondence letter opposing the application, filed by W. Bale, Delaware County Farm Bureau, Inc.0
03/04/1993ICN #0104 Correspondence letter opposing the application, filed by R. Walsmith.0
03/04/1993ICN #0105 Reply letter to Ronald R. Walsmith, filed by K. Wissman, OPSB staff.0
03/03/1993ICN#103 Letter in opposition to the application filed by J. Rockenbaugh.0
03/03/1993ICN#102 Correspondence letter opposing the application filed by K. Byers.0
03/03/1993ICN#101 A summary of objections to the application filed by K. Anderson.0
03/03/1993ICN#100 Correspondence letter filed on behalf of Dept. of Health to various persons opposing the application.0
03/02/1993ICN #0099 Reply letters from C. Glazer, PUCO staff; and correspondence letter from various consumers, filed.0
02/24/1993ICN #0098 Correspondence letter opposing the application, filed by K. Byers.0
02/23/1993ICN #0097 Correspondence letter opposing the application, filed by W. Cox.0
02/23/1993ICN #0096 Correspondence letter opposing the application, filed by Arch Lindsay.0
02/23/1993ICN #0095 Correspondence letters opposing the application, filed on behalf of various consumers.0
02/19/1993ICN #0094 Correspondence letter opposing the application, filed by B. Huber.0
02/19/1993ICN #0093 Transcript filed for hearing held 2/17/93, (SF), 7 pgs., Con't.0
02/19/1993ICN #0092 Transcript filed for hearing held 2/16/93, (SF), 223 pgs., Con't.0
02/18/1993ICN #0091 Comments filed on behalf of the Department of Public Utilities by J. Doutt.0
02/17/1993ICN #0089 Correspondence letters opposing application, filed by various consumers.0
02/17/1993ICN #0090 Correspondence letters opposing the application, filed by various consumers.0
02/16/1993ICN #0088 Correspondence letter opposing the application, filed by W. Bale, Delaware County Farm Bureau, Inc.0
02/16/1993ICN #0087 Correspondence letter opposing the application, filed by R. Evans, Jr.0
02/16/1993ICN #0086 Correspondence letter opposing the application, filed by E. Zimmerman.0
02/16/1993ICN #0085 Correspondence letter opposing the application, filed by J. Rockenbaugh.0
02/16/1993ICN #0084 Correspondence letter opposing application, filed by R. Packer, Packer Aviation, Inc.0
02/16/1993ICN #0083 Correspondence letter opposing application, filed by O. Traff, Union County Trustees & Clerks Association.0
02/16/1993ICN #0082 Affidavit of Thomas R. Jackson opposing the application.0
02/16/1993ICN #0081 Correspondence letter opposing application, filed on behalf of the Ohio Farm Bureau by R. Bash.0
02/16/1993ICN #0080 Resolution No. 93-100 (corrected copy) filed on behalf of the Delaware County Commissioners by J. Hatfield.0
02/16/1993ICN #0079 Correspondence letter opposing application, filed by W. Greathouse.0
02/16/1993ICN #0078 Correspondence letter opposing application, filed by W. Foos.0
02/16/1993ICN #0077 Correspondence letters opposing the application, filed on behalf of various consumers.0
02/12/1993ICN #0064 Correspondence letter opposing application, filed by D. Stillings, Claibourne Township Trustees.0
02/12/1993ICN #0065 Correspondence letter opposing application, filed on behalf of various consumers.0
02/12/1993ICN #0063 Correspondence letter opposing application, filed by D. Robinson.0
02/12/1993ICN #0066 Correspondence letter opposing application, filed on behalf of the Union County Farm Bureau Board of Trustees by B. Grener and G. McDowell.0
02/12/1993ICN #0068 Correspondence letter opposing application, filed by J. Swartz.0
02/12/1993ICN #0067 Correspondence letter opposing application, filed by D. John.0
02/12/1993ICN #0076 Response letter to Ron and Pat Walker, filed by K. Wissman, PUCO staff.0
02/12/1993ICN #0075 Response letter to William and Martha Moore, filed by K. Willman, PUCO staff.0
02/12/1993ICN #0074 Correspondence letter opposing the application, filed by Ron and Pat Walker.0
02/12/1993ICN #0073 Correspondence letter opposing the application, filed by William and Martha Moore.0
02/12/1993ICN #0072 Correspondence letter opposing the application, filed by N. Smith.0
02/12/1993ICN #0071 Correspondence letter opposing the application, filed by S. Sheets.0
02/12/1993ICN #0070 Correspondence letter opposing the application, filed by D. Robinson.0
02/12/1993ICN #0069 Correspondence regarding the second meeting of the Women's Coal Conference, filed by S. Miller.0
02/11/1993ICN #0062 Correspondence letters opposing application, filed by various consumers.0
02/11/1993ICN #0061 Correspondence letter opposing application, filed by E. Zimmerman.0
02/11/1993ICN #0060 Correspondence letter opposing application, filed by J. Robinson.0
02/10/1993ICN #0059 Correspondence letter opposing application, filed by L. Fitzpatrick.0
02/10/1993ICN #0058 Correspondence letter opposing application, filed by C. Harper.0
02/10/1993ICN #0057 Correspondence letter opposing application, filed by J. Rockenbaugh.0
02/10/1993ICN #0056 Request for continuance filed on behalf of the Concerned Citizens' Group by J. Anderson.0
02/10/1993ICN #0055 Correspondence letters opposing the application, filed by various consumers.0
02/09/1993ICN# 0054 Correspondence letters opposing the application filed on behalf of various customers.0
02/09/1993ICN# 0053 Entry ordering that Duane Stinemetz is granted leave to intervene. (AE)0
02/08/1993ICN #0051 Correspondence letter opposing the application, filed by J. Scowden and various consumers.0
02/08/1993ICN #0049 Correspondence letter opposing the application, filed by Gary McDowell, public affairs chairman of the Union County Farm Bureau, Inc.0
02/08/1993ICN #0046 Correspondence letter opposing the application, filed by Connie Hines and Marv Rizor.0
02/08/1993ICN #0050 Correspondence letter opposing the application, filed by Erma Fish, Delaware County Farm Bureau, Inc.0
02/08/1993ICN #0044 Correspondence letter opposing the application, filed by J. Moore.0
02/08/1993ICN #0047 Correspondence letter opposing the application, filed by Jim Westfall, Glenn W. Irwin, and Gene Cameron, Union County Commissioners.0
02/08/1993ICN #0045 Correspondence letter opposing the application, filed by Ron and Pat Walker.0
02/08/1993ICN #0048 Correspondence letter opposing the application, filed by Steve Robinson, Chairman of the Board of Super- visors, Union Soil and Water Conservation District.0
02/08/1993ICN #0043 Correspondence letter opposing the application, filed by B. Matteson.0
02/08/1993ICN# 0052 Reply to memorandum contra motion of Ohio Edison Company and request for expeditious ruling filed by M. Christensen.0
02/05/1993ICN #0041 Correspondence letter protesting the application, filed by R. Sidle.0
02/05/1993ICN #0040 Correspondence letters opposing application, filed by J. Howison and various consumers.0
02/05/1993ICN #0042 Correspondence letter opposing application, filed by B. Newland.0
02/04/1993ICN #0036 Corresponsence letters opposing application, filed by J. Rockenbaugh and various consumers.0
02/04/1993ICN #0039 Memorandum contra motion for waiver of The Board's rules and motion to intervene of Duane Stinemetz, filed on behalf of applicant by M. Beiting.0
02/04/1993ICN #0038 Correspondence letter regarding application, filed by T. Rockenbaugh.0
02/04/1993ICN #0037 Correspondence letter regarding application, filed by T. Rockenbaugh.0
02/02/1993ICN #0035 Various correspondence letters opposing the application, filed by J. Foos, W. Foos, R. Belville, J. Moore, R. Bayes, F. Manville, and J. Belville. (FILED 2/1/93)0
02/02/1993ICN #0034 Correspondence letter opposing application, filed by S. Beery.0
02/02/1993ICN #0033 Correspondence letter opposing application, filed by J. Leeper.0
02/01/1993ICN #0032 Correspondence letter opposing the proposed transmission line, filed by D. Hall.0
01/25/1993ICN #0031 Motion to withdraw application and memorandum in support filed on behalf of American Municipal Power- Ohio, Inc. by J. Bentine.0
01/20/1993ICN #0030 Motion for waiver of the Board's rules and motion to intervene and memorandum in support filed on behalf of Duane Stinemetz by M. Christensen.0
01/14/1993ICN #0029 Staff report filed.0
01/14/1993ICN #0028 Letter to B. M. Miller, Ohio Edison, stating that the amendment to the certified application for the Crissinger-Tangy 138 kV Project was filed on 12/31/92 and application fee should be submitted, filed by K. Wissman, PUCO staff.0
01/13/1993ICN #0027 Transcript filed for hearing held 1/5/93, (SF), 40 pgs., Con't. (Public hearing - Richwood, Ohio)0
01/08/1993ICN# 0026 Letter filed by John Rodenbaugh opposing the application of Ohio Edison.0
12/31/1992ICN #0025 Company's amendment to the certified application, filed by B. Miller.0
12/23/1992ICN #0024 Entry ordering that Ohio Edison file its amend- ment to its application by 12/31/92; that the staff delay the issuance of its staff report until 15 days after the filing of the amendment; scheduling the non-adjudicatory hearing at 7:00 p.m. on 1/5/93 at North Union High School, Richwood, Ohio; ordering that the adjudicatory hearing be continued until 2/16/93 at 10:00 a.m. at the Commission offices. (OPSB)0
12/21/1992ICN #0023 Notice of intent to amend certified application, motion to hold issuance of staff report and evidentiary hearings in abeyance and memorandum in support filed on behalf of applicant by M. Beiting.0
12/15/1992ICN #0022 Supplemental response to request for production of documents No. 9 and supplemental response to Paragraph 17 of Completeness REview letter of February 12, 1992, filed on behalf of applicant by M. Beiting.0
12/11/1992ICN #0021 Entry granting AMP Ohio's motion to intervene on behalf of itself and on behalf of the Village of Prospect. (OPSB)0
12/09/1992ICN #0020 Response to the staff of the Ohio Power Siting Board's first request for production of documents and first set of interrogatories, filed on behalf of Ohio Edison by M. Beiting.0
12/04/1992ICN #0019 Correspondence letter opposing application, filed by C. Finks.0
12/04/1992ICN #0018 Correspondence letter opposing application, filed by P. Stoycheff.0
11/06/1992ICN #0017 Proofs of publication filed on behalf of applicant by T. Burgess.0
11/02/1992ICN #0016 Reply memorandum in support of motion to inter- vene, filed on behalf of American Municipal Power-Ohio, Inc. by J. Bentine.0
10/23/1992ICN #0015 Memorandum contra to American Municipal Power- Ohio, Inc. motion to intervene, filed on behalf of applicant by M. Beiting.0
10/16/1992ICN #0014 Entry scheduling public hearing at 7:00 p.m. on 1/5/93 at the North Union High School, Richwood, Ohio; adjudicatory hearing will commence at 10:00 a.m. on 1/6/93 at the Commission offices. (OPSB)0
10/14/1992ICN #0013 Application inserts filed on behalf of applicant by T. Burgess.0
10/09/1992ICN #0012 Motion to intervene and memorandum in support filed on behalf of American Municipal Power-Ohio, Inc. by J. Bentine.0
10/02/1992ICN #0011 Affidavit of Service filed on behalf of applicant by B. Miller.0
09/03/1992ICN #0010 Letter to Mr. B. M. Miller stating that this project has today been certified as being complete, filed on behalf of the OPSB staff by Chairman Glazer.0
08/21/1992ICN #0009 Supplemental information of the Richwood Sub- station Expansion, filed on behalf of applicant by B. Miller.0
06/05/1992ICN #0008 Response to completeness review, filed on behalf of applicant by B. Miller.0
04/02/1992ICN #0007 Notice of appearance filed on behalf of the State of Ohio Power Siting Board by E. Leidner and L. Angell.0
02/13/1992ICN #0006 Letter to Mr. B. M. Miller, Ohio Edison, stating that the application for the Crissinger-Tangy 138 kV project has been deemed incomplete, and listing the specific deficiencies to be corrected, filed on behalf of the OPSB staff by Chairman Craig A. Glazer.0
12/13/1991ICN #0005 Application filed on behalf of applicant by B. Miller.0
08/05/1991ICN #0004 Entry granting Ohio Edison Company's request for waiver of the 20 percent limitation set forth in Rule 4906-5-03(A)(2)(a)(iii), O.A.C. (OPSB)0
07/25/1991ICN #0003 Motion for waiver and memorandum in support filed on behalf of applicant by M. Beiting and Rick Giannantonio.0
07/10/1991ICN #0001 In the matter of the application of Ohio Edison Company for certification of the Crissinger-Tangy 138 kV Electric Transmission Line Project.0
07/10/1991ICN #0002 Letter and copy of check showing payment of $2,275 for pre-application conference fee, filed on behalf of applicant by T. Burgess.0