10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates.
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates
10/16/2000 ICN #0035 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.)
09/30/1991 ICN #0034 Letter notifying Commission that the Nottingham 138kV Substation was energized and placed in service on September 5, 1991, filed on behalf of applicant by S. Louie.
09/09/1991 ICN #0033 Letter notifying Commission that construction at the Nottingham 138kV Substation was completed on August 13, 1991, and construction began on August 22, 1990, filed on behalf of applicant by S. Louie.
08/10/1990 ICN #0032 Letter stating that the City of Cleveland's contractor who will prepare the substation site will begin site activities on August l3, l990, filed on behalf of applicant by S. Louie.
06/25/1990 ICN #0031 Entry Nunc Pro Tunc ordering that the Board's Opinion, Order, and Certificate issued on April 30, l990, in this case be modified, Nunc Pro Tunc, as indicated in Finding (5); all other respects the board's Opinion, Order, and Certificate issued on April 30, l990, remain in full force and effect. (OPSB)
05/10/1990 ICN #0030 Letter confirming their understanding that the Staff of the OPSB and CEI recognize that the plan referred to in Section IV (4), page 9, of the Opinion, Order and Certificate of the OPSB in this proceeding, issued April 30, l990, is the plan fully described in Section III, therein, to address erosion, sedimentation, changes in surface runoff patterns, and other impacts to nearby surface waters, filed on behalf of CEI by C. Smith.
04/30/1990 ICN #0029 Opinion, Order, and Certificate approving the joint stipulation of findings and recommendations submitted in this proceeding; Certificate of Environmental Compatibility and Public Need for the Nottingham l38kV Substation Project is hereby issued to allow the construction, operation, and maintenance of such facility; certificate shall contain the conditioins set forth in Section IV of the Opinion. ((OPSB)
04/26/1990 ICN #0028 Transcript filed for hearing held 4/16/90, (KPW), 9 pgs., Submitted.
04/16/1990 ICN #0027 Joint stipulation filed on behalf of applicant by C. Smith and OPSB by L Angell.
04/13/1990 ICN #0026 Transcript filed for hearing held 4/5/90, (KP), 5 pgs., Con't.
04/12/1990 ICN #0025 Entry granting joint motion for a continuance of the adjudicatory hearing. (OPSB)
04/12/1990 ICN #0024 Second request for a continuance filed on behalf of applicant by C. Smith, and Staff by M. Malone.
04/03/1990 ICN #0023 Entry granting the joint motion for a continuance of the adjudicatory hearing in this matter. (OPSB)
03/30/1990 ICN #0022 Joint request for a continuance, and memorandum in support filed on behalf of applicant by C. Smith and the OPSB Staff by M. Malone.
03/27/1990 ICN #002l Filing of Correspondence filed on behalf of applicant by C. Smith.
03/23/1990 ICN #0020 Correspondence letter filed on behalf of CEI by D. Douglas.
03/21/1990 ICN #00l8 Notice of appearance of Margaret A. Malone filed on behalf of the State of Ohio Power Siting Board by L. Angell.
03/21/1990 ICN# 0019 Staff report filed.
03/20/1990 ICN #00l7 Notice of Appearance filed on behalf of the State of Ohio Power Siting Board by L. Angell.
03/20/1990 ICN# 0016 Flood insurance rate map filed on behalf of the applicant by C. Smith.
03/20/1990 ICN# 0015 Additional information filed on behalf of the applicant by D. Douglas.
03/16/1990 ICN #00l4 Correspondence of March l4, l990, to the Corps of Engineers filed on behalf of applicant by C. Smith.
03/15/1990 ICN# 0013 correspondence by CEI to the corps of engineers filed by C. Smith.
02/16/1990 ICN #0012 Response to the Corps of Engineers' letter requesting information about the Nottingham preferred site filed on behalf of CEI by C. Smith.
02/15/1990 ICN #0011 Proof of Publication filed. (Cuyahoga County)
02/05/1990 ICN# 0010 Letter filed on behalf of the applicant in response to Dames & Moore's November 17, 1989 letter sent to public officials filed by C. Smith.
01/26/1990 ICN #0009 Entry scheduling hearing for 4/5/90 at 7:00 P.M. at the Euclid City Hall, Council Chambers, 585 East 222nd Street, Euclid, Ohio and adjudicatory hearing for 4/6/90 at l0:00 A.M. at the Offices of the Commission; ordering notice of hearing be published by company. (AE)
01/23/1990 ICN# 0008 Letter filed on behalf of the Ohio Historic Preservation Office stating that the application filed by CEI meets their approval filed by R. Luce.
01/23/1990 ICN# 0007 Letter filed on behalf of the applicant stating that the OPSB will distribut copies of the application to various agencies filed by C. Smith.
01/23/1990 ICN# 0006 Letter filed on behalf of the applicant enclosing the check for the cost of the application filed by C. Smith.
01/22/1990 ICN #0005 Proof of service for the application for the referenced substation filed on behalf of applicant by C. Smith.
01/17/1990 ICN #0004 Letter stating application for the Nottingham l38 kV Substation received 12/14/89 has today been certified as complete in accordance with O. A. C. Rule 4906-l-l4 filed on behalf of the PUCO Staff by Chair Butler.
12/14/1989 ICN# 0003 In the matter of the application of CEI for a certificate of environmental compatibility for the Nottingham 138 kV substation.
12/11/1989 ICN# 0002 Entry granting CEI's request for a one year waiver of the filing requirements. (OPSB)
11/20/1989 ICN 0001 In the matter of the Cleveland Electric Illuminating Company's request for waiver of the one year statutory requirement found in Ohio Revised Code Section 4906.06.