10/16/2000
|
ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. |
10/16/2000
|
ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates
|
10/16/2000
|
ICN #0015 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.) |
05/27/1993
|
Semi-annual report filed on behalf of Ohio Edison by T. Burgess. |
07/13/1992
|
Report of citizen complaints and equipment problems during the period from April 27, 1991 through April 26, 1992, filed on behalf of applicant by T. Burgess. |
07/07/1992
|
Letter stating that the licensed applicator for herbicide is Asplundh Tree Expert Company and commencement of appli- cation will begin by July 27, 1992, filed on behalf of applicant by T. Burgess. |
06/19/1992
|
Letter stating that the Aetna-West Akron 138 kV trans- mission line relocation of the West Akron-Botzum Junction Section was completed on April 3, 1991 and energized for commercial operation on April 27, 1991, filed on behalf of applicant by T. Burgess. |
04/12/1990
|
Letter stating that applicant may proceed with construction of Facility, filed on behalf of Staff by J. Kennedy. |
04/12/1990
|
Plan and Profile drawing (TZ-332-F, Sheets l, 2 & 3) for the Aetna-West Akron l38 kV Line Relocation Project (West Akron-Botzum Junction Portion), filed on behalf of applicant by T. Burgess. |
07/06/1989
|
Proof of Publication filed |
06/26/1989
|
Entry and Order issued, ordering that Ohio Edison's applica- tion to amend the certificate granted in this case on 9/28/81 is hereby granted, and that said certificate shall be invalid after 5/5/92 if construction of the facility has not commenced. |
06/26/1989
|
Proof of Publication filed. |
05/22/1989
|
Entry ordering Ohio Edison's amendment application be accepted for filing; Ordering a public hearing is not re- quired in this case; Ordering that the company's request for modification of the fee requirement is granted. (AE) |
05/01/1989
|
Affidavit of Service filed by C. Fleming on behalf of applicant. |
04/20/1989
|
Application to amend Certificate Aetna-West Akron 138 kV: Line Relocation (West Akron-Botzum Junction Portion/Amend- ment No. 2, filed by M. Beiting on behalf of applicant. |
08/02/1986
|
Beginning Aug 3, 1986 all Power Siting Board and Forecasting cases are transferred into the Docketing Information System Previous number for this case was : 02-00040 |
07/30/1986
|
Closed case |