CASE NUMBER: 15-1122-EL-BLN
CASE DESCRIPTION: Bayshore-Fostoria Central and Bayshore-Monroe 345kV Transmission Line Extensions to Lallendorf Substation Project
DOCUMENT SIGNED ON: 4/25/2024
DATE OF SERVICE: ________________________________________
05/18/2016 Letter of Notification that construction on the Bayshore-Fostoria Central and Bayshore-Monroe 345 kV transmission Line Extensions to Lallendorf Substation Project was completed on May 12, 2016 filed by N. Bryksenkova on behalf of FirstEnergy.
10/19/2015 Letter stating that construction on Bayshore-Fostoria Central and Bayshore-Monroe 345 kV Transmission Line Extensions to Lallendorf Substation Project is expected to begin on approximately October 30, 2015 filed by N. Bryksenkova on behalf of FirstEnergy Service Company.
09/23/2015 Staff Report of Investigation electronically filed by Mrs. Yvonne W Cooper on behalf of Staff of OPSB.
07/10/2015 Proof of Pub: in The Blade newspaper electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc.
07/01/2015 In the matter of the letter of notification of the Bayshore-Fostoria Central and Bayshore-Monroe 345kV Transmission Line Extensions to Lallendorf Substation Project.